Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63208
Derbyniwyd: 17/01/2014
Ymatebydd: Sharba Homes
Asiant : PJPlanning
-The Landscape Sensitivity and Ecological and Geological Study follows considered methodology in respect of identification of the Landscape Character Parcels, not specific sites and there sensitivity to certain types of development. It therefore does not focus on each individual site but the wider area. It unlikely therefore that development on a given site at one end of the LCP is likely to retain the same constrains and opportunities as one at the other end and generate the same landscape and visual effects as one at the other end.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63212
Derbyniwyd: 17/01/2014
Ymatebydd: Sharba Homes
Asiant : PJPlanning
-Just because a site lies within a 'high sensitivity' land parcel, it does not follow that it cannot and should not be developed. This would imply that no development should take place in any landscape of high sensitivity, anywhere, whether it is one identified as such as part of a study like this one or a more valued designated landscape such as an AONB.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63214
Derbyniwyd: 17/01/2014
Ymatebydd: Sharba Homes
Asiant : PJPlanning
-The only site that has been included has been Site 1 Radford Semele directly adjacent the Parish Church and listed buildings. The LCP identified as RS_02 notes on several occasions how important this LCP is to the setting of the Church and associated buildings and defining the notable character of the village core. This is very arguably understated and should be in 'high sensitivity'.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63215
Derbyniwyd: 17/01/2014
Ymatebydd: Sharba Homes
Asiant : PJPlanning
The site specific work being carried out independently is leading to conclusions that Site 3 Radford Semele does retain capacity for residential development and is capable of being mitigated and would be acceptable in landscape and visual terms.
-Site 3 lies within High/medium sensitivity and is discounted on the basis of highways access, potential hedgerow loss, impact on the open corridor setting and incursion into open countryside. Unlike Site 1, elements such as views and the setting of listed buildings are not considered. How and why Site 3 has been discounted in the context of Site 1 being preferred?
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63217
Derbyniwyd: 17/01/2014
Ymatebydd: Sharba Homes
Asiant : PJPlanning
With reference to Site 6 Barford from Appendix 6 matrix:
-There is no reason to 'net' site down from 0.74 to 0.3 ha (Statement of Common Ground, Sharba Appeal).
-Development would not harm protected hedgerows or trees of significance on Site 6.
-Development would have no impact on the setting of the listed building. There is no intervisibility or remaining functional link between Barford House and Site 6.
-The site is currently abandoned, not 'Garden Land'.
-The Inspector at the recent Sharba Appeal concluded that development would meet the economic, social and environmental aspects of sustainable development as per NPPF.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63227
Derbyniwyd: 17/01/2014
Ymatebydd: Alliance Environment & Planning Ltd
-The approach to the identification of villages for rural growth is not robust and is premature ahead of a clear identification of an objectively assessed housing need.
-The methodology used for identifying the different scale and "sustainability" of villages is questioned, as is the nominal "cut-off" point between second-tier villages and "small and feeder villages".
-The overall housing target figure does not meet the Council's objectively assessed need.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63235
Derbyniwyd: 15/01/2014
Ymatebydd: Leek Wootton & Guy's Cliffe Parish Council
-Given the possibility that the Police HQ operations will remain for some years and traffic will then be increased by any new development of Site 4, there is a clear case for complete re-appraisal of the impact, including all possible solutions for the eastern end of Woodcote Lane and The Anchor Junction.
Cefnogi
Village Housing Options and Settlement Boundaries
ID sylw: 63331
Derbyniwyd: 15/01/2014
Ymatebydd: Mr Steve Williams
Baginton Parish Council welcomes the statement that the Green Belt and landscape assessment work has emphasised the need to protect the villages from coalescence with nearby large settlements. This is important as it helps to maintain the open setting, identity and character of Baginonm and protects it from urban sprawl.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63338
Derbyniwyd: 18/01/2014
Ymatebydd: Roger Mills
Traffic impacts for Hampton Magna need a proper independent assessment, which has hitherto not been carried out. Such assessment is likely to reach a conclusion which is very different from the current one.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63340
Derbyniwyd: 17/01/2014
Ymatebydd: Mr Stan Sabin
-According to WDC, Ceder Farm is some distance from the main village with no supporting facilities and is not perceived to be a sustainable approach to delivering housing.
