BASE HEADER

Strategic Growth Location SG12 Question

Yn dangos sylwadau a ffurflenni 61 i 90 o 132

Yes

Preferred Options 2025

ID sylw: 96226

Derbyniwyd: 04/03/2025

Ymatebydd: Mr James Pateman

Crynodeb o'r Gynrychiolaeth:

Build housing on non-greenbelt land.

Other

Preferred Options 2025

ID sylw: 96281

Derbyniwyd: 05/03/2025

Ymatebydd: Southam Town Council

Crynodeb o'r Gynrychiolaeth:

The overall intention is to maintain the South of Southam as the main industrial and larger employment area with the central environment focused on services and retail with a tendency to smaller businesses and community. Whilst we agree with the inclusion of Southam, we do not agree with all the sites in the group. Please see comments on HELAA results for comments on individual sites within SG12.

No

Preferred Options 2025

ID sylw: 96708

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Adam Taylor

Crynodeb o'r Gynrychiolaeth:

Southam has grown so much that it cannot cope with current infrastructure required to make it a sustainable town, adding to this simply adds to the problem.

No

Preferred Options 2025

ID sylw: 96733

Derbyniwyd: 05/03/2025

Ymatebydd: Long Itchington Parish Council

Crynodeb o'r Gynrychiolaeth:

This would change the nature of Southam as a very small market town to its detriment

Other

Preferred Options 2025

ID sylw: 96752

Derbyniwyd: 05/03/2025

Ymatebydd: Alcester Town Council

Crynodeb o'r Gynrychiolaeth:

Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’) has no comment.

Yes

Preferred Options 2025

ID sylw: 96968

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Margaret Jeffery

Crynodeb o'r Gynrychiolaeth:

N/A

Other

Preferred Options 2025

ID sylw: 97204

Derbyniwyd: 05/03/2025

Ymatebydd: Long Itchington Parish Council

Crynodeb o'r Gynrychiolaeth:

Little consideration given to the role Southam plays within the cluster of nearby village settlements. If Southam expands significantly, there will be enormous pressure on the only two GP surgeries which serve Southam and many other villages; pressure on school places for Southam College is a factor. Public transport is poor. Real danger of over-whelming the facilities of local villages by expansion of Southam. Long Itchington is close to Southam; residents use our facilities - walking, play parks, community centre, clubs, pubs etc These are already often at capacity. This needs to be given very careful consideration.

No

Preferred Options 2025

ID sylw: 97549

Derbyniwyd: 05/03/2025

Ymatebydd: Nathaniel Coalson

Crynodeb o'r Gynrychiolaeth:

The infrastructure in the area is already strained

No

Preferred Options 2025

ID sylw: 97597

Derbyniwyd: 05/03/2025

Ymatebydd: Ms Anna Avino

Crynodeb o'r Gynrychiolaeth:

Leamington has already exploded in the past five years. The roads are jammed, the services are overstretched and the vast housing developements and population explosion is changimg the character of the area and making it unpleasant. Infrastructure cannot cope with all the new 29,000 homes being concentrated in a few massive developments in the area particularly south Leamington and Whitnash which is gridlocked. These houses need to be fully dispersed across the whole of warwickshire with every town and village taking a handful of them. This woudl be a fairer, more sustainable appproach as the infratrusture wil alsways play catch-up.

No

Preferred Options 2025

ID sylw: 97598

Derbyniwyd: 05/03/2025

Ymatebydd: Ms Anna Avino

Crynodeb o'r Gynrychiolaeth:

Leamington has already exploded in the past five years. The roads are jammed, the services are overstretched and the vast housing developements and population explosion is changimg the character of the area and making it unpleasant. Infrastructure cannot cope with all the new 29,000 homes being concentrated in a few massive developments in the area particularly south Leamington and Whitnash which is gridlocked. These houses need to be fully dispersed across the whole of warwickshire with every town and village taking a handful of them. This woudl be a fairer, more sustainable appproach as the infratrusture wil alsways play catch-up.

Yes

Preferred Options 2025

ID sylw: 97647

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Melanie Elkington

Crynodeb o'r Gynrychiolaeth:

I think a smallish expansion of Southam would not overload the infrastructure of the town plus it isnt on Green Belt

No

Preferred Options 2025

ID sylw: 97712

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Simon West

Crynodeb o'r Gynrychiolaeth:

Southam does not currently have the infrastructure such as school places, doctor and dental surgery places to support further growth. The land adjacent to the Banbury road is prone to flooding as witnessed by HS2 archaeological digs done over the last few years becoming ponds during winter and the HS2 line will have an impact on the ground water levels.
Green travel options from Southam (and surrounding area) are severely limited.

Yes

Preferred Options 2025

ID sylw: 97823

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Gary Jeffery

Crynodeb o'r Gynrychiolaeth:

N/A

Yes

Preferred Options 2025

ID sylw: 97888

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Tracey Hasnaoui

Crynodeb o'r Gynrychiolaeth:

Non greenbelt land. High sustainability site which would lead to modest expansion of Southam which already has infrastructure in place to support the development

Yes

Preferred Options 2025

ID sylw: 98217

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Anne Teed

Crynodeb o'r Gynrychiolaeth:

Does not include green belt land.

Yes

Preferred Options 2025

ID sylw: 98303

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Daine Davis

Crynodeb o'r Gynrychiolaeth:

Southam is a largely self-contained small town and, as such, can accomode reasonable expansion, provided local amenities are expanded to provide for more people.

Other

Preferred Options 2025

ID sylw: 98408

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Jacqueline West

Crynodeb o'r Gynrychiolaeth:

Only after it has facilities and infrastructure increased to match the growth that has already occured in the last 10-15 years in the town and surrounding area (eg Bishops Itchington, Harbury, Fenny Compton, Long Itchington etc)

Yes

Preferred Options 2025

ID sylw: 98422

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Simon Wright

Crynodeb o'r Gynrychiolaeth:

Support development on non-green belt land.

Yes

Preferred Options 2025

ID sylw: 98746

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Doug Wallace

Crynodeb o'r Gynrychiolaeth:

N/A

Other

Preferred Options 2025

ID sylw: 98916

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Jacqueline West

Crynodeb o'r Gynrychiolaeth:

Further growth of SG12 only if facilities to match current growth in this area are provided first and there is a financed plan to have these in place as new growth happens. There has been major expansion of Southam, Harbury, Bishops Itchington, Long Itchington and other villages nearby without facilities to support these coming on line.

Also road surface is appalling around Southam, the quality & on-going maintenance of roads must match total usage by developers, residents, workers, suppliers etc.

Yes

Preferred Options 2025

ID sylw: 98998

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Lynda McCarthy

Crynodeb o'r Gynrychiolaeth:

outside designated 'green belt' land

No

Preferred Options 2025

ID sylw: 99037

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs JILL CHAMBERS

Crynodeb o'r Gynrychiolaeth:

Southam has already had a large amount of new housing in recent years. Inadequate infrastructure to support more, schools and transport in particular; roads are already congested and busy with HS2 who will be working here for some time to come, school buses park in laybys around the town preventing use by other road users,

Other

Preferred Options 2025

ID sylw: 99079

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Barbara Atkins

Crynodeb o'r Gynrychiolaeth:

I would urge you to assess the effect this may have on surrounding villages which use the GP surgeries in Southam and many other facilities. Increases in housing in Southam cannot cause deficits of infrastructure for residents in surrounding villages, like Long Itchington etc.

Yes

Preferred Options 2025

ID sylw: 99139

Derbyniwyd: 06/03/2025

Ymatebydd: Mr John Jones

Crynodeb o'r Gynrychiolaeth:

Development of an area not containing green belt land.
Sustainable area.

Yes

Preferred Options 2025

ID sylw: 99320

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Martin Phelps

Crynodeb o'r Gynrychiolaeth:

proportionate expansion of Southam; but no nearby rail links

Yes

Preferred Options 2025

ID sylw: 99433

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Peter Tibbles

Crynodeb o'r Gynrychiolaeth:

Appears to be have mediocre service by existing Road Network, Transportation hubs, Healthcare facilities and Education establishments, but with some improvements in capacity and provision, might be suitable

Other

Preferred Options 2025

ID sylw: 99453

Derbyniwyd: 06/03/2025

Ymatebydd: Ms Gillian Padgham

Crynodeb o'r Gynrychiolaeth:

The overall intention is to maintain the South of Southam as the main industrial and larger employment area with the central environment focused on services and retail with a tendency to smaller businesses and community. Southam has absorbed a larger number of houses already and the town has grown without the appropriate increase in services or infrastructure, so although I broadly agree with some of the sites in Southam being put forward, I do not agree with all of the sites in group SG12. I will comment on them individually in the HELAA results section.

No

Preferred Options 2025

ID sylw: 99527

Derbyniwyd: 06/03/2025

Ymatebydd: Stratford upon Avon District Council

Crynodeb o'r Gynrychiolaeth:

Has already experienced disproportionate growth without corresponding improvements in infrastructure. No rail and no arterial road network. A cycle network to connect it with other local villages within a 4mile radius would be beneficial to Southam's viability.

No

Preferred Options 2025

ID sylw: 99609

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Jo Thomas

Crynodeb o'r Gynrychiolaeth:

Infrastructure not commensurate with suggested building development

Yes

Preferred Options 2025

ID sylw: 99686

Derbyniwyd: 06/03/2025

Ymatebydd: Miss Sabrina Hasnaoui

Crynodeb o'r Gynrychiolaeth:

Support expansion of Southam. Meets sustainability criteria due to amenities already being in place, schools, gps and other local facilities. Non green belt land development.