BASE HEADER

Do you broadly support the proposals in the Meeting South Warwickshire's Sustainable Development Requirements chapter? If you have any additional points to raise with regards to this chapter please include them here.

Yn dangos sylwadau a ffurflenni 91 i 120 o 183

Yes

Preferred Options 2025

ID sylw: 100895

Derbyniwyd: 07/03/2025

Ymatebydd: Rowington Landowner Consortium

Asiant : Knight Frank LLP

Crynodeb o'r Gynrychiolaeth:

The SWLP proposes a spatial growth strategy prioritising urban brownfield sites, strategic greenfield locations, and potential new settlements to meet housing and employment needs sustainably. While this approach aligns with sustainable development principles, further clarity is needed regarding how the SWLP will address unmet housing demands from neighbouring areas, such as Greater Birmingham and the Black Country, to ensure a comprehensive strategy that accommodates both local and regional growth requirements.

Other

Preferred Options 2025

ID sylw: 100947

Derbyniwyd: 07/03/2025

Ymatebydd: Richborough Commercial

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

Richborough Commercial supports the principle of the Priority Areas for Growth, Strategic Growth Options and the identified strategic employment land need, subject to SG08 being expanded to include Land NW of Junction 15 M40 and the strategic employment need being a minimum of 125 ha. Please refer to our complete response for full details.

Other

Preferred Options 2025

ID sylw: 100954

Derbyniwyd: 07/03/2025

Ymatebydd: AC Lloyd

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

AC Lloyd supports the objective of prioritising development within the most sustainable locations.

The plan should be clear that existing commitments will be carried forwards into the new Local Plan. AC Lloyd’s particular interest is allocation H03 (Land East of Whitnash/south of Sydenham). Phase 1 (185 dwellings) has been granted full planning permission (References: W/20/0617 Outline and W/23/1766 Reserved Matters) and is anticipated to start on site during 2025. Phase 2 will follow in due course. The site falls with Priority Area 1 and remains a highly suitable and sustainable location for housing growth.
See full response.

Yes

Preferred Options 2025

ID sylw: 100982

Derbyniwyd: 07/03/2025

Ymatebydd: Old Milverton and Blackdown Parish Council

Crynodeb o'r Gynrychiolaeth:

The land at SG06 represents some of the ‘best and most versatile’ agricultural land in the area. We are pleased that this consultation recognises the plans outlined in A Green Future and argue that, as part of this, the land at SG06 should be preserved as agricultural land.
In addition we draw attention to a year-long study that we commissioned from Worcestershire Wildlife Trust which identified the wide range of wildlife in SG06. Further information on the area’s biodiversity can be found at www.ombparish.org.uk/the-green-belt

Other

Preferred Options 2025

ID sylw: 101089

Derbyniwyd: 07/03/2025

Ymatebydd: AC Lloyd - Sites 64 and 301

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

AC Lloyd supports the objective of prioritising development within the most sustainable locations.
AC Lloyd supports the general approach to identifying Spatial Growth Options in principle. It is noted that the AC Lloyd sites at Southam which include land north of Leamington Road (Site 64) being promoted for residential use and land south of Leamington Road (Site 301) being promoted for employment use fall within the Strategic Growth Option SG12 and this is fully supported as detailed in our response to the proposed Strategic Growth Options.
See full response.

Other

Preferred Options 2025

ID sylw: 101091

Derbyniwyd: 07/03/2025

Ymatebydd: Mr guy evans

Crynodeb o'r Gynrychiolaeth:

Brownfield land Should be used throughout the district. New settlements are a bad idea

Yes

Preferred Options 2025

ID sylw: 101141

Derbyniwyd: 07/03/2025

Ymatebydd: Hallam Land Management Limited

Asiant : Mr Jack Barnes

Crynodeb o'r Gynrychiolaeth:

The Councils will be well aware of the difficulties in relying on new settlements to deliver significant growth from the experiences at Long Marston. There is a need for robust infrastructure and delivery strategies that can demonstrate the Plan is sound. In the absence of any evidence, it is difficult at this stage to conclude that a new settlement should be part of the Plan. The most reliable short to medium-term growth locations are those that are sustainably located adjacent to existing settlements, such as Southam.

Other

Preferred Options 2025

ID sylw: 101222

Derbyniwyd: 07/03/2025

Ymatebydd: Adrian Summers on behalf of the Summers Family

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

There is a need to focus on:

• the level of growth required - housing and employment
• how this should be accommodated, urban/ rural, small, medium and strategic level growth
• a single rather than 2-part plan
• identify and carry out settlement boundary reviews or to establish them where appropriate
• embrace the December 2024 NPPF update especially with regard to Green Belt and the development of Grey Belt sites such as site 517 at Claybank Farm
• embrace infrastructure ‘in the round’
• deploy development to help achieve 20-minute neighbourhoods in urban and rural areas alike

Other

Preferred Options 2025

ID sylw: 101269

Derbyniwyd: 07/03/2025

Ymatebydd: Ettington Estate Ltd

Asiant : Origin3

Crynodeb o'r Gynrychiolaeth:

We have concerns that the Spatial Growth Strategy does not set out a clear picture of how development will be directed to locations across SW effectively, or that the strategy set out will provide a land supply that will meet the need for new homes. We make suggestions as to how the Reg 19 Local Plan could set out a more effective approach.

No

Preferred Options 2025

ID sylw: 101278

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Bart Slob

Crynodeb o'r Gynrychiolaeth:

I do not support the proposals in the Meeting South Warwickshire’s Sustainable Development Requirements chapter. The plan fails to guarantee a brownfield-first approach, risking unjustified Green Belt release, particularly at SG04 (South of Kenilworth), which threatens historic landscapes. Exceptional circumstances have not been demonstrated for Green Belt loss. Additionally, there are no clear commitments to delivering infrastructure—schools, healthcare, and transport—before development proceeds, risking further strain on local services. Sustainable development requires stronger guarantees, prioritising brownfield land first, protecting the Green Belt, and ensuring infrastructure is in place before large-scale housing growth is approved.

Other

Preferred Options 2025

ID sylw: 101379

Derbyniwyd: 07/03/2025

Ymatebydd: Webb Family

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

The Webb family supports the principles of the Priority Areas, but note that the current part-allocation of Site 180 should be carried forward to the new SWLP and that the remainder of the site should also be allocated. Please refer to our complete response for full details.

Other

Preferred Options 2025

ID sylw: 101434

Derbyniwyd: 07/03/2025

Ymatebydd: AC Lloyd - Site 165

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

AC Lloyd supports the objective of prioritising development within the most sustainable locations. AC Lloyd supports the general approach to identifying Spatial Growth Options in principle. SG06 includes AC Lloyd sites at land off Bamburgh Grove (reference no. 165). As the new Standard Method is in place this must now be applied and the plan must accommodate the higher housing figure (54,450 dwellings) for the plan period. In addition, any housing needs that cannot be met within neighbouring planning authority areas should also be taken into account in establishing the amount of housing to be planned for. See full response.

No

Preferred Options 2025

ID sylw: 101536

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Vincent Rollason

Crynodeb o'r Gynrychiolaeth:

This development is not good for the area

Other

Preferred Options 2025

ID sylw: 101898

Derbyniwyd: 07/03/2025

Ymatebydd: Grevayne Properties Limited

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

There is a need to focus on:

• the level of growth - housing and employment
• how this should be accommodated, urban/ rural, small, medium and strategic level growth
• a single rather than 2-part plan
• identify and carry out settlement boundary reviews
• embrace the December 2024 NPPF update especially with regard to Green Belt and the development of Grey Belt sites such as site Ref: 490 at Baddesley Clinton.
• embrace infrastructure ‘in the round’
• deploy development to help achieve 20-minute neighbourhoods in urban and rural areas, such as Baddesley Clinton and Harbury.

No

Preferred Options 2025

ID sylw: 101954

Derbyniwyd: 07/03/2025

Ymatebydd: Bishop's Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

The 2022 Sustainability Appraisal’s (SA) references to Bishop’s Tachbrook contains significant errors, including failure to identify the Country Park, ancient woodland and the village’s Conservation Area. Coalescence impact is underestimated, and the village is incorrectly placed outside a secondary school catchment despite Oakley School. The methodology for landscape sensitivity assessment is flawed, relying only on Appendix 7 of the Warwick District Council study, which does not cover Bishop’s Tachbrook. The full report should be used for reassessment. These errors must be corrected in revised documentation before the Regulation 19 plan is published to ensure accuracy and soundness.

No

Preferred Options 2025

ID sylw: 102101

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Philip Alton

Crynodeb o'r Gynrychiolaeth:

The Council has not taken on board the wishes of residents in drawing up its draft proposals. Residents are universally opposed to them on grounds of destruction of environment, inconvenience, strains on infrastructure and the transport system in particular. The Council has wrongly applied planning criteria in preparing the proposals. It sees green belt as a challenge to be overcome and the receipt of CILS payments as a driver for development. It is a mattter which is potentially the basis for a judicial review together with referrals to the Local Government Ombudsman.

Other

Preferred Options 2025

ID sylw: 102119

Derbyniwyd: 07/03/2025

Ymatebydd: IM Land 1 Limited

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

55. IM Land broadly supports the proposals subject to the amendments to Draft Policy Directions 1, 4, 5,7 and 8 and consideration of our comments on the HELAA results.

Yes

Preferred Options 2025

ID sylw: 102130

Derbyniwyd: 07/03/2025

Ymatebydd: BDW Trading Limited

Asiant : Knight Frank LLP

Crynodeb o'r Gynrychiolaeth:

The SWLP proposes a spatial growth strategy prioritising urban brownfield sites, strategic greenfield locations, and potential new settlements to meet housing and employment needs sustainably. While this approach aligns with sustainable development principles, further clarity is needed regarding how the SWLP will address unmet housing demands from neighbouring areas, such as Greater Birmingham and the Black Country, to ensure a comprehensive strategy that accommodates both local and regional growth requirements.

Other

Preferred Options 2025

ID sylw: 102247

Derbyniwyd: 07/03/2025

Ymatebydd: Taylor Wimpey Strategic Land

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

Further detail is required within the next iteration of the SWLP in order to fully support the proposals in ‘Meeting South Warwickshire’s Sustainable Development Requirements’ chapter. However, at this stage Taylor Wimpey are able to broadly support the direction of travel and request that Warwick District Council engage with interested parties over the next 12 months to enable them to provide the additional level of detail and evidence to support the regulation 19 version of the SWLP.

No

Preferred Options 2025

ID sylw: 102562

Derbyniwyd: 07/03/2025

Ymatebydd: Carl Barthorpe

Crynodeb o'r Gynrychiolaeth:

No I dont agree, sustainable and similar words are thrown around as lip service, builders are given permission to destroy an unnecessary number of trees, hedrows, fill in ponds turn brooks into drainage.

Need to protect the wildlife not pay lip service to it.

Other

Preferred Options 2025

ID sylw: 102565

Derbyniwyd: 07/03/2025

Ymatebydd: Deeley Homes Dean Weldon

Crynodeb o'r Gynrychiolaeth:

General support with additional flexibility for development to come forward in other sustainable locations across the district if a need can be identified.

Yes

Preferred Options 2025

ID sylw: 102582

Derbyniwyd: 07/03/2025

Ymatebydd: Jaguar Land Rover

Asiant : Marrons

Crynodeb o'r Gynrychiolaeth:

JLR broadly support the proposals, and in particular the Spatial Growth Strategy Priority Areas.

Land at Honiley Road, Fen End is identified within Priority Area 1. This is welcomed and supported by JLR. Fen End is strategically important to the business, and is currently used for Vehicle testing, research and development and retailer network training.

In moving forward, JLR need to have more certainty around what it can and cannot do at Fen End from a planning policy perspective in order to inform its business decisions on where and when to invest.

Other

Preferred Options 2025

ID sylw: 102726

Derbyniwyd: 07/03/2025

Ymatebydd: Deeley Homes Dean Weldon

Crynodeb o'r Gynrychiolaeth:

A need for additional flexibility to be built into the delivery of new housing.

Other

Preferred Options 2025

ID sylw: 102828

Derbyniwyd: 07/03/2025

Ymatebydd: Summers Holdings Ltd

Asiant : The Tyler Parkes Partnership Ltd

Crynodeb o'r Gynrychiolaeth:

The planning process seems to have run into various cul-de-sacs. There is a need to focus on:

• the level of growth required - housing and employment
• how this should be accommodated, urban/ rural, small, medium and strategic level growth including a possible new settlement(s)
• a single rather than 2-part plan
• settlement boundary reviews or establish where appropriate
• embrace updated NPPF especially with regard to Green Belt and Grey Belt
• embrace infrastructure ‘in the round’
• deploy development to help achieve 20-minute neighbourhoods in all areas.

Other

Preferred Options 2025

ID sylw: 102951

Derbyniwyd: 07/03/2025

Ymatebydd: Deeley Homes

Asiant : Delta Planning

Crynodeb o'r Gynrychiolaeth:

Deeley Homes supports the objective of developing in the most sustainable locations however considers that Long Itchington has been omitted, for the reasons set out within the full response, and should be considered as a Priority Area.

Deeley Homes are promoting Land North of Leamington Road, Long Itchington (Ref. 437) for residential uses which represents a sustainable location and can come forward in isolation or as part of a wider scheme (with Site Refs. 446 and 462).

The SWLP should use the new Standard Method housing figure as a minimum.

Please refer to full response for further details.

Other

Preferred Options 2025

ID sylw: 102963

Derbyniwyd: 07/03/2025

Ymatebydd: Deeley Homes Dean Weldon

Crynodeb o'r Gynrychiolaeth:

Deeley Homes supports South Warwickshire’s objective of developing in the most sustainable locations. The identification of Priority Areas for Growth, in principle, provides a good mechanism for identifying sites that are within suitable distance to settlements and have sufficient sustainable/public transport connections. However, Deeley Homes strongly objects to the implication that development would not be supported in other smaller settlements across the district. An element of flexibility should be incorporated into the policy to allow development sites to come forward in areas not specifically identified for growth, on occasions where specific local or district-wide needs can be identified.
Deeley Homes are promoting Land East of Kineton Road, Pillerton Priors (Site Ref 820) which has been included within the draft Site Allocations Plan (SAP) as a Reserve Housing Allocation. This confirms the acceptance in principle of this location for development, and it should therefore be included either as an Area for Growth or as a Small Site allocation.

No

Preferred Options 2025

ID sylw: 103013

Derbyniwyd: 07/03/2025

Ymatebydd: Mr Howard Easton

Crynodeb o'r Gynrychiolaeth:

The maps don't show HS2! The proposals destroy prime agricultural land, which the country needs to feed itself! The impact in the environment will catastrophic! The West Midlands and Warwickshire currently have the most congested roads nationally. The environmental damage will effect all human and wildlife. Finally, this plan is for 50 years. WDC, WCC won't be here in less than 3 years!!!! As I say, this is madness. Protect England's "green and pleasant" land. Don't cover it with concrete.

No

Preferred Options 2025

ID sylw: 103213

Derbyniwyd: 07/03/2025

Ymatebydd: Chesterton and Kingston Parish Meeting

Crynodeb o'r Gynrychiolaeth:

As stated brownfield Urban land in Coventry and West Midlands should be the focus and not South Warwickshire

Other

Preferred Options 2025

ID sylw: 103230

Derbyniwyd: 07/03/2025

Ymatebydd: Richborough - Salford Road, Bidford-on-Avon

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

Richborough generally support the overall approach to the Meeting South Warwickshire’s Sustainable Development Requirements chapter, however in order to fully respond and therefore fully support the proposals, a significant amount of additional detail is required.

Other

Preferred Options 2025

ID sylw: 103233

Derbyniwyd: 07/03/2025

Ymatebydd: Richborough - Gaydon Road, Bishop's Itchington

Asiant : Turley

Crynodeb o'r Gynrychiolaeth:

Richborough generally support the overall approach to the Meeting South Warwickshire’s Sustainable Development Requirements chapter, however in order to fully respond and therefore fully support the proposals, a significant amount of additional detail is required.