-It is strange that not more than a few hundred yards away is WDC's proposed traveller's site. Strange how the 'supporting a sustainable approach to delivering housing' can change from one side of the A425 to the other.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63534
Derbyniwyd: 20/01/2014
Ymatebydd: Lenco Investments
Asiant : RPS Planning & Development
The current boundary of the allocation does not have regard to the sensitive landscape, the current visual aspect of the land, nor the need to ensure that the development positively contributes to the local environs. As such, the allocation does not have a logical landscape boundary, nor does it contain sufficient land within the allocation to provide environmental enhancement and landscaping on the approach to the village. Instead the allocation boundary follows an ownership boundary around two plots of land. The resultant impact of this is that the edge of the development plot will have a hard residential landscape edge to it rather than a natural landscape buffer that allows the development to interface with both the Conservation Area to the north and the wider landscape to the south and west. Appendix 2 illustrates how the proposed extension of the allocation can achieve this on land owned by Lenco Investments.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63537
Derbyniwyd: 20/01/2014
Ymatebydd: Lenco Investments
Asiant : RPS Planning & Development
Given that the housing needs study is some 6 years out of date and in excess of the length for which Housing Needs Assessments have a shelf life for, the assumption that only 17 dwellings are required in Baginton Village is considerably out of date and not robust. It is most likely that the demand has indeed increased for housing in Baginton since the survey was undertaken and is closer to the need identified in the Revised Development Strategy of between 70 and 90 dwellings.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63548
Derbyniwyd: 20/01/2014
Ymatebydd: Mr Edward Walpole-Brown
Asiant : Brown and Co
There are significant issues in the Hatton Parish Plan which are not considered in the siteb evaluation and development proposals.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63553
Derbyniwyd: 20/01/2014
Ymatebydd: Trustees of the F S Johnson 78NEL
Asiant : Tyler-Parkes Partnership
Kingswood (Lapworth) is identified as a Primary Service Village with a score in the 'Settlement Hierarchy Report', of 53, only 4 points short of the most sustainable village of Hampton Magna. This settlement score is derived from an assessment of a number of factors including: the size of the settlement in terms of usual resident population; the availability of services and facilities within the settlements; and the accessibility of services, facilities and employment opportunities including frequency and availability of public transport. Given the evidenced sustainability of Kingswood (Lapworth) with its railway station, school, shops and local employment, we object strongly to the identification of preferred sites to accommodate only 62 rather than 100 to 150 units proposed in the Revised Development Strategy document. It is unsound for Kingswood (Lapworth) to have fewer proposed new dwellings than not only all the other Primary Service Villages, but also fewer than all except one of the Secondary Service Villages.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63558
Derbyniwyd: 20/01/2014
Ymatebydd: Mrs & Mrs Swindells and Star Pubs & Bar Ltd
Asiant : Barton Willmore
There is concern regarding the Green Belt evidence used to inform the VHOSB document. The 'Critical Friend' Analysis document only provides assessment of the parcel of land the 'preferred option' site is located within, rather than all potential options for the settlement. As such it is considered limited weight should be afforded to the 'Critical Friend' Analysis pending a review of all Green Belt sites identified in the VHOSB document, as currently this does not provide an open and transparent assessment of all available alternative options. It should also be noted that the parcel of land The Site is located within in respect of the Partial Green Belt Review is considered to have an Outline Value Assessment of 'Medium-High', whereas the parcel the 'preferred option' site is situated within has a value of 'High', suggesting The Site is preferable in Green Belt terms. When considering the impacts resulting from HS2, the 'preferred option' site lies partly within the area that will experience potential noise effects, with nearby residential properties ranging from 'moderate adverse' to 'minor adverse' impact, as shown in plan 20612-SL-P-03. It is considered that this further demonstrates the acceptability of The Site given it will be located in an area of less Green Belt value and no impacts resulting from HS2, when compared with the 'preferred option' site.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63566
Derbyniwyd: 20/01/2014
Ymatebydd: David Wilson Homes
Asiant : Turley Associates
Landscape review indicates that there is no danger that development on sites 5/6 will result in unrestricted sprawl or encroachment into the countryside.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63568
Derbyniwyd: 20/01/2014
Ymatebydd: David Wilson Homes
Asiant : Turley Associates
Landscape review indicates that there is no danger that development on sites 5/6 will result in unrestricted sprawl or encroachment into the countryside.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63572
Derbyniwyd: 22/01/2014
Ymatebydd: Mr J Cleary
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63584
Derbyniwyd: 22/01/2014
Ymatebydd: Mrs Linda Durand
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63596
Derbyniwyd: 22/01/2014
Ymatebydd: Mr Maurice Durand
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63608
Derbyniwyd: 22/01/2014
Ymatebydd: Mr Stacey Ellis
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63620
Derbyniwyd: 22/01/2014
Ymatebydd: Mr Vincent Spiers
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63632
Derbyniwyd: 22/01/2014
Ymatebydd: Miss Holly Stevens
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63644
Derbyniwyd: 22/01/2014
Ymatebydd: Mr Daniel Hayward
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63656
Derbyniwyd: 22/01/2014
Ymatebydd: Ms Deborah Wilson
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63668
Derbyniwyd: 22/01/2014
Ymatebydd: Keri Hinchley
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63680
Derbyniwyd: 22/01/2014
Ymatebydd: Mrs Karen Dawson
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63692
Derbyniwyd: 22/01/2014
Ymatebydd: Mrs Angela Marion Ellis
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63704
Derbyniwyd: 22/01/2014
Ymatebydd: Mr Peter John Ellis
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.
Gwrthwynebu
Village Housing Options and Settlement Boundaries
ID sylw: 63716
Derbyniwyd: 22/01/2014
Ymatebydd: mrs jane hayward
-There has not been sufficient planning and analysis of infrastructure issues to be able to make a reasoned judgement in the viability of the potential sites. Sewage, drainage and electricity issues have been a particular concern from many residents of Hampton Magna who have experienced the problem.
-Planners rejecting resident's previous consultation comments about transport issues by quoting 'advice from transport experts at the county council suggest that the development proposal can be accommodated' is ridiculous.