BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 49766

Derbyniwyd: 19/07/2012

Ymatebydd: Prof & Mrs J.K.A. Bleasdale

Crynodeb o'r Gynrychiolaeth:

There will be a lot of extra traffic generated by locations 2 and 3. The proposed alterations to the Banbury/ Myton Road is unlikely to solve the problem.
Removal of the green belt which acts as a buffer will lead to urban sprawl.
The infrastructure provided is too weak to cope with the demand.

Testun llawn:

As scanned.

Atodiadau: