BASE HEADER

Burton Green

Yn dangos sylwadau a ffurflenni 1 i 29 o 29

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 60461

Derbyniwyd: 24/11/2013

Ymatebydd: Mrs Christine Watkinson

Crynodeb o'r Gynrychiolaeth:

I believe this would be the best site for housing as it would link the village together. The school would benefit from some playing fields and parking which is much needed as Hob Lane is an accident waiting to happen at school drop off/pickup times. The village hall would be on site , the village would gain an identity of its own rather than being in danger of getting swallowed up by Coventry . A village green at the corner of Red Lane/Hob/Cromwell lane would give the village a heart and put the GREEN back into Burton Green.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 60473

Derbyniwyd: 28/11/2013

Ymatebydd: Eric Williams

Crynodeb o'r Gynrychiolaeth:

Support the proposals for the preferred option for development of Burrow Hill nursery. Agree with the discounted options, they are unsuitable.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 60766

Derbyniwyd: 13/01/2014

Ymatebydd: Mr Simon Ward

Crynodeb o'r Gynrychiolaeth:

The intake of the local school is 15 pupils per year. The new development is directly next the school and since numbers 75 houses.
With an average of 1.7 dependant children each, if only a third of these are primary school age at any time, it still represents almost half the intake for the school. This will leave undoubtably lead to many people who have lived in the village all their lives being unable to send their children to the village school.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 60876

Derbyniwyd: 15/01/2014

Ymatebydd: mr christopher blomfield

Crynodeb o'r Gynrychiolaeth:

Too many new houses for the size of our village. It represents a 28% increase in numbers and the village cannot sustain this increase without changing its character for the worse.
All the houses are to be built on one site which is too small for the numbers if the estate is not to become an overcrowded ghetto.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61097

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Jacqueline Crampton

Crynodeb o'r Gynrychiolaeth:

There are complex issues to be resolved here.
At least provision should be made for those displaced by HS2 to remain if they want to.
I doubt if anyone will want to buy in the area pending construction of the railway.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61131

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Patricia Deeley

Crynodeb o'r Gynrychiolaeth:

-75 houses quoted is a 28% increase which represents the greatest increase in the county. This figure does not include the approved 28 caravans at Le Van which could result in over 100 new residencies.
- Out of character with rest of Burton Green. Why is ribbon development bad?
- Results in high traffic congestion in one area
- Create a community within a community
- Other sites have been discounted on very weak arguments. Site 6 is currently a mess
- Close to proposed HS2 line with high impact during construction - houses less saleable than other sites

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61132

Derbyniwyd: 19/01/2014

Ymatebydd: mrs bronwyn ward

Crynodeb o'r Gynrychiolaeth:

75 houses is too many for a village of this nature

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61135

Derbyniwyd: 19/01/2014

Ymatebydd: Mr Alan Deeley

Crynodeb o'r Gynrychiolaeth:

-75 houses quoted is a 28% increase representing the greatest increase in the county. This figure does not include the approved 28 caravans at Le Van which could result in over 100 new residencies. Can the school cope?
- Out of character with rest of Burton Green. Why is ribbon development bad?
- Results in high traffic congestion in one area
- Create a community within a community
- Other sites have been discounted on very weak arguments. Site 6 is currently a mess
- Close to proposed HS2 line with high impact during construction - houses less saleable than other sites

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61147

Derbyniwyd: 19/01/2014

Ymatebydd: Mrs Christine Watkinson

Crynodeb o'r Gynrychiolaeth:

I support WDC Preferred Option. The site would be large enough to contain all construction work and vehicles/deliveries during the build phase.
If the housing was split all over the village on different sites the congestion caused with pavement parking etc. would cause havoc throughout the village.
The site already has a footprint of old buildings and a lot of concrete areas. It would not be like digging up a beautiful green field and so would preserve the green belt around the village.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61437

Derbyniwyd: 20/01/2014

Ymatebydd: Mr & Mrs Michael and Deirdre Vernon

Crynodeb o'r Gynrychiolaeth:

-A relatively large single development on the edge of the village would be isolated and bring little benefit to the existing community.
-Wish to preserve the community spirit within the village, especially with disruption from HS2.

In agreement with:
-A mixture of housing types are desirable and that Burton Green would benefit from the influx of wider cross section of society than present.
-Welcome new entrants to the village and particularly if they are able to participate in and enhance village life.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61448

Derbyniwyd: 24/01/2014

Ymatebydd: Ms Samantha Lawrence

Crynodeb o'r Gynrychiolaeth:

The consultation document is also misleading in its description of local transport connections. Burton Green is a linear village, and whereas it is true that it is 0.4 miles from Tile Hill station, this is only in relation to the north end of the village; the majority of the dwellings are at a significantly greater distance of up to 1.5 miles. This includes the proposed site and as a result most people who use the rail network use their car to access the station or, as is preferred by many, drive to the mainline station in Coventry.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61452

Derbyniwyd: 24/01/2014

Ymatebydd: Mr & Mrs Marcus & K Stewart

Crynodeb o'r Gynrychiolaeth:

-The existing nature of the village needs to be maintained at all costs.
-Burton Green should remain a village with an independent identity and that Coventry or Solihull developments do not spread into the Parish boundary.
-The village is enhanced by any future development and that development should add to the long term sustainability of the community.
-The Local Plan, HS2 and local needs are considered holistically not separately.
-Any new development should be low density and include a mixture of housing to encourage young families to the village and bungalows for elderly residents to down size to.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61459

Derbyniwyd: 23/01/2014

Ymatebydd: Mr Peter Stanworth

Crynodeb o'r Gynrychiolaeth:

-The village is under threat from HS2 and already in turmoil.
-Construction phase will cause significant disruption to the village and its residents
-HS2 will make people not want to move to the village.
-75 houses is an increase of 28% of the housing stock in the village, the largest in Warwickshire. Burton Green has few amenities thus this seems out of proportion.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61480

Derbyniwyd: 22/01/2014

Ymatebydd: CPRE WARWICKSHIRE

Crynodeb o'r Gynrychiolaeth:

Burton Green is mainly a long (1 mile) strip of single-house frontage development. To remove Burton Green from the Green Belt would risk intensification of development in a long linear corridor. It is essential to avoid larger or bulkier houses along the single road. To avoid harm to openness Burton Green should stay with 'washed-over; status.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61616

Derbyniwyd: 29/01/2014

Ymatebydd: Ms D Bassett

Crynodeb o'r Gynrychiolaeth:

-New housing in Burton Green would have a huge impact on the infrastructure.
-Cromwell Lane is already subject to traffic congestion which would be worsened by building 75 houses. Such congestion would take away the village environment, which attracts people to live in the village.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61652

Derbyniwyd: 14/01/2014

Ymatebydd: Mrs Lesley Tacon

Crynodeb o'r Gynrychiolaeth:

-Support expanding Burton Green to refresh village and make it sustainable in terms of population/age profile.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61776

Derbyniwyd: 24/01/2014

Ymatebydd: Burton Green Parish Council

Crynodeb o'r Gynrychiolaeth:

-There is no real consideration for HS2.
-Development of 70 - 90 properties would alter the linear nature of the village.
-The proposed numbers were to take into account properties destroyed by HS2. The number of properties impacted by HS2 has decreased.
-Disappointed by the abandonment of the wildlife corridor plans.
-Site 2 and 7 cannot create a village centre with facilities, parking and housing at the same time.

Parish Plan 2013 questionnaire indicate that residents:
-Valued the rural location, open views and pleasant location.
-Were concerned over the impact of HS2 on the sustainability of the village.

