BASE HEADER

RDS1: The Council is adopting an Interim Level of Growth of 12,300 homes between 2011 and 2029

Yn dangos sylwadau a ffurflenni 301 i 330 o 331

Gwrthwynebu

Revised Development Strategy

ID sylw: 60272

Derbyniwyd: 26/07/2013

Ymatebydd: Mr Harry Johnson

Asiant : Bond Dickinson LLP

Crynodeb o'r Gynrychiolaeth:

The level of housing growth currently envisaged by the Council may be understated. Believe that more than 550 new homes per annum may be required to meet local housing needs. Even if the Council's current estimate eventually proves to be the correct figure we believe that more land needs to be allocated to ensure that needs are met.

The Council is adopting a level of growth which is less than the higher end of the previous SHMA assessment and also less than previous economic and demographic forecasts have indicated. It is contended the Council is being excessively cautious in its assumptions for future housing need.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60342

Derbyniwyd: 28/07/2013

Ymatebydd: Mrs Amanda Griffin

Crynodeb o'r Gynrychiolaeth:

There is little evidence to support the production of the total overall requirement of over 12,000 houses in the overall Local Plan.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60345

Derbyniwyd: 26/07/2013

Ymatebydd: Mr Neil Chisholm

Crynodeb o'r Gynrychiolaeth:

Projected that the housing needs to 2029 should be 12,300 new homes; where the need to meet local requirements based upon previous expansion plans suggest that this figure should be 5,400.

Concerned that the Council has not consulted Stratford upon Avon District Council on its plan who are planning a village around Junction 12 on the M40 which again would add to transport problems in and around Warwick. Are we in a position of double accounting for the number of homes that are required in the south. Has this been taken into account when estimating the Districts needs?

Current plan is a developer's charter and it would be more logical to release land when there is a demand. There still needs to be a better balanced plan with building being allowed to be built in the north Leamington area.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60346

Derbyniwyd: 28/07/2013

Ymatebydd: Laura Ashley-Timms

Crynodeb o'r Gynrychiolaeth:

The overall numbers seem unreasonable and the research we have read suggests that less than half the 12,300 homes are needed.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60350

Derbyniwyd: 28/07/2013

Ymatebydd: Councillor Norman Colls

Crynodeb o'r Gynrychiolaeth:

Major flaws in the projected housing need of 12,500 and it is wrong to forecast up to 2029. To commit to build over this number of years will span many future elections, taking away rights to show disapproval through the ballet box. No Houses to the north of the towns on green field sites is a farce.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60370

Derbyniwyd: 27/07/2013

Ymatebydd: Mr Stephen McFadden

Crynodeb o'r Gynrychiolaeth:

The housing numbers are open to debate, and it is the opinion of many that these numbers have been very largely over estimated.

WDC has failed to take into account the large number of derelict and empty properties around the district which should be returned to full use before any new houses are considered. Also many private houses that are let to (transient) students in the district that could be brought back into use for people who wanted to live in them as their every day home.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60388

Derbyniwyd: 16/07/2013

Ymatebydd: G Walker

Crynodeb o'r Gynrychiolaeth:

The 12,300 homes appears to be solely based on acheiving a GVA increase of 2.4% without any reference to quality of life. The question that should be asked is what level of development can Warwick sustain and how do we mange that? A figure of 6000 homes has been sugested. Building 12,300 homes on greenfield sites is a contradicition in terms with the vision of the plan. It is evident that all the desirable social, economic and environmental targets are unobtainable together.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60407

Derbyniwyd: 29/07/2013

Ymatebydd: Mr Michael D Lord

Crynodeb o'r Gynrychiolaeth:

The proposed level of growth is far too high and will lead to traffic congestion. This is already a problem in Warwick. Air pollution is already too high and the proposals will exacerbate this.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60408

Derbyniwyd: 29/07/2013

Ymatebydd: Mrs Christine F Lord

Crynodeb o'r Gynrychiolaeth:

The proposed level of growth is far too high and will lead to traffic congestion. This is already a problem in Warwick. Air pollution is already too high and the proposals will exacerbate this.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 60418

Derbyniwyd: 28/07/2013

Ymatebydd: Paul Kalus

Crynodeb o'r Gynrychiolaeth:

The basis for the homes is population growth nationally. The amount of employment land within the plan would not fulfil the amount of local unemployment and create enough for the amount of housing proposed. Imposing massive growth on an area with little expansion of employment would create greater numbers of people who would have to commute to work, much to the detriment of the area and a poor location of people. District has already seen much development over recent years. Many still commute into Birmingham or London. Population has in fact increased by 12% since 2000, which is approximately 2x the rate of increase for Warwickshire; 2x the national average increase, and over 3x the increase for West Midlands. Therefore already significant recent development and population expansion.

Why do councils have to accommodate a certain amount of housing? Should the government not just be looking for appropriate sites for building?

New town suggested for Gaydon but not in Warwick District. Road improvements would be possible where air quality is not already in breach of regulation, and is perfect for links to the M40 and a rail station at Kings Sutton on the main line. To build one whole new site would be more cost effective in the long run. Stratford District have now put this area forward as part of their Local Plan. Can District Councils not communicate with each other? To have this large area developed as well as the south of Warwick District will create even more stress on the road structure towards Warwick.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60421

Derbyniwyd: 28/07/2013

Ymatebydd: Louise Kalus

Crynodeb o'r Gynrychiolaeth:

The basis for the homes is population growth nationally. The amount of employment land within the plan would not fulfil the amount of local unemployment and create enough for the amount of housing proposed. Imposing massive growth on an area with little expansion of employment would create greater numbers of people who would have to commute to work, much to the detriment of the area and a poor location of people. District has already seen much development over recent years. Many still commute into Birmingham or London. Population has in fact increased by 12% since 2000, which is approximately 2x the rate of increase for Warwickshire; 2x the national average increase, and over 3x the increase for West Midlands. Therefore already significant recent development and population expansion.

Why do councils have to accommodate a certain amount of housing? Should the government not just be looking for appropriate sites for building?

New town suggested for Gaydon but not in Warwick District. Road improvements would be possible where air quality is not already in breach of regulation, and is perfect for links to the M40 and a rail station at Kings Sutton on the main line. To build one whole new site would be more cost effective in the long run. Stratford District have now put this area forward as part of their Local Plan. Can District Councils not communicate with each other? To have this large area developed as well as the south of Warwick District will create even more stress on the road structure towards Warwick.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60424

Derbyniwyd: 26/07/2013

Ymatebydd: Alison Kelly

Crynodeb o'r Gynrychiolaeth:

The basis for the homes is population growth nationally. The amount of employment land within the plan would not fulfil the amount of local unemployment and create enough for the amount of housing proposed. Imposing massive growth on an area with little expansion of employment would create greater numbers of people who would have to commute to work, much to the detriment of the area and a poor location of people. District has already seen much development over recent years. Many still commute into Birmingham or London. Population has in fact increased by 12% since 2000, which is approximately 2x the rate of increase for Warwickshire; 2x the national average increase, and over 3x the increase for West Midlands. Therefore already significant recent development and population expansion.

Why do councils have to accommodate a certain amount of housing? Should the government not just be looking for appropriate sites for building?

New town suggested for Gaydon but not in Warwick District. Road improvements would be possible where air quality is not already in breach of regulation, and is perfect for links to the M40 and a rail station at Kings Sutton on the main line. To build one whole new site would be more cost effective in the long run. Stratford District have now put this area forward as part of their Local Plan. Can District Councils not communicate with each other? To have this large area developed as well as the south of Warwick District will create even more stress on the road structure towards Warwick.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60428

Derbyniwyd: 26/07/2013

Ymatebydd: Mr Charles Bartholomew

Crynodeb o'r Gynrychiolaeth:

The number of homes put forward is far too great. 12,300 is a drastic increase from the number in the previous draft version of the plan. There is evidence in the paper from Ray Bullen that 5,400 homes would satisfy the likely demand.

Gwrthwynebu

Revised Development Strategy

ID sylw: 60533

Derbyniwyd: 27/07/2013

Ymatebydd: Kenneth McEwan

Crynodeb o'r Gynrychiolaeth:

-Such a number of new homes contradict the vision that Warwick District Council has, "providing a mix of historic towns and villages set within a rural landscape of open farmland and parklands".

-Some housing maybe needed for organic growth within individual communities; however, I feel this should be decided at a local level with the support of the local people not imposed from the Government in a top-down approach as it is at the moment and certainly not to the numbers you are suggesting. Local sources put the number of required houses at approx. 5500 and this could be achieved organically by Brownfield and Windfall site development released over the required period.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63374

Derbyniwyd: 27/07/2013

Ymatebydd: Gallagher Estates

Asiant : Pegasus Group

Crynodeb o'r Gynrychiolaeth:


Duty to Cooperate:

The RDS provides little context, particularly the provisions of the NPPF and the importance of executing the Duty to Co-Operate introduced as a statutory requirement through the enactment of the Localism Act 2011. Such context would be of assistance in further iterations of the Local Plan.

This is particularly relevant to the RDS as the delivery of housing needs to be considered in the context of both the NPPF and the Duty to Co-Operate.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63375

Derbyniwyd: 16/07/2013

Ymatebydd: Stella Saad

Crynodeb o'r Gynrychiolaeth:

Would hope careful thought being given to need for this amount of new housing. Literature received by objectors states need for fewer than 6000 houses by 2030: Council proposing 12000! Do we need that amount or could it be smaller? Would expect that due thought is going into extra infrastructure needed alongside housing to sustain level of development?

Gwrthwynebu

Revised Development Strategy

ID sylw: 63379

Derbyniwyd: 29/07/2013

Ymatebydd: Councillor Philip Morris

Crynodeb o'r Gynrychiolaeth:

Infrastructure:
The number of new homes proposed will place huge pressure on existing and proposed infrastructure.

The infrastructure improvements required will be unaffordable and make the proposed developments unsustainable.

The WDC Draft Infrastructure Plan published in May 2012 allows for only 8250 new homes over the 18 years to 2029.

The new local plan proposes another 50% on top of this.

Where are the infrastructure improvements which are required to make the development sustainable going to come from?

Barford, Sherbourne and Wasperton have carried out several housing needs surveys in recent years, none of which gets genuine need to anywhere near the levels proposed in the initial consultation.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63390

Derbyniwyd: 23/07/2013

Ymatebydd: Andrew Cowden

Crynodeb o'r Gynrychiolaeth:

-12,300 homes are too many acccording to several studies.
-The local needs is for 6,000 homes by 2030.
-Warwick DC's consultants G.L.Hearn gave an Economic and Demographic Forecast Study in December 2012. In their opinion Proj5 arrived at only 4,405 new homes required. Other studies such as the Ray Bullen paper July 2012 using 2011 census data in 2013 back this up.
-We should be setting a level of new housebuilding which meets population growth not encouraging more people to move into the District.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63395

Derbyniwyd: 18/07/2013

Ymatebydd: Mr Keith Miles

Crynodeb o'r Gynrychiolaeth:

Plan needs to accurately reflect population growth and demand within district taking into account latest data from ONS. Believe that current plan massively overstates demand.
Situation made worse in South Leamington/Whitnash by `immigration` of students from Warwick University Many low-cost/first time suitable for `first time buyers` have been taken up by students.
Whitnash also takes higher level of immigration.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63410

Derbyniwyd: 29/07/2013

Ymatebydd: Dr Penny - Anne Cullen

Crynodeb o'r Gynrychiolaeth:

Our farmland provides us with food security and that must never be compromised.

Security and the economic and social well-being of our country is now under threat from over-population. Recognises some demand for local housing, in particular both social and affordable housing, but demand for so many houses in the area has been exaggerated. Crucial to any housing strategy is a population strategy and this has been sadly lacking.

NPPF fails to highlight or mention the need for food security and should include a security role. At this uncertain time we need to protect and maintain all our available farmland.

Much farmland lost to infrastructure and more will be lost with the construction of the new HS2 rail line. Cumulative effect of this land loss has to be recognised, as does the District's good past record in house building.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63420

Derbyniwyd: 26/07/2013

Ymatebydd: Mr & Mrs Adrian & Jackie Levett

Crynodeb o'r Gynrychiolaeth:

-A number of new homes needed remains uncertain, with research not yet concluded and widely differing opinions within communities. The holistic approach mentioned above must be protected which would be impossibly expensive with piecemeal ''pepper pot'' development if it turns out a lower number of homes were needed and all the development sites proposed were used. Perhaps some prioritisation or a hierarchy of sites is needed to allow a balanced scaling back if less homes are needed in the final analysis. The existing green belt should be protected unless the higher figure of 12,300 homes is actually needed.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63444

Derbyniwyd: 29/07/2013

Ymatebydd: Martin & Kim Drew & Barnes

Crynodeb o'r Gynrychiolaeth:

From 1991 to 2011 WDC population grew by 18% owing to major housing developments at Hatton, Warwick Gates etc. This was mostly cause by immigration not organic growth. Projected growth in the revised plan is 20% in 15 years which is largely based on immigration. On a projection of natural growth following a paper based on 20011 census data written by Bishop's Tachbrook Parish Councillor, Ray Bullen, and making allowances for migration, only 5400 homes are required. What's more, WDC's own figures prepared by G.L. Hearn (December, 2012) provided an economic and demographic forecast a figure of only 4405 new homes.
This figure is further reinforced by employment figures. WDC has very low unemployment at only 1.7%. WDC's figure for housing requirements must therefore be based on major immigration into the area. The 2012 SHMA stated that the overall WD had a very good job-homes balance. As the Gateway project South of Coventry allocates over 1300 jobs for WDC, it seems idiocy to build houses so far from a major area of new employment.
Growth is obviously necessary but not at this excessively high level. In simple terms if more houses are built more people will move here because of its attractiveness. This makes it unattractive due to overdevelopment.
Large housing development will create another soulless commuter estate for Birmingham and Coventry that lacks identity and social cohesion.
G. Renshaw (economist at Warwick University) says that ''estimating housing need in WD involves forecasting migration within the West Midlands including in particular outward migration from Coventry and Birmingham. This is where the methodology becomes completely unsound because migration into WD will depend on the availability of housing in WD and elsewhere so the reasoning is circular- supply creates its own demand.'' This problem actually affects every step of forecasting. Whatever level of housing provision is made by WDC those houses will always be occupied, thereby appearing to validate the forecast.
There is then the entirely separate question of the extent to which WDC should meet national and regional housing need. This depends on a whole host of environmental considerations such as transport links, preserving the green belt etc so there are further circularities in the reasoning here because these factors are also policy variables. It is perfectly reasonable to argue that environmental considerations should be given heavier weight than elsewhere in the region and therefore the appropriate contribution of WD to meeting national need is very small or even zero. The forecast of housing needs has the numerical value that gives it an entirely false precision whereas the environmental factors cannot be quantified.''

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63445

Derbyniwyd: 29/07/2013

Ymatebydd: John and Royna Belgrove

Crynodeb o'r Gynrychiolaeth:

No mention is made of the current employment at Gaydon, and the projected growth there. Presumably because it is on the Stratford side of the boundary. SDC are planning to build a substantial number of houses, shops, schools etc , close to the Gaydon source of employment. This is an example of development that will be 'Sustainable' in the future, not needing long trips by car for work, shops schools etc. WDC should also site a large development near there, in order to make the 'New Town' more viable, and to help to reduce the considerable car traffic that it already causing severe congestion in the area.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63452

Derbyniwyd: 28/07/2013

Ymatebydd: Mrs Ann Kelsey

Crynodeb o'r Gynrychiolaeth:

I would urge the council to keep the number of houses to a minimum and not accept more. It looks as though the legal requirement to liaise with Coventry and other surrounding towns, does not extend to a legal requirement to agree to their developing land within Warwick District. Perhaps if necessary, Stratford would build houses for Coventry as I understand their proposed settlement site near Gaydon is larger than the present requirements.

Cefnogi

Revised Development Strategy

ID sylw: 63478

Derbyniwyd: 17/07/2013

Ymatebydd: Old Milverton & Blackdown JPC

Crynodeb o'r Gynrychiolaeth:

The Parish Council does not seek to challenge the number of new houses included in the Revised Development Strategy. We understand that the Council has estimated future housing need in accordance with guidance issued by the coalition Government and that if the Local Plan contains too few houses there is a risk that it will be found unsafe at Public Enquiry. The Parish Council simply asks the Council to keep the housing requirement to a minimum. A Joint Strategic Housing Needs Analysis is being performed with Coventry City Council. Should this review identify that it is necessary to increase the housing numbers above those included in the Revised Development Strategy, the Parish Council believe that there is sufficient non Green Belt land to accommodate this additional development.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63489

Derbyniwyd: 29/07/2013

Ymatebydd: Friends of the Earth

Crynodeb o'r Gynrychiolaeth:

-Upon completing the Joint Housing Market Assessment, the number of homes required in the District should be stated more clearly. The figures in the consultation document are confusing.

-Housing numbers are very dependent on employment forecasts which are at best very variable. Section 4.1.9 specifically highlights the sensitivity of employment-led population projections. Understand the logic explained in paragraph 4.1.10 but development and investment should be concentrate in the major urban centres of the region and therefore local growth rate for the District should be much lower, not higher than that of the forecast growth rate for the region.

Gwrthwynebu

Revised Development Strategy

ID sylw: 63511

Derbyniwyd: 29/07/2013

Ymatebydd: Lenco Investments

Asiant : RPS Planning

Crynodeb o'r Gynrychiolaeth:

The Council has indicated that the 12,300 figure may change once the joint SHMA is published in August 2013. Given the evidence and that this is an interim figure, it has to be accepted that the figure will change and 12,300 is therefore not sufficiently robust. This is particular the case as there is no cross boundary element. Cross boundary arrangements will need to be implemented to facilitate the needs of Coventry in Warwick. 12,300 is evidence that WDC is unable to fix a definitive figure for its strategy given that it will have to accept addition need from Coventry. RPS therefore supports the increase in housing from the previous version of the plan to this Preferred Options document. However 12,300 is still insufficient. To meet Warwick's needs, let alone assisting with cross-boundary requirements.

The RDS as presented is currently not sound, justified or positively prepared based on the basis that 12,300 is only an interim figure. It is not clear how the evidence has actually informed or justified the final 12,300 figure.

The NPPF clearly sets out in paragraph 159 that LPA's should prepare a SHMA to assess their full housing needs and work with neighbouring authorities where housing markets cross administrative boundaries. The SHMA will also assess housing needs, population changes and migration and demographic changes. It is therefore clear that the need for a SHMA that addresses the cross boundary issues is required. The SHMA guidance also sets out that SHMA should include local economic forecasting as part of the housing needs evidence base.

Due to the cross boundary needs of Coventry it is vital that Warwick's own Objectively Assessed Need for market and affordable housing is established in accordance with paragraph 47 of the NPPF before any need associated with Coventry is considered. In this context, the Council has commissioned a number of studies including an updated SHMA which is due to be published in August 2013. However, until this is available the Council has based the interim figure on evidence already in the public domain. This presumably comprises principally the 2012 SHMA and the 2012 Economic and Demographic Forecasts Study (EDFS). These have been informed by a series of population and household projection, including some of the most recent 2011 census data.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63512

Derbyniwyd: 29/07/2013

Ymatebydd: Lenco Investments

Asiant : RPS Planning

Crynodeb o'r Gynrychiolaeth:

-Paragraph 4.16 outlines that the evidence in the updated SHMA indicates a range between 11,300 and 14,300 based upon demographic and economic scenarios. However it is not clear how these figures have been derived. According to Paragraph 4.1.8, the EDFS study identifies that the employment led population and household suggestions hat there is a need for between 13,300 and 13,800 additional homes between 2011 and 2029.
-In arriving at a final figure of 12,300 dwellings in paragraph 4.1.10 the Council's Revised Strategy, the justification appears to come from different a source of evidence and assumptions of GVA and 'economic modelling work' which is not apparent in the documents in the public domain.
-It is not clear in the evidence where this economic modelling is documented or justified, nor how it has considered the full range of scenarios assessed in detail in the Economic and Demographic Forecast Study. This is therefore not justified at present unless a clear audit of the evidence base can be demonstrated.
-Furthermore the assumptions about GVA are incorrect according to the Council's own evidence. The GVA evidence in the Councils forecasting study indicates that GVA for Warwick will outperform the West Midlands on its base forecast and will be as high as 2.9% by 2025 (Figure 5) compared to a figure of 2.6% for the west midlands. Given that the document consistently refers to the district outperforming the West Midlands it would therefore appear logical to plan on the basis of at least 2.9% rather than 2.4%. This is further substantiated by Figure 12 of the document indicating that the Gateway Development itself could increase GVA in Warwick District by between 8% and 10% over its base figure, thus it is likely to be in the region of 3% overall.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63514

Derbyniwyd: 29/07/2013

Ymatebydd: Lenco Investments

Asiant : RPS Planning

Crynodeb o'r Gynrychiolaeth:

In respect of cross-boundary requirements, the NPPF requires cross-boundary cooperation between Local Planning Authorities to ensure housing needs are met, in particular for those which cannot meet their needs within their own administrative boundaries, such as Coventry City Council. It is recognised that Coventry cannot meet their housing targets within their own administrative boundary, as the 2012 Coventry SHLAA indicates. Development is therefore necessary adjacent to the urban areas in cross-boundary locations, particularly into Warwick and Nuneaton and Bedworth authority areas to ensure Coventry's housing needs can be met, and ensure compliance with the NPPF. Therefore, Warwick District Council should work with Coventry to assist in providing a proportion of Coventry's housing requirement.

Atodiadau:

Gwrthwynebu

Revised Development Strategy

ID sylw: 63519

Derbyniwyd: 28/07/2013

Ymatebydd: Ms Alison Cox

Crynodeb o'r Gynrychiolaeth:

I am writing to object strongly to the plan to allocate almost 3,500 homes on land in South Warwick. My understanding is that arguments about the unfairness of housing distribution (although self evident) will have no affect. Neither will objections on the grounds that the character of the two towns will be lost forever (although this is inevitable given the extent of the planned build.) And so I am objecting because I do not believe that the issues of pollution, flooding and traffic flow have been properly considered and I am not persuaded by the plans I have seen for mitigating these issues.
Finally, my understanding is that the local need is for fewer than 6,000 new houses by about 2030, but that the District Council proposes more than 12,000, 4,500 of them south of Warwick. The Local Area Plan seems to be grossly excessive.