BASE HEADER

Gwrthwynebu

Preferred Options

ID sylw: 50522

Derbyniwyd: 02/08/2012

Ymatebydd: Barbara Wyatt

Crynodeb o'r Gynrychiolaeth:

THe flood risks could increase in Valley Road as hard water surfcae would increase with development. THe speed of run off would increase.
More needs to be done to alleviate flood risk. Increased run off may lead to increase pollution levels.

Testun llawn:

As scanned.

Atodiadau: