BASE HEADER
Mod 11 - paras 2.41 to 2.53
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68775
Derbyniwyd: 14/04/2016
Ymatebydd: Christine Kinsella
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Object to proposals: -
- loss of green belt
- low-lying land susceptible to flooding
- sewage works has adverse impacts on residential amenity
- impact of construction traffic over many years
- lack of research on the part of the council
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68781
Derbyniwyd: 14/04/2016
Ymatebydd: MR ROBERT DONNELLY
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Objects to allocation: -
- impact on natural environment
- impact on historic environment
- flooding
- additional traffic
- adverse impact on existing facilities and services
- threat to Alvis sports club
- loss of landscape and visual amenity
- should look to other sites and promote regeneration
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68848
Derbyniwyd: 21/04/2016
Ymatebydd: Mrs. Elizabeth Rowley
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Object to allocations: -
- adverse impact on character of village
- poor / unsafe access into village
- traffic congestion and parking
-road safety adversely affected by increase in traffic
- adverse impact on existing services and facilities
- lack of capacity at train station
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68894
Derbyniwyd: 15/04/2016
Ymatebydd: mr Charles McDonald
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
Object to proposals: -
- lack of suitable infrastructure will be exacerbated by additional traffic
- Coventry Local Plan proposing additional housing in area
- significant congestion already occurs
- HS2 works will last for a number of years and will generate large numbers of HGV movements
- overall infrastructure provision for both Coventry and Warwick should be planned and co-ordinated
- any housing development should not commence until after HS2 has finished construction in 2026
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68930
Derbyniwyd: 04/04/2016
Ymatebydd: Highways England
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Nac Ydi
We have reviewed the proposed main modifications and have no specific comments on the document other than that Highways England should be included in those bodies with which Warwick District Council propose to co-operate on the delivery of the development proposals south of Coventry (see last paragraph on page 18 relating to Policy DS New 1).
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68953
Derbyniwyd: 20/04/2016
Ymatebydd: Peter Langley
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
New paragraphs 2.1 to 2.43 talk about taking land out of the Green Belt so that it can be safeguarded for possible future development. In relation to government policy, there is even less of a case for this than where development is claimed to be needed during the plan period, and I have already shown that the latter is contrary to government policy.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68995
Derbyniwyd: 21/04/2016
Ymatebydd: Environment Agency
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Paragraph 2.41
We note that sites were assessed for their suitability against the SFRA Level 1. Warwick District Council's SFRA is dated April 2013 and we recommend that it is updated to take into account changes in Policy (NPPF) and the revised climate change allowances.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69058
Derbyniwyd: 21/04/2016
Ymatebydd: Warwickshire Police and West Mercia Police
Asiant : Place Partnership Limited (PPL)
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
This representation encloses examples of appeal judgements that substantiate that contributions towards police infrastructure in relation to housing development sites are CIL compliant and justifiable.
It is suggested that the text in the modifications (Mod 11 paragraph 2.49 in particular)is added with an explicit reference to police infrastructure requirements(see suggested change to plan below).
Cefnogi
Proposed Modifications January 2016
ID sylw: 69165
Derbyniwyd: 22/04/2016
Ymatebydd: Lioncourt Strategic Land - Andy Faizey
Asiant : Savills
SUPPORT modification to the Plan and the inclusion of Kings Hill (Site Ref: H43) to provide up to 4,000 dwellings.
Lioncourt and the consortium that it represents confirms that at least 1,800 dwellings can be delivered within the Plan period.
The Illustrative Framework Plan (submitted alongside this representation) shows the proposed approach to delivering the urban extension and key infrastructure.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69245
Derbyniwyd: 22/04/2016
Ymatebydd: Taylor Wimpey
Asiant : Barton Willmore
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Hampton Magna
We disagree with the proposed allocations made in Hampton Magna, as we consider that the land under the control of Taylor Wimpey at Old Budbrooke Road is superior and offers a more sustainable and logical extension to the settlement of Hampton Magna.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69249
Derbyniwyd: 22/04/2016
Ymatebydd: CEG Steel/Pittaway
Asiant : Nexus Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Council should allocate both H42 and S1 as a single strategic allocation, with a restriction on dwelling delivery in advance of the aforementioned highway interventions being delivered. It is considered that this is fully consistent with the NPPF and, as set out later in this submission, would provide a much more logical and robust framework for the comprehensive planning of the area.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69408
Derbyniwyd: 22/04/2016
Ymatebydd: Old Milverton & Blackdown JPC
Asiant : Hunter Page Planning
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
It is the position of Old Milverton and Blackdown Joint Parish Council that the proposed strategic allocation at Old Milverton and the proposed safeguarded land will not meet the needs of Coventry and is not suitable for such purposes.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69492
Derbyniwyd: 21/04/2016
Ymatebydd: Centaur Homes
Asiant : McLoughlin Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
These modifications are unsound as they are inconsistent with national policy and not justified by the evidence base. As such, the allocation, as it is put forward within the modifications version of the Local Plan is not NPPF compliant.
Issues in particular around:
The Green Belt.
Landscape Impact.
Sustainability Appraisal.
More robust case for release of land on western side of village. Centaur site sits within natural depression and is visually contained. Not highly visible. Considered a suitable location for development on two grounds: partly brownfield and the contained nature of the site.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69688
Derbyniwyd: 22/04/2016
Ymatebydd: Gleeson Developments
Asiant : Savills (L&P) Ltd
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Paragraph 2.52 should be amended to include land at Southcrest Farm and the requirements for educational uses in accordance with the above comments. Reference to Southcrest Farm in relation to secondary school provision should be deleted.
Cefnogi
Proposed Modifications January 2016
ID sylw: 69753
Derbyniwyd: 22/04/2016
Ymatebydd: Catesby Estate Ltd & H E Johnson
Asiant : Catesby Property Group
Increased justification for residential allocation of land at Red House Farm - support modifications 10, 11 and 16 to policies DS11 and DS19, which in combination propose the removal of the land at Red House Farm from the green belt for the development of 250 dwellings to meet identified needs and support regeneration in Lillington (previous site reference H04).
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69831
Derbyniwyd: 22/04/2016
Ymatebydd: Bishop's Tachbrook Parish Council
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Correct 147 dwellings to 143
2.46 Omit in the light of our representations in Mod 10.
2.49 Revise in the light of our representations in Mod 10.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69850
Derbyniwyd: 22/04/2016
Ymatebydd: Mrs J Mackenzie
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Allocations contrary to NPPF requirement to maintain separation, prevent coalescence
Numbers based on Coventry requirements not approved in local plan, revised before 2017?
No critical examination of claims that land unavailable -areas of Coventry green belt could be developed with less impact
Provision of land to meet Coventry's overspill contrary to NPPF - require sub-regional SA to be valid
How do proposals fit with neighbouring development
No consultation undertaken with parish councils before decisions made
MoU providing additional housing for Combined Authority circumvents democratic process, NPPF
Impact of proposals at Thickthorn and Kings Hill next to over-capacity A46 not considered
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69927
Derbyniwyd: 20/04/2016
Ymatebydd: Mr & Mrs Jarrett
Asiant : McLoughlin Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
OMISSION site:
Land at the Valley should be allocated for housing development for up to 40 units
Site is deliverable and available for development
Provides an opportunity to reduce uncertainty around windfalls
Site is accessible
Site is of low ecological value / flood risk
Infill site surrounded on three sides by development
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69970
Derbyniwyd: 22/04/2016
Ymatebydd: Sharba Homes
Asiant : Barton Willmore
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
RADFORD SEMELE
OMISSION site: -
- Site south of Offchurch Lane could be sufficiently allocated as part of a more comprehensive allocation in conjunction with Site H38.
- subject to current (May 2016) planning application for up to 150 dwellings
- reason for non-allocation was concern over capacity of village school by County Council - no objection raised by County council to planning application subject to s106
- incorrect to say that there are no suitable sites outside of the Green Belt
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69984
Derbyniwyd: 22/04/2016
Ymatebydd: The Kler Group
Asiant : Barton Willmore
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
The site at the Peeping Tom Public House, Burton Green is available, and suitable to provide additional housing in Burton Green. The village is affected by HS2. One of the consequences of this is that the allocated site at Burrow Hill Nursery is unlikely to come forward before HS2 is complete. The plan therefore provides no flexibility for the delivery of housing in the village. Further, the Plan does not take account the loss and abandonment of homes as a result of HS2 is we have estimated at around 55 dwellings or 20.91% of the housing stock in the village. Further land therefore needs to be allocated. The site at Cromwell Lane would be a suitable Green Belt release and is isolated from HS2. Evidence has previously been submitted - centrally located, close to public transport and employment opportunities. Vehicular access can be achieved and work has been undertaken to demonstrate landscape and visual impacts are acceptable. Further the site can delivered in 5 years. A similar site to the north is proposed for allocation in Coventry's Local Plan.
Cefnogi
Proposed Modifications January 2016
ID sylw: 70019
Derbyniwyd: 22/04/2016
Ymatebydd: Place Partnership Limited (PPL)
Asiant : Bilfinger GVA
This representation supports the proposed modifications to Paragraphs 2.41 to 2.51, as shown in Appendix B of the schedule of modifications, in particular in respect of paragraph 2.42, which provides an Explanation for Policy DS11, and paragraph 2.56 on Village Allocations
Support the proposed deletion of wording in the Publication Draft Local Plan, which prescribed that sites of over 50 dwellings should be delivered in phases. This would delay the delivery of housing
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70042
Derbyniwyd: 22/04/2016
Ymatebydd: Taylor Wimpey
Asiant : Barton Willmore
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Ydi
Dyletswydd i gydweithredu? Heb nodi
fers a sustainable and logical extension to the settlement of Hatton Park.
However, there is a strip of land to the east of the proposed allocation which is within the control of Taylor Wimpey adjacent to Ugly Bridge Road. In our view, extending the allocated area to cover the entirety of the land in Taylor Wimpey's control would form a more logical extension to Hatton Park. Moreover, the omission of this strip of land will render it redundant from any viable continued use as an agricultural landholding. Should the Council be seeking to enhance landscaping on the eastern edge of the proposed residential development, then we consider that this would be better achieved by including the land within the allocated area.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70045
Derbyniwyd: 31/03/2016
Ymatebydd: The Campbell Partnership
Asiant : Hancock Town Planning
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
OMISSION site
release of green belt sites at Milverton is not justified when land at Goggbridge Lane is available for residential development.
Ideal of residential development - lies directly opposite existing housing, on a residential estate road unsuitable for commercial traffic. Site unsuitable for Class B2/B89 employment land but well-related to residential community.
Refer to recent approval for residential development at Opus 40 employment site (ref: W/15/0646 for 85 dwellings) where it was accepted that noise mitigation could be achieved despite proximity of A46 - similar could be achieved here.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70048
Derbyniwyd: 06/04/2016
Ymatebydd: Brian & Matt Lewis & Smith
Asiant : Stansgate Planning
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
OMISSION site: -
- Site adjacent to The Asps not included
- inclusion would provide road frontage as logical, definable boundary.
- inclusion would enable demolition of modern farm buildings on site and redevelopment with buildings more appropriate to setting of listed buildings
- site can be served by improved access from Banbury Road
- could be brought forward early
- informal advice from WDC was that a small scale scheme might be acceptable
- traditional farm buildings appropriate for conversion to 3 or 4 dwellings. Site area of c4ha, estimated gross capacity of c20-25 dwellings.
Cefnogi
Proposed Modifications January 2016
ID sylw: 70064
Derbyniwyd: 21/04/2016
Ymatebydd: Warwickshire Police and West Mercia Police
Asiant : Place Partnership Limited (PPL)
Warwickshire Police (WP) and West Mercia Police (WMP) are pleased to see a reference under paragraph 2.55 to the need for emergency services infrastructure at Kings Hill.
In common with similar major developments granted planning permission in Warwick District by the Council
and the Secretary of State recently (see spreadsheet enclosed in attachments Appendix 1), the police infrastructure required to support sustainable development at Kings Hill will need to include:
* Equipping of officers and staff
* Police vehicles
* Premises
Based on the information available to us, WP and WMP envisage that the policing of the development would
be delivered by the Kenilworth Safer Neighbourhood Team (SNT), operating from an on-site police office
within the Kings Hill scheme.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70080
Derbyniwyd: 22/04/2016
Ymatebydd: Warwickshire County Council [Archaeological Information and Advice]
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
There are inconsistencies with regard to schools provision throughout the plan . Kings Hill should reference a secondary school and primary schools as required - see suggested alts as required below.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70099
Derbyniwyd: 21/04/2016
Ymatebydd: The Burman Family
Asiant : Nigel Gough Associates Ltd
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Agree in principle with allocation of H28 for c120 dwellings.
Object to retention of strip of green belt land along eastern and northern edges of site.
No logical or defensible boundary as required by NPPF.
Should use field boundary.
No benefit in farming terms for keeping strips of land.
No justification in maintaining a landscape strip / buffer
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70139
Derbyniwyd: 22/04/2016
Ymatebydd: Taylor Wimpey
Asiant : Barton Willmore
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
OLD MILVERTON
We agree in principle with the proposed allocation of Site H44 for residential development. However, given it offers a sustainable and logical extension to the north of Leamington Spa we consider that a larger allocation could be delivered on the proposed safeguarded area of the Site within the Plan period - with the whole Site being under the control of Taylor Wimpey.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70162
Derbyniwyd: 22/04/2016
Ymatebydd: Commercial Estates Group
Asiant : Nexus Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Support allocation of Westwood Heath.
No compelling policy justification for identifying H42 in preference to S1 and indeed there is an acknowledgement from the Council that residential development can be accommodated on S1 without any adverse impact on amenity.
Important to secure delivery of community infrastructure in early phases of development to ensure sustainable development patterns can be established and new residents get access to facilities quickly.
First phase of residential development should be planned and delivered in a way that would facilitate delivery of "Community Hub".
Seeking combined H42 / S1 allocation that could be comprehensively planned and phased.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 70227
Derbyniwyd: 22/04/2016
Ymatebydd: Mr. Michael James Edwards
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
object to proposal: -
- no exceptional circumstances justify green belt allocation
- other more suitable green belt sites available
- should explore compulsory purchase orders
- more suitable areas available closer to Coventry
- should look at Bubbenhall as more suitable location
- site at Hampton Road (43 acres) was available for sale at time of SHLAA - was not considered