BASE HEADER
Preferred Options 2025
Chwilio sylwadau
Canlyniadau chwilio Shipston Town Council
Chwilio o’r newyddYes
Preferred Options 2025
Do you broadly support the proposals in the A Healthy, Safe, and Inclusive South Warwickshire chapter? If you have any additional points to raise with regards to this chapter please include them here.
ID sylw: 96546
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Agree
Yes
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy Direction-30- Health Impact Assessment for Major Development?
ID sylw: 96547
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Yes, however a definition of what constitutes a major development that triggers a Health Impact Assessment Screening Report should be included.
Yes
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy Direction-29-Pollution?
ID sylw: 96548
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Agree
Yes
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy Direction- 28- Waterways?
ID sylw: 96549
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Agree
Yes
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy Direction-26- Design Codes?
ID sylw: 96550
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Agree
Yes
Preferred Options 2025
Do you broadly support the proposals in the A Climate Resilient and Net Zero Carbon South Warwickshire chapter? If you have any additional points to raise with regards to this chapter please include them here.
ID sylw: 96551
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Yes with the exception of sections 7.3, 7.4, 7.9, 7.10 and 7.11 which it is considered could be strengthened as commented on each section to protect existing development
Other
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy- K- Multifunctional Sustainable Drainage Systems (SuDS)?
ID sylw: 96552
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
There are a number of recent SuDs installations which have been designed to be off-line and should only start to fill once a maximum flow in the site’s surface water network exceeds a threshold. Even in high rainfall periods these SuDs installations have not filled. Apart from the need to check that they have been built correctly consideration should be given to making all SuDs installations on-line.
Other
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy- J- Reducing Flood Risk?
ID sylw: 96553
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
A definition is required for what constitutes a ‘major’ development within the policy. There needs to be a minimum number of dwellings specified for a Flood Risk Assessment to be required – small developments can cause flood issues to their neighbours and downstream if poorly designed. All development needs to demonstrate that they will not impact on existing development between them and the main rivers regardless of whether the proposed and existing development is within a flood risk area.
Yes
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy-H- Water Efficiency?
ID sylw: 96554
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Agree
Yes
Preferred Options 2025
Do you agree with the approach laid out in Draft Policy G- Climate Resilient Design?
ID sylw: 96555
Derbyniwyd: 05/03/2025
Ymatebydd: Shipston Town Council
Agree