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 61934

Derbyniwyd: 23/01/2014

Ymatebydd: Shaun & Ann Pitt

Crynodeb o'r Gynrychiolaeth:

-Supports the principle of development in Burton Green.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 61997

Derbyniwyd: 12/12/2013

Ymatebydd: Mr Peter Stanworth

Crynodeb o'r Gynrychiolaeth:

-On the plan of Burton Green there is a hatched area outlined with dotted lines in red. I presume that this area of land that would be taken up by the proposed HS2 railway. It is not defined. If this is the proposed route of the railway then you have no mention of the land that would be generated by the cut and cover tunnel. This should surely be considered as land that could be used for housing?

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 62024

Derbyniwyd: 15/01/2014

Ymatebydd: Mrs Sue Rogers

Crynodeb o'r Gynrychiolaeth:

-Approve of some increase in the number of houses in Burton Green.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62025

Derbyniwyd: 15/01/2014

Ymatebydd: Mrs Sue Rogers

Crynodeb o'r Gynrychiolaeth:

-It is unfair to burden the village with 75 additional houses, a 28% increase which is the greatest increase in the county.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62041

Derbyniwyd: 22/01/2014

Ymatebydd: Dr Andrew Gibbs

Crynodeb o'r Gynrychiolaeth:

-The requirement for Burton Green to accommodate further 70 - 90 homes is excessive and would create a large change in the population.

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62094

Derbyniwyd: 17/01/2014

Ymatebydd: Mr James Fielding

Crynodeb o'r Gynrychiolaeth:

-Development would create a 28.5% increase in dwellings and the potential population increase of 35%, why does Burton Green have to have such an increase?

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62096

Derbyniwyd: 16/01/2014

Ymatebydd: Mrs Alison Fielding

Crynodeb o'r Gynrychiolaeth:

-Development would create a 28.5% increase in dwellings and the potential population increase of 35%, why does Burton Green have to have such an increase?

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62102

Derbyniwyd: 14/01/2014

Ymatebydd: Mrs Lesley Tacon

Crynodeb o'r Gynrychiolaeth:

Burton Green's infrastructure and services need improvement if they are to sustain a larger population:
-Village hall is currently at capacity for events for local residents. HS2 will only replace 'like for like'.
-School would wish to keep traditional Victorian school.
-Water pressure is currently inadequate.
-Broadband speed is very low.
-Roads/parking issues would need to be addressed.
-Medical services and a shop need to be provided.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62104

Derbyniwyd: 20/01/2014

Ymatebydd: Mr Michael Fettes Mattocks

Crynodeb o'r Gynrychiolaeth:

-Burton Green should not be subjected to a 28% increase in housing.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 62181

Derbyniwyd: 17/01/2014

Ymatebydd: Mrs Lucy Hatton

Crynodeb o'r Gynrychiolaeth:

-The average increase in dwellings in your 'secondary service villages' is approximately 14%, what exceptional circumstances are there in Burton Green that you consider it requires more than double that?
-Assume that the report was formulated prior to WDC giving planning permission for 28 units on La-van site opposite the preferred option. If not, this would increase the total dwellings in the village to 40% which would completely alter the nature of the village.

Atodiadau:

Cefnogi

Village Housing Options and Settlement Boundaries

ID sylw: 63369

Derbyniwyd: 17/01/2014

Ymatebydd: Crest Strategic Projects

Asiant : d2planning

Crynodeb o'r Gynrychiolaeth:

Burton Green is a settlement capable of accommodating additional residential development.

Atodiadau:

Gwrthwynebu

Village Housing Options and Settlement Boundaries

ID sylw: 63370

Derbyniwyd: 17/01/2014

Ymatebydd: Crest Strategic Projects

Asiant : d2planning

Crynodeb o'r Gynrychiolaeth:

-Burton Green should not be within the Secondary Service Category, capable of accommodating 70 - 90 dwellings. The settlement has a range of facilities including a primary school with spare capacity. It also has good public transport links both by bus and rail to larger centres.

Atodiadau: