Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52159

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Anne Cooke

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52169

Derbyniwyd: 27/07/2012

Ymatebydd: Cath Slater

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52179

Derbyniwyd: 27/07/2012

Ymatebydd: Christine Allen

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52189

Derbyniwyd: 27/07/2012

Ymatebydd: Mary Butler

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52199

Derbyniwyd: 27/07/2012

Ymatebydd: Diane Corless

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52209

Derbyniwyd: 27/07/2012

Ymatebydd: Emma Nicholas

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52219

Derbyniwyd: 27/07/2012

Ymatebydd: Cllr Clare Hopkinson

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52229

Derbyniwyd: 27/07/2012

Ymatebydd: A Law

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52239

Derbyniwyd: 27/07/2012

Ymatebydd: Jon Waite

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52249

Derbyniwyd: 27/07/2012

Ymatebydd: Anna Waite

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52259

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Robert Cammidge

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52269

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Robert Cammidge

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52279

Derbyniwyd: 27/07/2012

Ymatebydd: Nick Jaffray

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52289

Derbyniwyd: 27/07/2012

Ymatebydd: Mr & Mrs P Harris

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52299

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Simon Primrose

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52309

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Anna Green

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52319

Derbyniwyd: 27/07/2012

Ymatebydd: mr malcolm henchley

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52329

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Adrian Hopkinson

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52339

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Michael Killeen

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52349

Derbyniwyd: 27/07/2012

Ymatebydd: Anne Joynson

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52359

Derbyniwyd: 27/07/2012

Ymatebydd: Matthew Sparkes

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52369

Derbyniwyd: 27/07/2012

Ymatebydd: E James

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52379

Derbyniwyd: 27/07/2012

Ymatebydd: Neil Patchett

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52389

Derbyniwyd: 27/07/2012

Ymatebydd: Angie Kenny

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52399

Derbyniwyd: 27/07/2012

Ymatebydd: Alex Mellon

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52409

Derbyniwyd: 27/07/2012

Ymatebydd: Isabel Jackson

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52419

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Julia Robins

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.
Definitions:
NPPF-National Planning Policy Framework: WOe-Warwick District Council: SOC-Stratford upon Avon District Council
Agent's contact details:

Gwrthwynebu

Preferred Options

ID sylw: 52429

Derbyniwyd: 27/07/2012

Ymatebydd: Darren Nicholas

Crynodeb o'r Gynrychiolaeth:

Agree with need to generate opportunities for employment within the district, but the application of policy at a micro level is seriously flawed. Housing needs to be nearer to employment opportunities and Norton Lindsey has no employment opportunities and as a small village cannot support any.

Testun llawn:

Standard Response Representation Attached. Text copied below:

Norton Lindsey Village response to Warwick District Council consultation May 2012
New Local Plan Preferred Options
Sheet 1 of 1
Which document are you responding to? Preferred Options (Full Version)
Which part of the document are you responding to? Preferred Option 1 (P01)
Paragraph number I Heading I Subheading (if relevant) - 5.6, 5.10, 5.12, 5.13, 5.15, 5.18,5.22
What is the nature of your representation? OBJECT
Part 1 -Setting the Scene and Summary
P01 - Preferred Level of Growth
OBJECT
It is agreed that some growth will be required during the 2014-2029 period to sustain an
economic and vibrant economy. An increase in homes of appropriate tenures will be
required but the level of growth based on the economic predictions certainly over the
next five years seems excessive especially when viewed against the economic
backdrop. This comment is supported by Office of National Statistics data which reveals
that the rate of increase of Gross Domestic Product has been falling since mid 2010 and
has yet to show signs of recovery. On this basis growth has been downgraded to 0.7%
from 0.8%. Predictions from the respected International Monetary Fund have revised
expectations of growth of 0.8% down to 0.2% with a very modest almost "flat
lining"growth of 0.6% in 2013. Accordingly the base figures being utilised are over
stated.
We believe that the demand for further housing in Norton Lindsey is limited and can be
adequately met by windfall sites and as has been historically the case utilising previously
used land and buildings.
Changes to Preferred Option 1 -adopt a more conservative growth pattern to
reflect market conditions which are likely to prevail over the first half of the Plan
period.