Mod 6 - Policy DS7

Yn dangos sylwadau a ffurflenni 1 i 30 o 33

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68380

Derbyniwyd: 22/04/2016

Ymatebydd: Cryfield Land (Kenilworth) Ltd

Asiant : Mr Niall Crabb

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

It is considered that the modifications still do not provide for sufficient land to meet the unmet need nor provide for adequate flexibility in meeting future need. The housing demand/need across the wider Region, including Birmingham is growing and this should be reflected by all the Authorities rather than just those in the currently defined SHMAs.

Sites "allocated" are seemingly based on the Sustainability Appraisal Report which has not been the subject of transparent debate. As a result, it is believed that there are clear flaws in the assessment process.

Cefnogi

Proposed Modifications January 2016

ID sylw: 68547

Derbyniwyd: 22/04/2016

Ymatebydd: Rcihborough Estates Partnership LLP

Asiant : Star Planning and Development

Crynodeb o'r Gynrychiolaeth:

The Richborough Estates Partnership LLP welcome the efforts made by Warwick District Council to respond positively to the Inspector's interim conclusions concerning the level of housing which should be delivered by the Warwick District Local Plan.

Further consideration is given to the appropriateness of the objectively assessed housing need and the proposed housing provision as part of representations submitted by others. Accordingly, as part of these representations no comments are made by Richborough.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68878

Derbyniwyd: 20/04/2016

Ymatebydd: A C Lloyd Homes Ltd

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

- support allocation of additional sites for housing
- support housing allocation at Seven Acres Close, Bishop Tachbrook (H49), however, this should be increased to 50 dwellings from 30
- site is capable of accommodating 50 dwellings and would contribute to the housing need


Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68885

Derbyniwyd: 20/04/2016

Ymatebydd: Deeley Group Ltd.

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

WDC has allocated a additional sites for housing through the Proposed Modifications to meet increased housing requirement including a number of Green Belt sites.
Mod6 states that in total 9,369 dwellings are to be delivered on sites allocated in the Plan bringing the total provision to 17,577 dwellings.
Whilst the identified housing land supply (17,577 dwellings) is above the agreed objectively
assessed housing need(16,776 dwellings) and therefore allows for some flexibility if allocated sites fail to come forward/are delivered with reduced capacity, the proposed housing land supply does not provide sufficient flexibility to significantly boost supply of housing in the District.
The proposed supply is only 801 dwellings above the identified requirement, representing less than 5% of the
overall need and is not sufficiently flexible to ensure that the LP can readily adapt to changing circumstances.
The LP is not effective as it risks not delivering the full objectively assessed housing requirements unless additional sites are allocated to provide for greater choice.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68887

Derbyniwyd: 20/04/2016

Ymatebydd: Oaklands Farm and AC Lloyd Homes

Asiant : Delta Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Number of green belt sites have been allocated to meet additional need.
While total figure to be provided is above OAN, allowing for some flexibility, proposed housing supply does not provide sufficient flexibility to significantly boost housing supply.
Proposed supply 801 dwellings above OAN, equating to less than 5% of general housing need.
Local Plan not effective as it risks not delivering full OAN unless additional sites are identified.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68936

Derbyniwyd: 20/04/2016

Ymatebydd: Peter Langley

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

SHMA not independent. Projections used as forecasts. Questionable assumptions on headship rates. Economic issues, commuting, international migration, student needs, affordable housing unaddressed.
MOU didn't consider policy factors limiting ability to meet needs. Distribution decisions arbitrary, opaque, extreme. Warwick taking largest share of overspill unjustified given Green Belt.
Can't demonstrate that 17,000 dwellings can be built by 2029.
Cumulative impact of proposals exacerbates extant problems. Nearly half of housing development would be in Green Belt - does not comply with NPPF. Insufficient consideration of infrastructure implications.
Plan unsound, unsustainable, unworkable. Housing provision between 10,000 and 10,500 more appropriate / achievable.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68974

Derbyniwyd: 20/04/2016

Ymatebydd: Mr. David Clarke

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

New settlement would have been appropriate solution: -
- amenity of extant villages unaffected
- costs for infrastructure would be clearer and easier to recoup from developers
- would meet requirements of exceptional circumstances more easily

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69008

Derbyniwyd: 22/04/2016

Ymatebydd: The Kler Group

Asiant : Barton Willmore

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Insufficient land is allocated in Burton Green to meet the future needs of the village, particularly in the context of HS2 which could result in a net loss of dwellings.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69018

Derbyniwyd: 21/04/2016

Ymatebydd: Taylor Wimpey

Asiant : RPS Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Modification includes additional housing provision, an allowance of 1,134 dwellings from windfall sites coming forward over the plan period and a small urban site allowance.
1,134 windfall allowance represents considerable source of future housing supply - should be converted into positive allocations. Additional capacity exists within the Growth Villages and in particular at Radford Semele. Given the need to boost supply of housing land, should make positive allocations, consistent with NPPF, rather than relying on unidentified potential source of supply.
Should additional sites come forward, would be consistent with flexible plan and NPPF and does not need specific allowance.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69210

Derbyniwyd: 22/04/2016

Ymatebydd: Barwood Development Securities Ltd

Asiant : HOW Planning LLP

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Policy DS7 identifies that 1,134 units will be delivered via windfall allocations over the period April 2015 to March 2029, equating to 81 dwellings per annum. No updated evidence to support this approach to windfall development.
As new allocations have been provided to deliver needs of the Borough, Council cannot assume that historic rate of windfall development will continue.
Yield from windfalls in first few years of the plan period will come mostly from sites with planning permission. At the start of the assessment period, doubtful whether the full averaged annual allowance of 81 additional windfall dwellings will be delivered.

Atodiadau:

Cefnogi

Proposed Modifications January 2016

ID sylw: 69235

Derbyniwyd: 22/04/2016

Ymatebydd: Taylor Wimpey

Asiant : Barton Willmore

Crynodeb o'r Gynrychiolaeth:

HAMPTON MAGNA
we support the approach of the Council in seeking to allocate additional land; as such an approach will be more effective in delivering the minimum housing needs of the area, and is flexible to changing demands over the Plan period.

The proposed approach to allocations and safeguarding land will also assist the Council in demonstrating that they have been both aspirational and realistic in progressing the Plan in accordance with paragraph 154 of the NPPF; with the slight overprovision allowing for any slippages in the delivery of the strategic sites

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69267

Derbyniwyd: 22/04/2016

Ymatebydd: Mr Edward Walpole-Brown

Asiant : Brown and Co

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

We challenge the need to accommodate windfall sites as part of the overall assessment and again challenge the fact that our client's site is not allocated and there is insufficient flexibility in the Plan Policies to cater for good sensible limited development in village locations that will produce community facilities and other benefits.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69290

Derbyniwyd: 22/04/2016

Ymatebydd: Parklands Consortium Ltd

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Object to proposals:
- contrary to NPPF
- area previously preserved
- proposal to remove site capable of containing 4,000 houses to provide for 1,800 houses unjustified
- no exceptional circumstances demonstrated
- no landscape analysis of whole of SMA that justifies removal of site from green belt

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69352

Derbyniwyd: 15/04/2016

Ymatebydd: Crest Strategic Projects Limited

Asiant : d2planning

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Proposed housing provision should be viewed as a minimum and that the Local Plan should plan for additional housing over and above 16,776 new dwellings, given that Coventry's unmet need may be higher than currently identified and if Nuneaton and Bedworth don't agree to take a proportion of Coventry's need.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69366

Derbyniwyd: 21/04/2016

Ymatebydd: Friends of the Earth

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Housing numbers not justified. Support Bishops Tachbrook PC in figures analysis.
Land with high landscape value, and 'best and most versatile' agricultural land was avoided. Modification sites not selected in same way.
Particularly relevant to Kings Hill - considered previously, rejected on green belt grounds.
Many allocated sites in unsustainable locations, away from town centre facilities, without infrastructure. Proposals allowing residents to travel by non- car means very weak. Creates more vehicle journeys with adverse impact on air pollution. Emphasis should be on high quality sustainable transport links to all development sites, including public transport, walking, cycling.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69447

Derbyniwyd: 22/04/2016

Ymatebydd: Nurton Developments

Asiant : Chave Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Object to proposal: -
- still uncertainty over quantum of unmet need arising from Birmingham
- position of Nuneaton & Bedworth unclear and undermines certainty over housing distribution
- plan period should be extended to 2031 to match period of OAN assessment and distribution
- plan doesn't allocate sufficient sites to meet OAN with flexibility
- allocations won't come forward as quickly as envisaged
- plan doesn't provide five-year housing supply upon adoption

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69459

Derbyniwyd: 22/04/2016

Ymatebydd: The Warwick Society

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

the proposed increase in the numbers of houses to be built does not reflect a satisfactory 'objective assessment of need', but are instead based on exaggerated and unfounded projections of housing demand in Coventry.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69484

Derbyniwyd: 21/04/2016

Ymatebydd: Centaur Homes

Asiant : McLoughlin Planning

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Since the Inspector found the windfall figure unjustified, the Council have lowered the figure.
However according to the letter from the Council leader to the Inspectorate dated 14th October 2015, work is still on going "regarding a justifiable level of windfalls" and the figure put forward is "just an estimate". No further evidence has been provided within the proposed modifications to support this figure, even though it is lower than the previous allowance.
As a result, Centaur consider the Plan's approach towards windfalls to still be unsound as it is clearly contrary to national guidance and the fact that the Plan is supported by a robust SHLAA. Given the detail in the SHLAA, further housing allocations can be made to further reduce risk of the housing target being met.
In addition, subject to other representations looking for the Plan's target to be
expressed as a minimum, it would provide the necessary flexibility for windfalls to come forward.
The concerns about the windfall figure can be redressed (in part) through the allocation of additional land at Maple Lodge at Hampton Magna for housing development.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69820

Derbyniwyd: 22/04/2016

Ymatebydd: Bishop's Tachbrook Parish Council

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The table to the policy is more than 12 months out of date as it only records completions between April 2011 and March 2015.
BTPC has been keeping an updated record of all compliant planning approvals given and building regulations data that has been deposited and recorded starts and completions. These include applications that do not need planning approval as they are permitted developments but nevertheless need to comply with building regulations and that produce additional dwellings (a copy is attached).
Rather than 1,483 completions, at least 2,200 completions are known to have occurred since 1st April 2011 to date. This compares with the DCLG household projection for mid-2016 that was 2,599 completions may be required and the actual number of completions required to meet the 2013 and 2014 mid-year population estimates converted to completions of 2,050 by mid-2016.

The original full text includes tables to illustrate.

The final numbers show that even if the maximum figure of 16,776 goes ahead, there are 1,281 sites more than needed to provide for both Warwick District and Coventry's unmet need.
Within the modified plan there are many references to providing sites for Coventry's unmet need immediately adjacent to Coventry. Without any further planning grants there are already 9,418 sites, either not started, started or complete to meet Warwick's FOAN of 10,800 sites.
The conclusion is that since all the Warwick FOAN is fully planned and available and there are sufficient sites around Coventry and the north of the District to meet Coventry's unmet need, then there is no further need to include any more sites than the 5,415 sites south of the towns.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69838

Derbyniwyd: 22/04/2016

Ymatebydd: Mrs J Mackenzie

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Allocations contrary to NPPF requirement to maintain separation, prevent coalescence
Numbers based on Coventry requirements not approved in local plan, revised before 2017?
No critical examination of claims that land unavailable -areas of Coventry green belt could be developed with less impact
Provision of land to meet Coventry's overspill contrary to NPPF - require sub-regional SA to be valid
How do proposals fit with neighbouring development
No consultation undertaken with parish councils before decisions made
MoU providing additional housing for Combined Authority circumvents democratic process, NPPF
Impact of proposals at Thickthorn and Kings Hill next to over-capacity A46 not considered

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69900

Derbyniwyd: 22/04/2016

Ymatebydd: Hatton Estate

Asiant : Barton Willmore

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Need for greater flexibility to be built in to the Plan. Safeguarding land on its own will not be enough. Further land needs to be allocated and/or reserved to meet identified housing need.
Inspector's initial matters and issues makes clear that some authorities could be asked to accommodate unmet needs from the Greater Birmingham area.
Alongside the inclusion of a reserve site, the inclusion of safeguarded land at Hatton Station will play a key role in achieving outcomes and as a requirement of paragraph 85 of the Framework

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69922

Derbyniwyd: 20/04/2016

Ymatebydd: Mr & Mrs Jarrett

Asiant : McLoughlin Planning

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Plan's approach towards windfalls is still unsound as it is clearly contrary to national guidance and the fact that the Plan is supported by a robust SHLAA. Given the detail in the SHLAA, further housing allocations can and should be made to further reduce any risk of the housing target being met. In addition, subject to other representations looking for the Plan's target to be expressed as a minimum, it would provide the necessary flexibility for windfalls to come forward.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69929

Derbyniwyd: 22/04/2016

Ymatebydd: Gladman Developments

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There is a need to allocate an additional layer of small to medium sites (circa 50-150 dwellings per site) to deliver additional housing in the first 5 years of the plan, to meet both the additional level of unmet HMA need and to provide a 5 year land supply. We believe that by identifying such sites, either through the allocation of omission sites or by giving consideration to the extension or enlargement of existing smaller allocations, it will be possible adopt a sound plan.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69938

