Preferred Options

Search representations

Results for Barwood search

New search New search

Object

Preferred Options

PO5: Affordable Housing

Representation ID: 49947

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

We do not see any up to date evidence of the way in which the appropriateness of the affordable housing percentage requirement as been assessed in terms of the financial viability of development in accordance with paragraphs 173 and 174 of the NPPF. Paragraph 7.43 of the DLP makes reference to a November 2011 document and an Addendum dated May 2012. The May 2012 document does not feature in the Evidence Base on the Council's web-site and therefore we reserve the
right to make further representations in this respect upon publication of this document.

Object

Preferred Options

PO6: Mixed Communities & Wide Choice of Housing

Representation ID: 49950

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

We consider that sufficient flexibility should be included within any policy to ensure that account is taken of up to date market demand in addition to the SHMA's. The latter canbecome obsolete very quickly and clearly, if developers feel there is no demand for a particular type of property then they will not build it, which can result in stalled sites and lower rates of housing delivery.

Object

Preferred Options

B. Lifetime Homes

Representation ID: 49951

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

Lifetime Homes: there is no national policy which requires the provision of Lifetime
Homes and we see no justification which supports 25% provision.

Support

Preferred Options

C. Homes for Older People

Representation ID: 49952

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

Homes for Older People: whilst the provision of extra care housing is supported, these have very site specific criteria with operators having specific requirements in respect of site location and suitability. A site which is suitable for market housing may not be suitable for extra care housing and it is important to ensure that this policy is not applied so rigidly so as to sterilise areas of land or stall sites.

Support

Preferred Options

PO8: Economy

Representation ID: 49953

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

It is noted that the Council propose to consider allocating a 'proportion' of the site south of Gallows Hill for employment. The provision of mixed use development is supported although clearly further clarification is required on the definition of 'a proportion'.

Support

Preferred Options

PO10: Built Environment

Representation ID: 49954

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

The Council's Garden Towns, Suburbs and Villages prospectus is supported.

Object

Preferred Options

Preferred Option: Achieving Sustainable Buildings

Representation ID: 49955

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

We have reviewed the Council's evidence base and do not see any case for the
introduction of a 20% climate change policy. We are also disappointed to see a
continued emphasis on renewable energy provision within new developments
as opposed to the emphasis being placed on energy efficiency. If the overall aim is seek a reduction in carbon emissions, we fail to see why this should be achieved through renewable energy rather than energy efficiency measures.

Support

Preferred Options

Preferred Option: Flooding

Representation ID: 49956

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

Whilst the policy as a whole is supported it is noted that much of this replicates national guidance and is therefore superfluous.

Object

Preferred Options

Preferred Option: Water Conservation and Efficiency

Representation ID: 49957

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

The requirement that all new developments include SUDS is unfeasible. There are some instances where SUDS schemes are not feasible or viable and this should be recognised within the policy.

Support

Preferred Options

PO2: Community Infrastructure Levy

Representation ID: 49958

Received: 02/08/2012

Respondent: Barwood

Representation Summary:

Whilst the provision of a draft Infrastructure Plan is supported to assist in providing certainty to developers when bringing forward new sites, particularly in respect of the larger strategic sites. We consider that further refinement of this plan may be needed. For example, within Warwick and Leamington Spa, 6 new primary schools are currently being considered at the same time as capacity in a number of existing schools is also identified.

For instructions on how to use the system and make comments, please see our help guide.