BASE HEADER

Mod 8 - Policy DS10

Yn dangos sylwadau a ffurflenni 1 i 30 o 31

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68382

Derbyniwyd: 22/04/2016

Ymatebydd: Cryfield Land (Kenilworth) Ltd

Asiant : Mr Niall Crabb

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Nac Ydi

Crynodeb o'r Gynrychiolaeth:

It is considered that the modifications still do not provide for sufficient land to meet the unmet need nor provide for adequate flexibility in meeting future need. There has not been a proper, transparent debate on which sites should be "allocated" which means that there has not been a proper transparent debate on the relative merits of those sites "allocated" and sites which have not.
Land on the edge of Coventry is vital to this process and it is strongly believed that in the study used to allocate/not allocate sites, there are clear flaws in the assessment process

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68407

Derbyniwyd: 19/04/2016

Ymatebydd: Leamington Society

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Ydi

Crynodeb o'r Gynrychiolaeth:

Proposed new housing density is too low occupying too big an area of land and encroaching on Greenfield land.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68409

Derbyniwyd: 19/04/2016

Ymatebydd: Leamington Society

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Ydi

Crynodeb o'r Gynrychiolaeth:

Housing density proposed for green field and Green belt area is too low, leading to profligate use of land and dependence on motor cars for transport to and from employment and local shops and schools etc.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68411

Derbyniwyd: 19/04/2016

Ymatebydd: Leamington Society

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Ydi

Crynodeb o'r Gynrychiolaeth:

WDC have not even considered the option of high density housing , which would enable WDC to avoid concreting over large areas of green field or even Green belt. Suburban sprawl will generate more car use and more pollution.

Cefnogi

Proposed Modifications January 2016

ID sylw: 68551

Derbyniwyd: 22/04/2016

Ymatebydd: The Richborough Estates Partnership LLP

Asiant : Star Planning and Development

Crynodeb o'r Gynrychiolaeth:

The exceptional circumstances exist to amend the Green Belt boundary to deliver the spatial strategy for growth at sustainable locations which is necessary to accommodate the objectively assessed housing need.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68691

Derbyniwyd: 21/04/2016

Ymatebydd: Mr Edward Norris

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Heb nodi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

As a resident of Coventry who has lived on the border of Warwick District Council for 40 years I am writing to place on record my objection to the plan to build on the area known as site ref H43 (Kings Hill).
I have listened to all the arguments both "for" and "against" and I can see no justification for building within this area. I request that these plans are reviewed and turned down on the basis that Coventry has more than enough of its own "brown field" sites to accommodate this house building plan.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68793

Derbyniwyd: 22/04/2016

Ymatebydd: Colin Quinney

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

This should be adjusted to deliver adequate sustainability

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 68870

Derbyniwyd: 20/04/2016

Ymatebydd: Kenilworth Town Council

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Concern about flooding

Finham Brook, a main river drains the town.

The proposed modifications to Policy DS10 introduce 2,245 houses on land on the edge of Coventry which will drain into Finham Brook

No analysis of the combined effect of all this development on the flooding risk in Kenilworth town.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69075

Derbyniwyd: 22/04/2016

Ymatebydd: Dellacqua Ltd.

Asiant : Hancock Town Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Objects to proposed housing strategy for south Warwick / Leamington - makes inadequate provision for associated highways infrastructure necessary to enable proposed development to take place without unacceptable impacts on operation of Technology Park.
Access already constrained even before additional housing is brought forward.
No clear timetable for delivery in either local plan modifications or IDP.

Cefnogi

Proposed Modifications January 2016

ID sylw: 69163

Derbyniwyd: 22/04/2016

Ymatebydd: Lioncourt Strategic Land - Andy Faizey

Asiant : Savills

Crynodeb o'r Gynrychiolaeth:

SUPPORT modification and the inclusion of Kings Hill as a new site allocation.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69211

Derbyniwyd: 22/04/2016

Ymatebydd: Barwood Development Securities Ltd

Asiant : HOW Planning LLP

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Acknowledge and support, to an extent, increased level of growth directed to the Growth Villages, however the Council's distribution of the updated OAN requirement to Growth Villages does not go far enough.
Policy DS10 is not justified as the approach to the release of a significant amount of land from the Green Belt is not based upon a robust evidence base.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69252

Derbyniwyd: 22/04/2016

Ymatebydd: CEG Steel/Pittaway

Asiant : Nexus Planning

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Council should allocate both H42 and S1 as a single strategic allocation, with a restriction on dwelling occupation in advance of the required highway interventions being delivered. This is fully consistent with NPPF and would provide a much more logical and robust framework for the comprehensive planning of the area. Would enable allocation of a larger proportion of housing where significant pressures exist.
STA didn't consider more equitable distribution between Westwood Heath and Kings Hill. This would enable a reduced reliance upon any single site and limit risk that housing trajectory not realised

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69269

Derbyniwyd: 22/04/2016

Ymatebydd: Mr Edward Walpole-Brown

Asiant : Brown and Co

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

There should be an increase in the distribution of houses to the Growth Villages and the rural area. As alluded to before, a number of Growth Villages should be expanded or a further category produced for other village locations where sensible sustainable limited housing growth can occur consistent with general Plan Policies.

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69292

Derbyniwyd: 22/04/2016

Ymatebydd: Parklands Consortium Ltd

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Object to proposals:
- contrary to NPPF
- area previously preserved
- proposal to remove site capable of containing 4,000 houses to provide for 1,800 houses unjustified
- no exceptional circumstances demonstrated
- no landscape analysis of whole of SMA that justifies removal of site from green belt

Atodiadau:

Cefnogi

Proposed Modifications January 2016

ID sylw: 69353

Derbyniwyd: 15/04/2016

Ymatebydd: Crest Strategic Projects Limited

Asiant : d2planning

Crynodeb o'r Gynrychiolaeth:

Representations should be read in conjunction with those on Mod 3.
Support the Local Plan's position in that greenfield sites located in sustainable locations are required to meet overall housing provision for District including unmet housing need for Coventry. Also support position that for greenfield sites to be sustainable, land for housing should be identified in the Green Belt close to built-up areas

Cefnogi

Proposed Modifications January 2016

ID sylw: 69486

Derbyniwyd: 21/04/2016

Ymatebydd: Centaur Homes

Asiant : McLoughlin Planning

Crynodeb o'r Gynrychiolaeth:

Centaur Homes supports the revised distribution and the increase of dwellings to the Growth Villages. Such an approach is consistent with paragraph 55 of the Framework.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69604

Derbyniwyd: 21/04/2016

Ymatebydd: Lenco Investments

Asiant : RPS Planning & Development

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Any additional need identified for Coventry should in the first instance be met in locations which are well located to Coventry and options for growth tested on this basis.
Council has not proposed any additional changes to its spatial strategy other than minor amendments to the text. This does not respond to the requirements of Paragraph 182 of the NPPF, which requires that the strategy for growth is justified and effective and capable of delivering sustainable growth. It is considered that as currently drafted, the strategy is unsound

Cefnogi

Proposed Modifications January 2016

ID sylw: 69625

Derbyniwyd: 21/04/2016

Ymatebydd: University of Warwick

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

The University acknowledges the need for the District Council to accommodate some of Coventry's housing requirement in the period to 2029. It recognises that the new sites selected at Kings Hill and Westwood Heath were considered in an earlier consultation in 2009. As long as these sites are planned comprehensively with adequate strategic infrastructure, the University has no objection to them coming forward.

Cefnogi

Proposed Modifications January 2016

ID sylw: 69686

Derbyniwyd: 22/04/2016

Ymatebydd: Gleeson Developments

Asiant : Savills (L&P) Ltd

Crynodeb o'r Gynrychiolaeth:

Policy DS10 identifies sites on the edge of Kenilworth for 1,500 dwellings. This is consistent with the spatial vision and sustainability criteria set out in the NPPF and Local Plan. Gleeson supports the proposed modification as drafted.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69717

Derbyniwyd: 22/04/2016

Ymatebydd: Nurton Developments

Asiant : Chave Planning

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Object; -
- insufficient housing allocated to Kingswood to meet council's locational strategy requirements
- Kingswood scored well in Village Profile and Housing Allocations Paper, which identified a total of 95 dwellings for it.
- only 53 dwellings have been allocated

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69730

Derbyniwyd: 22/04/2016

Ymatebydd: Catesby Estate Ltd & H E Johnson

Asiant : Catesby Property Group

Cydymffurfio â’r gyfraith? Heb nodi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

OMISSION SITE
Release of additional land at Red House Farm accords with spatial strategy in policy DS1, which favours sites on the edge of urban areas over growth in villages and rural areas.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69824

Derbyniwyd: 22/04/2016

Ymatebydd: Bishop's Tachbrook Parish Council

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Revise table

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69841

Derbyniwyd: 22/04/2016

Ymatebydd: Mrs J Mackenzie

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Allocations contrary to NPPF requirement to maintain separation, prevent coalescence
Numbers based on Coventry requirements not approved in local plan, revised before 2017?
No critical examination of claims that land unavailable -areas of Coventry green belt could be developed with less impact
Provision of land to meet Coventry's overspill contrary to NPPF - require sub-regional SA to be valid
How do proposals fit with neighbouring development
No consultation undertaken with parish councils before decisions made
MoU providing additional housing for Combined Authority circumvents democratic process, NPPF
Impact of proposals at Thickthorn and Kings Hill next to over-capacity A46 not considered