Derbyniwyd: 22/04/2016

Ymatebydd: Developer Consortium

Asiant : Barton Willmore

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Concerned that the level of uplift at the HMA and District levels is insufficient. The housing requirement for the HMA over the period (2011-2031) should be a minimum of 100,100 dwellings (5,005 dpa), with our updated and preferred methodology increasing this to 126,000 dwellings (6,300 dpa). This indicates a shortfall in the full, objective assessment of housing need across the HMA of at least 14,660 dwellings when compared against the most recent update to the joint SHMA of September 2015, indicating a requirement of 4,272 dpa / 85,440 dwellings in total.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69942

Derbyniwyd: 22/04/2016

Ymatebydd: Taylor Wimpey

Asiant : Cerda Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

- Proposed Modification 6 sets out a total of 17,577 homes which provides a buffer 4.5% (801 dwellings more) than the housing target of 16,776 set out at Modification 4.

- The 4.5 % buffer would only be sufficient to deal with very minor changes to the demand or. Accordingly, the Plan is not considered sound in so far as there is insufficient flexibility to cater for either i) sites not coming forward for development or ii) greater than anticipated levels of demand.

Atodiadau:

Cefnogi

Proposed Modifications January 2016

ID sylw: 69966

Derbyniwyd: 22/04/2016

Ymatebydd: Sharba Homes

Asiant : Barton Willmore

Crynodeb o'r Gynrychiolaeth:

RADFORD SEMELE
Council propose to deliver an additional 811 dwellings, over and above the proposed requirement of 16,766 dwellings for the Plan period. Regardless of the housing requirement, we support the approach of the Council in seeking to allocate additional land; as such an approach provides a positively prepared Plan that will be more effective in delivering the minimum requirements of the area, and is flexible to changing demands over the Plan period. This is supported in the NPPF at paragraph 14 where national policy supports the objective of meeting the OAHN with sufficient flexibility to adapt to rapid change.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69977

Derbyniwyd: 22/04/2016

Ymatebydd: Grevayne Properties Ltd

Asiant : Cerda Planning Ltd

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

DS7 provides for a buffer of 801 dwellings or 4.5%. This is sufficient to deal only with minor changes in demand or supply. The allocations need to be increased as a result. Further, the latest 5 year housing land supply position published by the Council does not take in to account Coventry's shortfalls, let alone any further shortfall arising from Birmingham. It is therefore clear that the delivery of housing needs to be increased to deal with historic undersupply and the required buffer.

Cefnogi

Proposed Modifications January 2016

ID sylw: 70008

Derbyniwyd: 22/04/2016

Ymatebydd: Sharba Homes

Asiant : Barton Willmore

Crynodeb o'r Gynrychiolaeth:

BISHOPS TACHBROOK
Additional 811 dwellings proposed over and above 16,766 dwellings in Plan period. Support Council in allocating additional land; Plan will be more effective in delivering minimum requirements of area, flexible to changing demands. Supported in NPPF paragraph 14.
Will assist Council in demonstrating that they have been both aspirational and realistic in progressing Plan (in accordance with NPPF), with slight overprovision allowing for slippages in the provision of wider strategic sites - may be helpful given proximity of allocations to south of Warwick/Leamington Spa - and maximise chance of five-year housing land supply being demonstrable over Plan period.

Cefnogi

Proposed Modifications January 2016

ID sylw: 70037

Derbyniwyd: 22/04/2016

Ymatebydd: Taylor Wimpey

Asiant : Barton Willmore

Crynodeb o'r Gynrychiolaeth:

Provision over and above the housing requirement is supported and adds to the soundness of the Plan by providing flexibility. the inclusion of safeguarded land is also important.

this will assist n demonstrating that the plan is aspirational and realistic; with the slight overprovision allowing for any slippages in the delivery of the strategic sites within the District - which may be particularly helpful given the proximity of a number of allocations to the south of Warwick/Leamington Spa - and maximising the chance of a five year housing land supply being demonstrable over the Plan period.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 70047

Derbyniwyd: 22/04/2016

Ymatebydd: CPRE WARWICKSHIRE

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

The plan gives little consideration to the density of new housing development or whether intensification of use of the existing housing stock could be achieved without loss of quality in the urban environment. On most development sites, a density of 35 dwellings per hectare has been uncritically adopted, ignoring the variability between sites and their settings and the potential for higher density. By leaving this vital issue unconsidered, it fails to provide adequate justification for the link between the vast quantum of new housing development proposed and the huge land area involved.