BASE HEADER

DS4 Spatial Strategy

Yn dangos sylwadau a ffurflenni 31 i 40 o 40

Cefnogi

Publication Draft

ID sylw: 66480

Derbyniwyd: 27/06/2014

Ymatebydd: Friends of the Earth

Nifer y bobl: 4

Crynodeb o'r Gynrychiolaeth:

Support

Gwrthwynebu

Publication Draft

ID sylw: 66558

Derbyniwyd: 27/06/2014

Ymatebydd: CPRE WARWICKSHIRE

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We welcome the efforts of the District Council in Policy DS4 to prioritise housing development on brownfield sites / Completions and sites with planning permission account for 3,629 dwellings. Small urban sites, consolidation of existing employment sites and the allowance for windfall sites account for a further 3,147 dwellings.

Despite the above, the District Council are proposing to provide almost half the total provision in the form of sites newly allocated in the Plan.

850 would be on the southeast side of Kenilworth in the Green Belt. As noted in other responses, we do not consider that the Plan demonstrates the exceptional circumstances required to remove land from the Green Belt for new allocated housing sites.

Sites on the edge of villages and in the rural area account for a further 763 dwellings. Some of the proposals involve substantial expansion of relatively small settlements and we are particularly concerned about those for Leek Wootton, Kingswood (Lapworth), Bishops Tachbrook, Cubbington, Hampton Magna and Radford Semele.

Atodiadau:

Cefnogi

Publication Draft

ID sylw: 66605

Derbyniwyd: 27/06/2014

Ymatebydd: Richborough Estates Ltd

Asiant : Strutt & Parker

Crynodeb o'r Gynrychiolaeth:

The policy provisions as contained within Strategic Policy DS4 are supported. In particular criterion g) which sets out the exceptional circumstances for allowing new development within the Green Belt. In light of the national planning policy requirement for LPAs to identify and update annually a supply of specific deliverable sites sufficient to provide five years' worth of housing against their housing requirements with an additional buffer (paragraph 47 of the Framework), it is considered appropriate for the Local Plan to provide a mechanism through which Green Belt land could come forward. Accordingly, Strategic Policy DS4 is considered positively prepared; justified; effective; and consistent with national policy.

Gwrthwynebu

Publication Draft

ID sylw: 66615

Derbyniwyd: 26/06/2014

Ymatebydd: Mr William Blagburn

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Ydi

Crynodeb o'r Gynrychiolaeth:

The Local Plan does not include the need for Warwick University to expand or any anticipated housing required for the 10,000 employees to work at the Coventry & Warwickshire Gateway Site if it goes ahead.
Why does the Plan not refer to the Kings Hill site as there may be a case for it to go ahead to meet the future needs as it is near both the University of Warwick & Gateway. The increase in congestion of the already hard pressed local road structure will need dramatic action.
The B4113 which already services the developing sites of Stoneleigh Park & Abbey Park will not only have to take increased traffic to/from Gateway from the South but cope with this possible increased housing.
WDC should consider replacing the B4113 river bridge at Stoneleigh, which can not even take two HGV vehicles crossing at a time. If the river bridge was sited 450m upstream a small by pass could be built to bypass the village completely and cut out many of the traffic problems caused by the village being sited on the cross road and river bridge.

Cefnogi

Publication Draft

ID sylw: 66692

Derbyniwyd: 23/06/2014

Ymatebydd: Old Milverton & Blackdown JPC

Crynodeb o'r Gynrychiolaeth:

The Parish Council supports the broad thrust of the Publication Draft and believes that the District Council has balanced necessary growth with the protection of areas that are of historic, environmental and recreational importance to the District.

Atodiadau:

Cefnogi

Publication Draft

ID sylw: 66726

Derbyniwyd: 25/06/2014

Ymatebydd: Sir Thomas White's Charity & King Henry VIII Endowed Trust

Asiant : Stansgate Planning

Crynodeb o'r Gynrychiolaeth:

Supports Part (g) of Policy DS4 which recognises the need to allocate some land for development which is currently within the Green Belt. This will enable the housing needs of the most sustainable villages to be met and also allow for the regeneration of communities bordering the Green Belt.

Atodiadau:

Gwrthwynebu

Publication Draft

ID sylw: 66778

Derbyniwyd: 27/06/2014

Ymatebydd: Bishop's Tachbrook Parish Council

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Ydi

Crynodeb o'r Gynrychiolaeth:

DS7 shows how the housing requirement will be met. The requirement needs to be revised to comply with the reduction in the population growth now known.

The completion between 2011 and 2013 are not consistent with the figure published in June 2013.

DS7 makes no provision to account for 687 over-supply form previous years (see PPG 3-036), nor does it account for 450 completions during 13/14. It does not include completions since 1/4/14 nor does it include an up to date assessment of site under construction. Finally it does not take account of vacant dwellings.

DS7 includes a balance to be provided on allocated sites. NE5 conflicts with DS11 where the Local Plan includes a significant number of sites as a first call for the housing required, before brownfield and urban regeneration sites have been fully examined.

The housing trajectory is unexplained and shows annual targets that are unlikely to be met. For a trajectory to be achieved, it should be site related so that as sites are approved they can be included in the trajectory correctly and confidently. 2014/15 is supposed to deliver over 1,000 homes but as yet none of the large sites have commenced.

DS4 is not be observed in other policies indicating inconsistencies. In the first instance, allocations will be directed to previously developed land within urban areas - if this is the case why have 5 major sites been approved in advance of previously developed land within the urban areas? greenfield sites will not need to be identified for housing because the revised population projection shows that the number of homes have either already been built, permission granted, allocated without involving greenfield or green belt for up to 10,100 homes, more than is now known to be required.

Atodiadau:

Gwrthwynebu

Publication Draft

ID sylw: 66789

Derbyniwyd: 26/06/2014

Ymatebydd: Gallagher Estates

Asiant : Pegasus Group

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

In broad terms the spatial strategy is inherently sound and positively prepared and consistent with national policy. However in contrast to RDS3 of the RDS it introduces two further aspects to the spatial strategy at parts e (avoiding development that has a detrimental impact on heritage impacts unless mitigation can be put in place) and f (avoiding development in areas assessed as high landscape value). Whilst laudable these are not these are not provisions that are relevant to the broad, strategic spatial strategy of the plan. Suggest these are superfluous and should be deleted .

Gwrthwynebu

Publication Draft

ID sylw: 67142

Derbyniwyd: 24/06/2014

Ymatebydd: Mr Ray Steele

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

The LP should be for the needs of houses and jobs within the whole of the district. The chosen sites in the south have a good unemployment record. In contrast, in the north of the district there is a much greater need for homes and jobs. There is currently the Gateway Project that will create many jobs and a need for houses. Logically one would assume houses to be built where there is employment. The LP, unless radically changed, will create a massive need for commuting to jobs and schools

Atodiadau:

Gwrthwynebu

Publication Draft

ID sylw: 67225

Derbyniwyd: 27/06/2014

Ymatebydd: Bloor Homes Midlands

Asiant : Marrons Planning

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The policy approach to conserving and enhancing the historic environment is not in accordance with the NPPF.
The Framework recognises that the heritage assets are an irreplaceable resource only permitting substantial harm where this is outweighed by substantial public benefit. Where harm is less than substantial then it should be weighed against public benefit. There is no reference to allowing harm/detrimental impacts where there is possible mitigation.
The more relaxed policy approach of the LP is not appropriate, particularly given the importance of the historic environment to Warwick.