Atodiadau:

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69875

Derbyniwyd: 22/04/2016

Ymatebydd: Mr. Robert Davies

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

OMISSION site: -
- site edged red on attached plan can accommodate housing adjoining Radford Semele
- site originally identified in 2014 Village Housing Options
- larger site previously dismissed on appeal but smaller site would be suitable on site identified previously as preferred option for village
- provides choice for future residents

Atodiadau:

Cefnogi

Proposed Modifications January 2016

ID sylw: 69924

Derbyniwyd: 20/04/2016

Ymatebydd: Mr & Mrs Jarrett

Asiant : McLoughlin Planning

Crynodeb o'r Gynrychiolaeth:

Support the proposed changes to Paragraph 2.37 and 2.38. As now drafted, the Policy will allow for housing development on locations adjacent to more sustainable villages. In terms of the SHLAA identifying suitable and available sites, whilst there is no reference to it in the Modifications, there will be a need for routine monitoring of the SHLAA to present an up-to-date picture of site availability.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69982

Derbyniwyd: 22/04/2016

Ymatebydd: The Kler Group

Asiant : Barton Willmore

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Insufficient land is allocated in Burton Green to meet the future needs of the village, particularly in the context of HS2 which could result in a net loss of dwellings.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 69987

Derbyniwyd: 22/04/2016

Ymatebydd: Richard & Janel, Vince & Caroline Hill & McCullagh

Asiant : Turley Associates

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Our client does not support the quantum of development identified as being able to be delivered on greenfield sites on the edge of Coventry. Our client considers that land to the south of Coventry is capable of delivering additional dwellings to help the Council meet its full Objectively Assessed Housing Need and boost significantly the supply of housing.
For further information please refer to our clients response to Mod 14.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 70052

Derbyniwyd: 22/04/2016

Ymatebydd: CPRE WARWICKSHIRE

Cydymffurfio â’r gyfraith? Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

In order to comply with the key characteristics and purposes of the Green Belt, the additional housing proposals on land designated as Green Belt should be the proposed location of housing should be deleted. In particular, the addition of greenfield sites on the southern edge of Coventry would conflict with the purposes of the Green Belt south of Coventry and would cause great harm. Harm would be magnified when cumulative change is properly assessed: the combination of the unjustified sub-regional employment site (Policy DS16) and the excessive housing proposals would devastate the Green Belt south of Coventry, extending the sprawl of Coventry around Baginton towards the villages of Stoneleigh and Bubbenhall which are of historic importance, demonstrated by their being Conservation Areas

The cumulative impact on roads in the area would also be unacceptable. There is no evidence that mooted (Ref Mod 20) road improvements are viable and would resolve the issues.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 70158

Derbyniwyd: 22/04/2016

Ymatebydd: Commercial Estates Group

Asiant : Nexus Planning

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

MoU not agreed to by Nuneaton and Bedworth BC, unmet need figure for Warwick District could potentially increase.
Given significant level of unmet housing needs arising from Coventry, Council should maximise opportunities to locate housing on the edge of Coventry.
Restriction on housing in Westwood Heath related to strategic transport evidence of lack of capacity. Emphasis on Kings Hill in the first instance.
Should consider more equitable distribution between Westwood Heath and Kings Hill.

Gwrthwynebu

Proposed Modifications January 2016

ID sylw: 70277

Derbyniwyd: 20/04/2016

Ymatebydd: Dr. & Mrs. P. & D. Thornton & Vernon et al.

Nifer y bobl: 2

Asiant : Mrl Alasdair, Jones

Cydymffurfio â’r gyfraith? Nac Ydi

Cadarn? Nac Ydi

Dyletswydd i gydweithredu? Heb nodi

Crynodeb o'r Gynrychiolaeth:

Housing capacity of growth villages is greater than the plan allows for and in particular the growth villages close to Coventry can play a greater role in meeting Coventry's needs. The present broad distribution is not the most effective and means there a risks to the delivery of homes over the Plan period. The plan assumes that the allocations in Burton Green and Baginton will deliver new homes in the first 5 years, but beyond 2020/21 the plan does not envisage further development in these villages. The delivery rate for Burrow Hill nursery conflicts with the position in 2015 when it was anticipated the site would not complete until 2026/7 due to HS2. The delivery assumptions show that in 2020/21 the 4 sites closest to Coventry will deliver 355dpa, but after that only 200 dpa from Kings Hill will be achieved, giving an annual shortfall of 227 dpa for Coventry's part of the need. The plan is therefore deficient in providing sites for the demand for new homes for the City. Further it relies on Westwood Heath and Kings Hill being brought forward quickly - previous experience shows this cannot be relied on. Further capacity in growth villages close to Coventry therefore needs to be provided, particularly where these are readily available and deliverable.

Atodiadau: