BASE HEADER

PO14: Transport

Yn dangos sylwadau a ffurflenni 61 i 90 o 101

Cefnogi

Preferred Options

ID sylw: 48779

Derbyniwyd: 06/07/2012

Ymatebydd: Peter and Philippa Wilson

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

We need more & better cycle routes to encourage people to leave their cars at home.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 48835

Derbyniwyd: 03/08/2012

Ymatebydd: Warwickshire County Council - Environment & Economy Directorate

Crynodeb o'r Gynrychiolaeth:

It is recommended that reference be made to the Natural Environment White Paper (2011) and the importance of transport networks and ecological connectivity assets.

Gwrthwynebu

Preferred Options

ID sylw: 48896

Derbyniwyd: 27/07/2012

Ymatebydd: B. J. Taylor

Crynodeb o'r Gynrychiolaeth:

Maintenance of green belt is essential to preserve indivual charachter of Kenilworth and Leamingon. This will be destroyed with the proposed northern relief road.

I have no confiende that, were such development to be allowed it would only be a matter of time before the suggested 'green wedge' to the west of the development would also receive planning permission, destroying the individuality of Leamington, Old Milverton, Leek Wootton and Kenilworth

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 48912

Derbyniwyd: 19/07/2012

Ymatebydd: Royal Leamington Spa Town Council

Crynodeb o'r Gynrychiolaeth:

Support the option to minimise the need to travel, and to promote sustainable forms of transport.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48946

Derbyniwyd: 18/07/2012

Ymatebydd: Clive Stone

Crynodeb o'r Gynrychiolaeth:

Objects to the creation of a cycle route through Abbey Fields. In other parks these have been the subject of friction between cyclists and pedestrians using the park for relaxation, with younger cyclists often completely ignoring the boundaries of the track.
An alternative route would be to turn off from the Kenilworth Road left along Hyde Road , Abbey Hill across the top of the Abbey Fields, down either Forrest Road, or down Abbey End and Warwick Road into Town and right into Randall Road.

Gwrthwynebu

Preferred Options

ID sylw: 48952

Derbyniwyd: 15/10/2012

Ymatebydd: Laura Bates

Crynodeb o'r Gynrychiolaeth:

Building on Thickthorn site will increase congestion in Kenilworth and Leamington. What plans could possibly improve situation which develops before traffic lights on Warwick Road at Sainsburys.
Can alter island at Jet filling station, widen top of Birches Lane and alter A46 island but whether there's a road out of development into Birches Lane or out onto A452 Leamington Road, doesn't alter fact that there will be 770 new homes which will have cars who will be joining these roads.

Gwrthwynebu

Preferred Options

ID sylw: 49104

Derbyniwyd: 18/07/2012

Ymatebydd: Jim Dunlop

Crynodeb o'r Gynrychiolaeth:

Only people that misuse "no cycling" rule in Abbey Fields appear to be schoolboys.
NO Cycling signs virtually invisible at entrances and need repainting/enforcement as priority.
Link from Bridge street to Castle Farm:
All cycle routes proposed are to safely increase cycle use and protect cyclists from traffic.
Current path from Bridge street to Swimming pool is used by young children, vehicles and cyclists.
Also passes childrens' playground. Not a Safe mix.
Proposal that bowling green should become children's playground. Children would then run down hill from Church car park across current path into playground.
Forecast that this will be more dangerous if there are cyclists, pedestrians and vehicles going to pool.
"Health and Safety"
Current paths inadequate for cyclists and pedestrians: require modification.
Any path allowing cycling across Abbey Fields should be wide for all requirements.
Modification to current path from Bridge street not the solution.
Suggest new cycle route be considered, built on south side of Brook.
Enter under Bridge Street bridge. Path requires improvement: flooding and steps. Then across wooden bridge south of Brook, along south side of brook joining paths to Castle Road/ Farm.
What do English Heritage think of any changes in Abbey Fields conservation area?

Gwrthwynebu

Preferred Options

ID sylw: 49107

Derbyniwyd: 20/07/2012

Ymatebydd: Roy Shearing

Crynodeb o'r Gynrychiolaeth:

Object to any plans to open up Abbey Fields to cyclists, especially a right of way for Sustrans.
Protected Heritage site with no justification for allowing change to current status of Fields to allow for cycle path.
Are alternatives and this option.
Abbey Fields does not lend itself to be used as short cut for cyclists and potential for abuse, accidents and debate for further erosion of site by allowing other wheeled vehicles should not be supported by Councils in their strategic thinking.

Gwrthwynebu

Preferred Options

ID sylw: 49119

Derbyniwyd: 23/07/2012

Ymatebydd: Ian O'Donnell

Crynodeb o'r Gynrychiolaeth:

Consider suitable public transport links when developing new housing & business sites.

