Strategic Growth Location SG21 Question
Representation ID: 102865
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Alcester (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and low environmental constraints. Due to the size of the development, it is recommended that network upgrades and infrastructure upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a lower risk location.
Other
Preferred Options 2025
Strategic Growth Location SG22 Question
Representation ID: 102911
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Redditch - Spernal (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.
Other
Preferred Options 2025
Strategic Growth Location SG23 Question
Representation ID: 102931
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Wootton Wawen (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. There could potentially be an alternative connection to Redditch - Spernal (STW) Treatment works however there are network constraints due to significant distance from the development site. Overall this development site is considered a medium risk location, as there is capacity however infrastructure upgrades will be required.
Other
Preferred Options 2025
Strategic Growth Location SG24 Question
Representation ID: 102947
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Norton Green (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium risk location, as there is capacity however infrastructure upgrades may be required.
Other
Preferred Options 2025
Potential Settlement Question A1
Representation ID: 102978
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Redditch - Spernal (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. There are network constraints as the distance to the nearest WWTW with available capacity is 3km, therefore significant infrastructure upgrades are required and there are significant costs associated with this. Overall this development site is considered a high risk location.
Other
Preferred Options 2025
Potential Settlement Question A2
Representation ID: 102988
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Redditch - Spernal (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. There are network constraints as the distance to the nearest WWTW with available capacity is 3km, therefore significant infrastructure upgrades are required and there are significant costs associated with this. Overall this development site is considered a high risk location.
Other
Preferred Options 2025
Potential Settlement Question B1
Representation ID: 103003
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Warwick - Longbridge (STW) Treatment Works, this Wastewater Treatment Works has medium capacity and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.
Other
Preferred Options 2025
Potential Settlement Question C1
Representation ID: 103022
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Norton Green (STW) Treatment Works, this Wastewater Treatment Works has low capacity constraints and high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.
Yes
Preferred Options 2025
Potential Settlement Question E1
Representation ID: 103025
Received: 07/03/2025
Respondent: Severn Trent Water
This development will likely require treatment at Stratford - Milcote (STW) Treatment Works, this treatment works has low capacity constraints and low environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a lower risk location.
Other
Preferred Options 2025
Potential Settlement Question F1
Representation ID: 103030
Received: 07/03/2025
Respondent: Severn Trent Water
This development site will likely require treatment at Itchen Bank (STW) Treatment Works, this Wastewater Treatment works has medium capacity and very high environmental constraints. Due to the size of the development, it is recommended that network upgrades will be required, alongside hydraulic modelling and engagement with STW. Overall this development site is considered a medium/high risk location, there is some capacity however in order to accommodate growth, infrastructure upgrades will be required and we would need to work closely to understand build timelines, in order to plan accordingly.