BASE HEADER

Strategic Growth Location SG15 Question

Yn dangos sylwadau a ffurflenni 31 i 60 o 335

No

Preferred Options 2025

ID sylw: 88453

Derbyniwyd: 15/02/2025

Ymatebydd: Holly Hiorns

Crynodeb o'r Gynrychiolaeth:

Massive impact on natural landscape & building on agricultural land.

Other

Preferred Options 2025

ID sylw: 88633

Derbyniwyd: 17/02/2025

Ymatebydd: Mr Jerry Corless

Crynodeb o'r Gynrychiolaeth:

Already going to provide land for solar array.

No

Preferred Options 2025

ID sylw: 88724

Derbyniwyd: 17/02/2025

Ymatebydd: Mr Darren Quinney

Crynodeb o'r Gynrychiolaeth:

How on earth can Wellesbourne cope with further traffic? The village is gridlocked at weekends due to the market and visiting customers, it seems to be a competition to get the village to same size as Stratford, but once again with zero thought into infrastructure on the council's part.

No

Preferred Options 2025

ID sylw: 88731

Derbyniwyd: 17/02/2025

Ymatebydd: Mr Darren Quinney

Crynodeb o'r Gynrychiolaeth:

Please stop expanding Wellesbourne! Or at least take some time to offer infrastructure plans the Council will actually honour.

No

Preferred Options 2025

ID sylw: 88737

Derbyniwyd: 17/02/2025

Ymatebydd: Mr Darren Quinney

Crynodeb o'r Gynrychiolaeth:

Wellesboune is already creacking under pressure and you wish to make it worse?

No

Preferred Options 2025

ID sylw: 88919

Derbyniwyd: 18/02/2025

Ymatebydd: Miss Joanne Bailey

Crynodeb o'r Gynrychiolaeth:

Will result in:
Heightened Flooding - already flooding around the Newbold Road & the roads leading off which sees the Newbold Brook to the edge of the village full and over flowing into the fields alongside acting as a flood plain.
Urbanising villages should be avoided at all costs, no concrete landscapes.
Village infrastructure & amenities are insufficient.
Public transport links are poor with rail connectivity non existent.
Road network heavy congestion daily - traffic backing up beyond the village boundary
Environment - this is good arable land & would create significant & irreversible damage to the landscape.

Other

Preferred Options 2025

ID sylw: 88974

Derbyniwyd: 19/02/2025

Ymatebydd: Stratford upon Avon District Council

Crynodeb o'r Gynrychiolaeth:

Need for strategic gap between University site and airfield and edge of village
No development east of A429
No development of existing allotments site north of Kineton Road

Yes

Preferred Options 2025

ID sylw: 89040

Derbyniwyd: 19/02/2025

Ymatebydd: Mrs Sara Bird

Crynodeb o'r Gynrychiolaeth:

Good access to facilities and public transport in Wellsbourne

No

Preferred Options 2025

ID sylw: 89042

Derbyniwyd: 19/02/2025

Ymatebydd: Mrs Alison Lusty

Crynodeb o'r Gynrychiolaeth:

Summary of detrimental effect on the local area (see detailed comments):
• Loss of character.
• Over-development in an area that is already experiencing pressure on the highways and other infrastructure
• Effect of development in area that is close to the River Avon (water table/ flooding).
• Lack of public transport options in the area
• Highways (in particular A429) are already unable to cope with current levels of traffic,.
• Local infrastructure is already stretched.
• Detrimental effect on the community of Wellesbourne.

No

Preferred Options 2025

ID sylw: 89293

Derbyniwyd: 19/02/2025

Ymatebydd: L B

Crynodeb o'r Gynrychiolaeth:

Wellesbourne has already been developed to the size of a small town but there is not the infrastructure to support the existing size. Areas of housing are prone to flooding. Traffic congestion is already a problem at times.

Yes

Preferred Options 2025

ID sylw: 89525

Derbyniwyd: 20/02/2025

Ymatebydd: Miss Emily Carleton

Crynodeb o'r Gynrychiolaeth:

Go for it as it's not green belt land

No

Preferred Options 2025

ID sylw: 89690

Derbyniwyd: 21/02/2025

Ymatebydd: Mr john cooknell

Crynodeb o'r Gynrychiolaeth:

This site for growth is situated on the wide flat floor of the Avon Valley and will be impacted by occasional flooding from the River Avon and its Tributaries.
The Level 1 SFRA technical evidence is only indicative a Level 2 Strategic Flood Risk Assessment should be carried out before this site is confirmed as a Strategic Growth location.

No

Preferred Options 2025

ID sylw: 89701

Derbyniwyd: 21/02/2025

Ymatebydd: Mr Andrew Marshall

Crynodeb o'r Gynrychiolaeth:

SG15 must be considered in conjunction with other aspects of the Plan such as Ground mounted Solar PV sites.
Other existing developments and applications must also be taken into account:- Elms Farm Solar site, Warwick University site, Wellesbourne Airfield, Wasperton Gravel site and the X1 proposed development.
Within the boundary of the M40, South Wellesbourne, the A429 and The B4087 there will be comprehensive urbanisation of predominately active, productive agricultural land.
The B4087 is to narrow to accomodate an increase in HGV trafic as to is its entry route to Wellesbourne and on to the B4100.

No

Preferred Options 2025

ID sylw: 90085

Derbyniwyd: 22/02/2025

Ymatebydd: Catherine Hewson

Crynodeb o'r Gynrychiolaeth:

River Avon and tributaries LWS and Hampton Wood LWS, Grove Fields Lane LWS, Wasperton Manor Farm LWS, Hampton Lucy Escarpment LWS, Charlescote gravel pits and Thelsford brook LWS

Yes

Preferred Options 2025

ID sylw: 90105

Derbyniwyd: 22/02/2025

Ymatebydd: Mr Richard Hewitt

Crynodeb o'r Gynrychiolaeth:

Support

No

Preferred Options 2025

ID sylw: 90327

Derbyniwyd: 23/02/2025

Ymatebydd: Mr Hedley Cooper

Crynodeb o'r Gynrychiolaeth:

The huge expansion of Wellesbourne to the north will dramatically change the nature of the landscape and will urbanise what is a rural area, to the detriment of the local area which will only give a small area of green space between Wellesbourne and Barford.

Yes

Preferred Options 2025

ID sylw: 90392

Derbyniwyd: 23/02/2025

Ymatebydd: Jayne Jones

Crynodeb o'r Gynrychiolaeth:

Further consideraton of infrastructure needed

Yes

Preferred Options 2025

ID sylw: 90641

Derbyniwyd: 24/02/2025

Ymatebydd: Ms Alice Smith

Crynodeb o'r Gynrychiolaeth:

This site is perfect given the existing road infrastructure and less disruption to the countryside

No

Preferred Options 2025

ID sylw: 90703

Derbyniwyd: 24/02/2025

Ymatebydd: Averil Stewart

Crynodeb o'r Gynrychiolaeth:

getting to Wellesbourne is already painful - roads here do not support good growth

No

Preferred Options 2025

ID sylw: 90782

Derbyniwyd: 24/02/2025

Ymatebydd: Malcolm Fisk

Crynodeb o'r Gynrychiolaeth:

This is not an appropriate use of open fields and simply represents a sprawl of the Wellesbourne village merging it with the historic village of Charlecote.

No

Preferred Options 2025

ID sylw: 90783

Derbyniwyd: 24/02/2025

Ymatebydd: Maxine Mayer

Crynodeb o'r Gynrychiolaeth:

This site is currently subject tor outline planning. it is quite clear that the amount of warehousing proposed will not give aircraft sufficient clearance and make the airfield unsafe. There are significant concerns raised by statutory consultees. It is now required to be assessed for sand and gravel extraction as it is in the Warwickshire minerals safeguarded area. I attach some key statutory responses to the outline plan.

Yes

Preferred Options 2025

ID sylw: 91018

Derbyniwyd: 25/02/2025

Ymatebydd: Julian Brown

Crynodeb o'r Gynrychiolaeth:

Agree given the current expansion of Wellesbourne to attract employment opportunities and additional housing important. Reasonable access to road infrastructure but some reservation as nothing is explained in this document per se how by increasing all site areas how road infrastructure will be improved. This is a general comment for all as many are single trunk and there would be the need for more dual carriageways which results in long term planning and significant cost.

No

Preferred Options 2025

ID sylw: 91318

Derbyniwyd: 26/02/2025

Ymatebydd: Dr Caitlin Imray

Crynodeb o'r Gynrychiolaeth:

I object to the houses being built in Barford. We already struggle with traffic, congestion and difficulties getting in and out of the village at busy times. There is not the infrastructure to support this! We are running out of green spaces which will affect the beautiful environment and there also a lot of flooding.

No

Preferred Options 2025

ID sylw: 91424

Derbyniwyd: 26/02/2025

Ymatebydd: Ms Lucia Restall Orr

Crynodeb o'r Gynrychiolaeth:

The proposal will impact the following Local Wildlife Sites: River Avon and tributaries LWS and Hampton Wood LWS, Grove Fields Lane LWS, Wasperton Manor Farm LWS, Hampton Lucy Escarpment LWS, Charlescote gravel pits and Thelsford brook LWS

No

Preferred Options 2025

ID sylw: 91496

Derbyniwyd: 26/02/2025

Ymatebydd: Beth Palmer

Crynodeb o'r Gynrychiolaeth:

This area is already over developed

No

Preferred Options 2025

ID sylw: 91499

Derbyniwyd: 26/02/2025

Ymatebydd: Mr Barry Saunders

Crynodeb o'r Gynrychiolaeth:

1. There is significant harm to the character of the landscape.
2. There is a significant increase in flood risk.
3. There is a lack of rail connectivity.
4. There is a loss of the best and most versatile farmland.
5. There is overdevelopment of Wellesbourne, which threatens its village status.
6. There is a lack of educational and health facilities.

No

Preferred Options 2025

ID sylw: 91500

Derbyniwyd: 26/02/2025

Ymatebydd: Mr Barry Saunders

Crynodeb o'r Gynrychiolaeth:

1. There is significant harm to the character of the landscape.
2. There is a significant increase in flood risk.
3. There is a lack of rail connectivity.
4. There is a loss of the best and most versatile farmland.
5. There is overdevelopment of Wellesbourne, which threatens its village status.
6. There is a lack of educational and health facilities.

No

Preferred Options 2025

ID sylw: 91503

Derbyniwyd: 26/02/2025

Ymatebydd: Wellesbourne and Walton Parish Council

Crynodeb o'r Gynrychiolaeth:

This would cause: a loss of valuable agricultural land. The proposal fails to look at the capacity of the A429 to sustain travel along it. The public transport is limited and there is no rail link. Areas identified are prone to flooding and this would be exacerbated. The infrastructure in Wellesbourne could not sustain such development. The proposal could encourage ribbon development along the A429 which is not desirable. Wellesbourne had had a disproportionate amount of development over the last 10 years with no infrastructure provided except by the Parish Council.

Yes

Preferred Options 2025

ID sylw: 91854

Derbyniwyd: 27/02/2025

Ymatebydd: Mr Alan Endersbee

Crynodeb o'r Gynrychiolaeth:

LotS of new housing and no new infrastructure to accommodate these houses

No

Preferred Options 2025

ID sylw: 91884

Derbyniwyd: 27/02/2025

Ymatebydd: Mrs J Harrison

Crynodeb o'r Gynrychiolaeth:

Fully encircling villages like Charlecote will mean we have sprawling suburbs which lose any identity. This with planned quarry and HRI developments are going to make existing issues worse e.g. , access to nhs doctors and dentists, traffic generally - existing infrastructure cannot cope today but these plans make it worse