Gwrthwynebu

Preferred Options

ID sylw: 49124

Derbyniwyd: 27/07/2012

Ymatebydd: Bloor Homes

Crynodeb o'r Gynrychiolaeth:

This approach need to be reviewed and amended to ensure they do not jeopardise the delivery of planned development (NPPF para 173 and 174). This must be done to ensure the Plan is sound and should be done in consultation with developer interests.

Recommend use of LHDG docuement "Viability Testing Local Plans - Advice for planning practitioners"

As a result further work and amendments are required to PO5, PO6, PO12, PO14, PO18

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49131

Derbyniwyd: 23/07/2012

Ymatebydd: Ian O'Donnell

Crynodeb o'r Gynrychiolaeth:

Must consider suitable public transport links when developing new housing & business sites.

Cefnogi

Preferred Options

ID sylw: 49174

Derbyniwyd: 27/07/2012

Ymatebydd: Cllr. John Whitehouse

Crynodeb o'r Gynrychiolaeth:

Support the proposed option, in particular the strong emphasis on promoting sustainable forms of transport.

K2L is very important together with provision for bus lanes and bus priority schemes.

Need to improve routes and facilities for pedestrians and cyclists, and this should be the priority for infrastructure investment. Policies should be seeking to encourage residents to leave their cars behind for short-distance local trips - no need for multi storey car park.

Although opposed by some a cycle route through Abbey Fields would become an important link between the west side of the town and C2K as well as Abbey Fields being a desination in itself.

Transport infrastructure to support a new Thickthorn housing and employment development, for the reasons stated earlier a high priority should be given to sustainable transport options.

this site also offers the opportunity to create an important new link road between the traffic island over the A46 by-pass and the eastern side of Kenilworth.



Gwrthwynebu

Preferred Options

ID sylw: 49198

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Jonathan Parkhouse

Crynodeb o'r Gynrychiolaeth:

There is already extensive congestion in the area.
More employment toward Coventry will result in more cross twon journeys. Given constraints caused by the Avon bridge and town centre traffic calming, the proposed traffic improvements are unlikely to work.
Air quality is likely to reduce due to increase in traffic. This is inconsistent with the AQ Action Plan
The population has already increased much faster than average meaning infrastructure is a capacity.

Gwrthwynebu

Preferred Options

ID sylw: 49217

Derbyniwyd: 23/07/2012

Ymatebydd: Mr Nigel Hamilton

Crynodeb o'r Gynrychiolaeth:

For plan to be sustainable, need to be more vision for integrated public transport.
Work with WCC to ensure communities served by dedicated cycle way within urban areas funded by developers.via CIL.
Job provision in north but affordable housing in south - how will they commute?
Smaller housing developments needed within walking/cycling distance of job provision.
Inter nodal bus routes essential.
Low paid workers need to commute quickly and cheaply.
Inter town express bus routes linking together would achieve this (in 20-30 mins).
Ineffective public commuter transport compounds inequality.
Virtual P&R means extended bus route.

Gwrthwynebu

Preferred Options

ID sylw: 49301

Derbyniwyd: 25/07/2012

Ymatebydd: Mrs Amanda Baylis

Crynodeb o'r Gynrychiolaeth:

Transport - High volume of existing traffic in Hampton Magna since the opening of Warwick Parkway, and roads are suffering from wear and tear and high speed of cars and Lorries. This would increase with the proposal - existing problems should be dealt with now.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49315

Derbyniwyd: 17/07/2012

Ymatebydd: Mrs Peggy Ellis

Crynodeb o'r Gynrychiolaeth:

To make any impact on congestion in Warwick there needs to be Park and Ride on all 3 roads into Warwick.
- Birmingham Road, Banbury Road and Stratford Road.
- One Park and Ride into Warwick is not enough
If these were in situ all school children being taken by car to schools should be encouraged to take Park and Ride. Consultations need to take place at schools.
Traffic in town centre caused by school run.

Gwrthwynebu

Preferred Options

ID sylw: 49347

Derbyniwyd: 09/07/2012

Ymatebydd: Mr J Lucas

Crynodeb o'r Gynrychiolaeth:

No mention of Leamington being transition town. How about banning car completely in town?

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49614

Derbyniwyd: 20/07/2012

Ymatebydd: Mr Christopher Ainslie

Crynodeb o'r Gynrychiolaeth:

The proposed link road to the M40 would increase traffic on the Barford Road. As no pavements exist the increased traffic will make it more dangerous. The road is already dangerous for pedestrians and this will only get worse.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 49693

Derbyniwyd: 25/07/2012

Ymatebydd: Mrs Lynn Hunt

Crynodeb o'r Gynrychiolaeth:

Support the Council in objecting to HS2
Support the strategy to reduce minimise the need to travel and to promote sustainable form of trasnport
Support improved rail facilities - new housing should have good access to rail.
Reservations about the park and ride as may not be delivered and may not be well used without incentives. It is unlikely to save time if it is only a couple of miles from the town centre.
Housing at Blackdown would encourage more journeys by car as it is not well located for food stores, trown centre, railway station or employment

