BASE HEADER

Preferred Option: Flooding

Yn dangos sylwadau a ffurflenni 1 i 12 o 12

Gwrthwynebu

Preferred Options

ID sylw: 46536

Derbyniwyd: 17/07/2012

Ymatebydd: Barford, Sherbourne and Wasperton Joint Parish Council

Crynodeb o'r Gynrychiolaeth:

All development should be outside flood risk zones except where that development is absolutely essential at that location.

Testun llawn:

All development should be outside flood risk zones except where that development is absolutely essen...
[dangos mwy]

Gwrthwynebu

Preferred Options

ID sylw: 46664

Derbyniwyd: 20/07/2012

Ymatebydd: Jenny Bevan

Crynodeb o'r Gynrychiolaeth:

The area between Tachbrook Road and Harbury Road could be liable to flooding from the Tachbrook.

Testun llawn:

The area between Tachbrook Road and Harbury Road could be liable to flooding from the Tachbrook.

Cefnogi

Preferred Options

ID sylw: 46999

Derbyniwyd: 26/07/2012

Ymatebydd: Rowington Parish Council

Crynodeb o'r Gynrychiolaeth:

Extremely important to ensure that no development takes place on the flood zones within the parish and all new development is designed to minimize flood risk. Unauthorised development is currently underway within the parish in a Flood Zone 3 location, and such potential impact on life and property should and can be avoided through stricter planning and management controls

Testun llawn:

Extremely important to ensure that no development takes place on the flood zones within the parish a...
[dangos mwy]

Gwrthwynebu

Preferred Options

ID sylw: 47229

Derbyniwyd: 03/08/2012

Ymatebydd: sylvia wyatt

Crynodeb o'r Gynrychiolaeth:

The proposed housing development on the South edge of Kenilworth will have implications for Ashow (and Stoneleigh). The traffic, draining and green belt implications, and the hidden infrastructure needs (eg healthcare) need to be taken properly and explicility into account before the number and location of these houses is agreed

Testun llawn:

The proposed housing development on the South edge of Kenilworth will have implications for Ashow (a...
[dangos mwy]

Cefnogi

Preferred Options

ID sylw: 47269

Derbyniwyd: 27/07/2012

Ymatebydd: Dr GUy Barker

Crynodeb o'r Gynrychiolaeth:

areas such as cubbington and offcurch are already prone to flooding as are areas around the rasc and developments in these areas would exagerate the current problems encouraging run off which would cause flooding

Testun llawn:

areas such as cubbington and offcurch are already prone to flooding as are areas around the rasc and...
[dangos mwy]

Cefnogi

Preferred Options

ID sylw: 47372

Derbyniwyd: 01/08/2012

Ymatebydd: Mr Nick Hillard

Crynodeb o'r Gynrychiolaeth:

The consideration of SUDS principles could (with a little imagination) be extended to existing properties eg reversing the loss of permeable drives and other surfacing. Positive incentives to promote SUDS and relieve pressure on creaking drainage infrastructure.

Testun llawn:

The consideration of SUDS principles could (with a little imagination) be extended to existing prope...
[dangos mwy]

Cefnogi

Preferred Options

ID sylw: 47535

Derbyniwyd: 03/08/2012

Ymatebydd: Canal & River Trust

Crynodeb o'r Gynrychiolaeth:

We would comment that in seeking to resist inappropriate development in flood zones, the locational requirements of canals as non-footloose assets (ie their location and alignment are fixed) means that the options for the location of associated facilities and development is limited, and this should be taken into account when balancing wider benefits of waterway-related development against flood risk considerations.

We would support the incorporation of sustainable drainage systems to manage surface water discharges, but this should be linked to robust provisions for their long-term management and maintenance.

Testun llawn:

We would comment that in seeking to resist inappropriate development in flood zones, the locational ...
[dangos mwy]

Gwrthwynebu

Preferred Options

ID sylw: 47714

Derbyniwyd: 25/07/2012

Ymatebydd: Mrs Louise Drinkhall

Crynodeb o'r Gynrychiolaeth:

Development threatens the local houses with flooding. Property in Myton Crescent was flooded when development was carried out on the Trinity School site. Developing the Myton side of the site would threaten all of the houses south of Myton Road.

Testun llawn:

We have been advised to write to you re new objections to the Core Strategy Plan. Having studied th...
[dangos mwy]

Cefnogi

Preferred Options

ID sylw: 49406

Derbyniwyd: 27/07/2012

Ymatebydd: NFU

Crynodeb o'r Gynrychiolaeth:

New development sites should have land earmarked for SUDs and green space so that runoff can be captured and managed. We therefore broadly welcome the policy but urge the council to thoroughly investigate these impacts to ensure that adequate water resources and drainage capacity is available to cope with the new demands placed on the District's natural infrastructure.

Testun llawn:

Thank you for giving the NFU West Midlands Region the opportunity to comment on the Preferred Option...
[dangos mwy]

Gwrthwynebu

Preferred Options

ID sylw: 49721

Derbyniwyd: 27/07/2012

Ymatebydd: Barford, Sherbourne and Wasperton Joint Parish Council

Crynodeb o'r Gynrychiolaeth:

Development should take place where flooding is unlikely to occur. The low growth option would make it easier to select sites for development that do not carry this risk.

Testun llawn:

PO1 Preferred Option: Level of growth
I consider that the proposed level of housing growth of 555 h...
[dangos mwy]

Cefnogi

Preferred Options

ID sylw: 49917

Derbyniwyd: 02/08/2012

Ymatebydd: Bishops Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

We agree that development should take place where flooding is unlikely to occur. The low growth option would make it easier to select sites for development that do not carry this risk.

Testun llawn:

See Attachments

Cefnogi

Preferred Options

ID sylw: 49956

Derbyniwyd: 02/08/2012

Ymatebydd: Barwood

Crynodeb o'r Gynrychiolaeth:

Whilst the policy as a whole is supported it is noted that much of this replicates national guidance and is therefore superfluous.

Testun llawn:

On behalf of Barwood Strategic Land LLP and the landowners we write in support of their
respective i...
[dangos mwy]