Showing comments and forms 1 to 30 of 276

Yes

Preferred Options 2025

Representation ID: 86152

Received: 12/01/2025

Respondent: Mr Andy Smith

Representation Summary:

Infrastructure and services are lagging behind new build occupations. There will undoubtedly be considerably more development than the 3,000+ houses for which consent has already been granted. I see that a rail connection from the MOD Kineton spur has been mooted. A parkway station within easy reach for Upper Lighthorne would be a boon to residents and reduce reliance on JLR and AML for employment, with easy access to covenytry and Birmingham to the north, and Banbury, Oxford and London to the south.

Yes

Preferred Options 2025

Representation ID: 86198

Received: 15/01/2025

Respondent: Professor Paul Bywaters

Representation Summary:

.

Other

Preferred Options 2025

Representation ID: 86267

Received: 18/01/2025

Respondent: Ms Ruth Buckley

Representation Summary:

Not an area where we have adequate information to comment.

Yes

Preferred Options 2025

Representation ID: 86341

Received: 21/01/2025

Respondent: Mr Noel Davis

Representation Summary:

no comment

Yes

Preferred Options 2025

Representation ID: 86499

Received: 27/01/2025

Respondent: Mrs C Dempster

Representation Summary:

spread out the development

No

Preferred Options 2025

Representation ID: 86560

Received: 28/01/2025

Respondent: Mr Peter Bridgewater

Representation Summary:

This is a very rural area that is not blighted by the motorway or HS2 and should not therefore be developed further.

Yes

Preferred Options 2025

Representation ID: 86597

Received: 28/01/2025

Respondent: Mr Darrell Muffitt

Representation Summary:

I am unclear whether or not this proposal was envisaged when the Lighthorne initial development was conceived, however, development to date has fundamentally changed the area and put a huge strain on the infrastructure. I suggest detailed local consultation before any development goes ahead with a particular focus on infrastructure implications

Yes

Preferred Options 2025

Representation ID: 87036

Received: 03/02/2025

Respondent: Mrs Judith Corless

Representation Summary:

This area has had major house building recently. More could be added with a careful look at the facilities available to people and families. Also some businesses other than the car industry. So much building has gone on that this area is practically a new town. New facilities, schools, parks, sport facilities, shops would help to give it an identity.

No

Preferred Options 2025

Representation ID: 87277

Received: 07/02/2025

Respondent: Dr Helen Buttrick

Representation Summary:

This will have a detrimental impact on the residential amenity and the visual impact on the area - this is overdeveloping an area with no amenities - there is one shop, and a primary school, but no doctor's surgery, no pub, no church, which is damaging both to the population of the new development, but also those already living in the area.

No

Preferred Options 2025

Representation ID: 87347

Received: 08/02/2025

Respondent: Cllr Andrew Day

Representation Summary:

Unsustainable overdevelopment of an area that has already experienced significant housebuilding

Yes

Preferred Options 2025

Representation ID: 87500

Received: 09/02/2025

Respondent: mrs susan morris

Representation Summary:

Suitable land to add to existing houses

No

Preferred Options 2025

Representation ID: 87528

Received: 09/02/2025

Respondent: Michaelina Jakala

Representation Summary:

I do not support - too much development with too little infrastructure. This is a rural area and this will also disturb the natural habitat and green areas.

Yes

Preferred Options 2025

Representation ID: 87655

Received: 09/02/2025

Respondent: Mr Michael Enness

Representation Summary:

It would be good for more people to live within walking distance of their employer - there is a large employer here (JLR), more homes should be close by.

Yes

Preferred Options 2025

Representation ID: 87907

Received: 12/02/2025

Respondent: Mr Adam Ellerington

Representation Summary:

This area can be supported by local infrastructure and amenities.

Yes

Preferred Options 2025

Representation ID: 87994

Received: 13/02/2025

Respondent: Mrs Sharon Quantrill

Representation Summary:

Not greenbelt

No

Preferred Options 2025

Representation ID: 88139

Received: 13/02/2025

Respondent: Mrs Anne Parry

Representation Summary:

Significant harm to the character of the landscape, lack of rail connectivity, lad of educational and health infrastructure, further increasing traffic movements through Lighthorne to JLR and Aston Martin. An enlargement of this current new settlement would have a catastrophic impact on local communities.

Yes

Preferred Options 2025

Representation ID: 88173

Received: 14/02/2025

Respondent: Mrs Rozanne Harris

Representation Summary:

SG13 is either already in or directly adjacent to a highly populated area. The road infrastructure is already in place

Yes

Preferred Options 2025

Representation ID: 88246

Received: 14/02/2025

Respondent: Mrs Ida Marjorie Brown

Representation Summary:

Yes

No

Preferred Options 2025

Representation ID: 88352

Received: 15/02/2025

Respondent: Mr Colin Sanders

Representation Summary:

Massive encouragement onto Greenbelt.
Overdevelopment of Gaydon site.
Destruction of view from Burton Dassett Hills Country Park.
Impact on rural life and farming.
Security issues with Defence Munitions (DM) Kineton.
Destruction of wildlife by removal of habitat.
Lack of access to Doctors and Hospitals.
Lack of access to schools.
Lack of access to retail and supermarkets.
Lack of access to public transport and rail links.
Increased traffic on rural roads posing danger to pedestrians and cyclists.
Infrastructure disruption to water sewage electric.

No

Preferred Options 2025

Representation ID: 88501

Received: 16/02/2025

Respondent: Mrs Anita Sanders

Representation Summary:

Massive encroachment onto Green Belt.
Overdevelopment, too close to Gaydon development.
Destruction of view from Burton Dassett Hills Country park Overdevelopment park.
Impact on rural life and farming.
Security issues with Defence Munitions (DM) Kington both local and foreign.
Destruction of wild life by removal of habitat.
Lack of access to to retail outlets and supermarkets.
Lack of access toschools.
Lack of access to to doctors and hospitals.
Lack of access to to rail and public transport links links.
Increased traffic on rural on rural roads posing danger danger to pedestrians and cyclists.
Infrastructure disruption, water sewage and electricity.

Yes

Preferred Options 2025

Representation ID: 88629

Received: 17/02/2025

Respondent: Mr Jerry Corless

Representation Summary:

Close to major employers and has excellent links to the transport infrastructure.

No

Preferred Options 2025

Representation ID: 88722

Received: 17/02/2025

Respondent: Mr Darren Quinney

Representation Summary:

The ongoing developments in an around Knightcote/Lighthorne/Gaydon and Kineton are having a detrimental effect with heavy traffic and delays due to the vast amount of builds over the past 5 years. In typical SDC behaviour its all about the money from land and build house after house. I have seen zero investment on infrastructure to support and no signs the council will do so moving forwards. It scares me how your constituency wastes local tax payers' money.

No

Preferred Options 2025

Representation ID: 88727

Received: 17/02/2025

Respondent: Mr Darren Quinney

Representation Summary:

The ongoing developments in an around Knightcote/Lighthorne/Gaydon and Kineton are having a detrimental effect with heavy traffic and delays due to the vast amount of builds over the past 5 years. In typical SDC behaviour its all about the money from land and build house after house. I have seen zero investment on infrastructure to support and no signs the council will do so moving forwards. It scares me how your constituency wastes local tax payers' money.

No

Preferred Options 2025

Representation ID: 88730

Received: 17/02/2025

Respondent: Mr Darren Quinney

Representation Summary:

The ongoing developments in an around Knightcote/Lighthorne/Gaydon and Kineton are having a detrimental effect with heavy traffic and delays due to the vast amount of builds over the past 5 years. In typical WDC council behaviour its all about the money from land and build house after house. I have seen zero investment on infrastructure to support and no signs the council will do so moving forwards. It scares me how your constituency wastes local tax payers' money.

No

Preferred Options 2025

Representation ID: 88734

Received: 17/02/2025

Respondent: Mr Darren Quinney

Representation Summary:

The ongoing developments in an around knightcote/lighthorne/gaydon and Kineton are having a detrimental effect with heavy traffic and delays due to the vast amount of builds over the past 5 years. In typical WDC council behaviour its all about the money from land and build house after house. I have seen zero investment on infrastructure to support and no signs the council will do so moving forwards. It scares me how your constiuency waster local tax payers money

No

Preferred Options 2025

Representation ID: 88924

Received: 18/02/2025

Respondent: Miss Joanne Bailey

Representation Summary:

Area already overdeveloped & landscape damaged in an area with no rail connectivity & public transport weak.

No

Preferred Options 2025

Representation ID: 88958

Received: 19/02/2025

Respondent: Cllr Nigel Rock

Representation Summary:

We do not agree with this cluster being included in the plan. The sites within the cluster perform very badly on the objective scoring system and should be eliminated.

Yes

Preferred Options 2025

Representation ID: 89122

Received: 19/02/2025

Respondent: Tanworth Residents Association

Representation Summary:

This is an already identified development area with local employment opportunities at JLR, etc and unsurpassed connections to the M40 and mainline rail through the existing spur to Kineton.
A financial case needs to be made to government and/or Great British Railways to build the few kilometres needed to reach Jaguar, improve the junction and build a new station. See Chiltern Railway's successful Project Evergreen to Oxford.

Yes

Preferred Options 2025

Representation ID: 89190

Received: 19/02/2025

Respondent: Mrs Suzanna Hughes

Representation Summary:

The proposed development offers strong transport links, including good road connections, potential for a new Chiltern Line railway station, and HS2 access for faster commuting. It could reduce congestion in Stratford while meeting housing needs with minimal environmental impact. New settlements would prevent urban sprawl, preserving Green Belt land and protecting existing infrastructure. Strategic planning, rather than land availability, should guide development.

No

Preferred Options 2025

Representation ID: 89432

Received: 20/02/2025

Respondent: Liberal Democrat Group (Stratford District councillors)

Representation Summary:

Various flooding, listed building and ancient monument factors - sites perform very badly on objective scoring system and should be eliminated - not in conformance with Strategic Objective - sites promote car use and no public transport - biodiversity is not increased by building over open countryside but actively damages environmental assets