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50009

Derbyniwyd: 24/07/2012

Ymatebydd: Mrs Sandra Barnwell

Crynodeb o'r Gynrychiolaeth:

Turning the A452 in to dual carriagewy will not help ease congestion and will damage the northern approach to Leamington.
Building 3000 houses north of Leamington will increase congestion.
The LNRR is not required as traffic flows tend to be north to south rather east to west. It will also encourage development up to the road in the long run.
Development should be concentrated to the south of Leamington which would mean the LNRR is not required.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50011

Derbyniwyd: 24/07/2012

Ymatebydd: Mr Dennis Michael Crips

Crynodeb o'r Gynrychiolaeth:

Suggests improvements to roads and public transport will only come from new developments. Unlikely to fund extensive increases in highway infrastructure required.
Fundamental problem about alternative routes is that of north-south river crossing of river canal system. Without an alternative Castle Bridge will be route of choice, however congested. Strategy must reverse situation and ensure Warwick Town Centre no longer route of choice for through traffic.
Alternative would be 3km tunnel between Europa Way and Guys Cliffe to take all new and existing traffic. May be radical but works abroad.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50076

Derbyniwyd: 25/07/2012

Ymatebydd: Mr John Sharp

Crynodeb o'r Gynrychiolaeth:

The only road through hampton Magna and Hampton-on-the-Hill is currently overloaded. With the building of an additional 222 car parking spaces at warwick Parkway Station there is the prospect of even more traffic using the road.
WDC state that they wish to mitigate against negative transport impacts such as additional congestion. WDC and WCC Highways need to find a way to limit the volumes of traffic through the villages before a serious accident is caused by overcrowded roads.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 50182

Derbyniwyd: 18/07/2012

Ymatebydd: Mr & Mrs Roy Hadfield

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

Support the District Council in opposing HS2 and support the plans for a station at Kenilworth.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50184

Derbyniwyd: 09/07/2012

Ymatebydd: Dr Phillip Oliver

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

Object to planned changes to the A452 and A46. These proposals are suggested as being required doe to increased traffic as a result of development. However, the proposals will make little difference as the bottleneck is from the junction with Northumerland Road towards the Town Centre. This cannot be improved and more traffic will therefore make congestion worse.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50191

Derbyniwyd: 27/07/2012

Ymatebydd: Mr Graham Romer

Crynodeb o'r Gynrychiolaeth:

The Council should be supportive of HS2 as it will improve links to the north, create employment opportunities and will reduce the trwend in migration to to the South East and therefore reduce pressure to build so many houses in Warwick District.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 50222

Derbyniwyd: 25/07/2012

Ymatebydd: Ms Nicola Hunt

Crynodeb o'r Gynrychiolaeth:

Support the Council in objecting to HS2
Support the strategy to reduce minimise the need to travel and to promote sustainable form of trasnport
Support improved rail facilities - new housing should have good access to rail.
Reservations about the park and ride as may not be delivered and may not be well used without incentives. It is unlikely to save time if it is only a couple of miles from the town centre.
Housing at Blackdown would encourage more journeys by car as it is not well located for food stores, trown centre, railway station or employment

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50250

Derbyniwyd: 03/08/2012

Ymatebydd: Cllr Elizabeth Higgins

Crynodeb o'r Gynrychiolaeth:

I think the people of Warwick worry about the air quality in its town centre. There are laws about Air Quality in town centres. I have already been on the Environmental Health dept to enquire whether the fumes in High St/Jury St are lessening because of the traffic calming and I am assured that it is too early to monitor yet. Therefore, these plans are unacceptable to put an extra 27% of traffic on to our crowded streets.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50274

Derbyniwyd: 03/08/2012

Ymatebydd: Cllr Elizabeth Higgins

Crynodeb o'r Gynrychiolaeth:

No way that Warwick's fragile infrastructure of roads and bridges can cope with a 27% increase in traffic. Junction and carriageways are below national standards and accidents can cause absolute grid-lock in the town. The Earl of Warwick built bridge (dating from 1797) has been the location for a serious fatal accident. There are also locations in Warwick which cause considerable congestion and re-routing of traffic due to historic infrastructure (e.g. rail bridge near Salisford).

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50276

Derbyniwyd: 10/07/2012

Ymatebydd: Mr Michael Killeen

Crynodeb o'r Gynrychiolaeth:

Little public transport in Norton Lindsey village. More is unlikely on economic grounds and would present significant traffic problems due to nature of village roads.
Public transport would add to carbon emissions in addition to those added by new development.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50287

Derbyniwyd: 10/07/2012

Ymatebydd: Mrs Anne French

Crynodeb o'r Gynrychiolaeth:

Little public transport in Norton Lindsey village. More is unlikely on economic grounds and would present significant traffic problems due to nature of village roads.
Public transport would add to carbon emissions in addition to those added by new development.

Atodiadau: