Preferred Options 2025

Search representations

Results for Severn Trent Water search

New search New search

Yes

Preferred Options 2025

Strategic Growth Location SG21 Question

Representation ID: 102865

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Alcester (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and low environmental constraints. Due to the size of the development, it is recommended that network upgrades and infrastructure upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a lower risk location.

Other

Preferred Options 2025

Strategic Growth Location SG22 Question

Representation ID: 102911

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Redditch - Spernal (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.

Other

Preferred Options 2025

Strategic Growth Location SG23 Question

Representation ID: 102931

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Wootton Wawen (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. There could potentially be an alternative connection to Redditch - Spernal (STW) Treatment works however there are network constraints due to significant distance from the development site. Overall this development site is considered a medium risk location, as there is capacity however infrastructure upgrades will be required.

Other

Preferred Options 2025

Strategic Growth Location SG24 Question

Representation ID: 102947

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Norton Green (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium risk location, as there is capacity however infrastructure upgrades may be required.

Other

Preferred Options 2025

Potential Settlement Question A1

Representation ID: 102978

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Redditch - Spernal (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. There are network constraints as the distance to the nearest WWTW with available capacity is 3km, therefore significant infrastructure upgrades are required and there are significant costs associated with this. Overall this development site is considered a high risk location.

Other

Preferred Options 2025

Potential Settlement Question A2

Representation ID: 102988

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Redditch - Spernal (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. There are network constraints as the distance to the nearest WWTW with available capacity is 3km, therefore significant infrastructure upgrades are required and there are significant costs associated with this. Overall this development site is considered a high risk location.

Other

Preferred Options 2025

Potential Settlement Question B1

Representation ID: 103003

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Warwick - Longbridge (STW) Treatment Works, this Wastewater Treatment Works has medium capacity and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.

Other

Preferred Options 2025

Potential Settlement Question C1

Representation ID: 103022

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Norton Green (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.

Yes

Preferred Options 2025

Potential Settlement Question E1

Representation ID: 103025

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development will likely require treatment at Stratford - Milcote (STW) Treatment Works, this treatment works has low capacity constraints and low environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a lower risk location.

Other

Preferred Options 2025

Potential Settlement Question F1

Representation ID: 103030

Received: 07/03/2025

Respondent: Severn Trent Water

Representation Summary:

This development site will likely require treatment at Itchen Bank (STW) Treatment Works, this Wastewater Treatment works has medium capacity and very high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.

For instructions on how to use the system and make comments, please see our help guide.