Yes
Preferred Options 2025
Representation ID: 90438
Received: 23/02/2025
Respondent: Mrs Sheetal Tailor
no comments
Yes
Preferred Options 2025
Representation ID: 90488
Received: 23/02/2025
Respondent: Jayne Jones
I agree- but no consideration for how those in rural areas (SG17) can get to these areas
Yes
Preferred Options 2025
Representation ID: 90521
Received: 23/02/2025
Respondent: Jason Lupton
I agree with these sites, providing adequate infrastructure is included with the proposals - this includes; cycle, pedestrian, rail, bus connections as the priority with other vehicles secondary to this.
Yes
Preferred Options 2025
Representation ID: 90549
Received: 24/02/2025
Respondent: Mr Gavin Simpson
Growth is to be encouraged to provide for the local community and benefit residents by invetsment in infrastructure projects which is current woefully poor
No
Preferred Options 2025
Representation ID: 90578
Received: 24/02/2025
Respondent: Mr Terry Simmonds
As with all the employment policies, the far South of South Warwickshire is neglected.
Spread the Major Investment sites out more fairly
Yes
Preferred Options 2025
Representation ID: 90731
Received: 24/02/2025
Respondent: Mr Tim Goodwin
It is obvious and sensible to focus new house building adjacent to Major Investment Sites that are most likely to provide the shortest commutes to work opportunities, reducing traffic, journey times and associated negative environmental impacts.
Yes
Preferred Options 2025
Representation ID: 90845
Received: 24/02/2025
Respondent: Malcolm Fisk
I agree
Yes
Preferred Options 2025
Representation ID: 90863
Received: 24/02/2025
Respondent: Mr James Morris
Major Investment Sites are so designated due to the opportunities and growth that are present within them. As a former employee of the University of Warwick, for example, I am all too aware of the expansion plans and desires of those within the University and the good that such expansion and investment would do.
Yes
Preferred Options 2025
Representation ID: 91153
Received: 25/02/2025
Respondent: Radford Semele Parish Council
Radford Semele Parish Council agree with the suggestions.
Yes
Preferred Options 2025
Representation ID: 91163
Received: 25/02/2025
Respondent: Mrs liz jackson
yes, for those outside the greenbelt
Yes
Preferred Options 2025
Representation ID: 91260
Received: 25/02/2025
Respondent: Mr Geoff Norman
Sensible
Yes
Preferred Options 2025
Representation ID: 91512
Received: 26/02/2025
Respondent: Mrs Donna Goodwin
Where new builds are located next to Major Investment Sites, they are the most likely to provide the shortest commutes to work opportunities, reducing traffic, journey times and associated negative environmental impacts. It is obvious and sensible to focus new house building adjacent to these sites.
No
Preferred Options 2025
Representation ID: 91952
Received: 27/02/2025
Respondent: Mr Christopher Priestman
The development of major investment sites at Long Marston Airfield (MIS.2) and Long Marston Rail Innovation Centre (MIS.3) should be made dependent on the improvement of highway infrastructure in the local area and to and around Stratford.
Improvements will be needed to Station Road to provide access to the Rail Innovation Centre and new housing development.
Employment land and a local centre and town centre uses at the Long Marston Airfield site as previously approved is supported.
Other
Preferred Options 2025
Representation ID: 91968
Received: 27/02/2025
Respondent: Wellesbourne and Walton Parish Council
On page 79 MIS.8/MIS.9 there appears to be a lack of synergy with the plan identified in MIS8 and MIS 9 on page 81 to develop the sites of the campus and the airfield to be mutually beneficial with the idea of further industrial development of storage on the airfield site. It also is not fully compatible with Draft Policy Direction 16- Airfields. Wellesbourne Airfield second bullet point. Airfield related development.
We agree that linking MIS8 and MIS9 would have additional benefits in the creation of high value employment opportunities at the airfield site.
Yes
Preferred Options 2025
Representation ID: 92120
Received: 27/02/2025
Respondent: General Aviation Awareness Council and Airfield Operators Group
The identification of MIS9 and linkages to MIS8 is entirely in line with the best approach to medium-long term economic development and the protection of Wellesbourne Airfield to support this initiative is evidence of the highly competent strategic planning needed and proposed for South Warwickshire.
MIS7 is similarly supported and more information is attached.
Whilst fully protecting its aviation activities and infrastructure, Wellesbourne Airfield has the potential to accommodate further research and related facilities that would support the University of Warwick’s Wellesbourne Campus and businesses in the area.
Yes
Preferred Options 2025
Representation ID: 92213
Received: 27/02/2025
Respondent: Ms Isobel McLauchlin
yes, utilising these sites is far preferable.
Yes
Preferred Options 2025
Representation ID: 92378
Received: 28/02/2025
Respondent: Julian Brown
Agree
Yes
Preferred Options 2025
Representation ID: 92418
Received: 28/02/2025
Respondent: Ms Christine Slaughter
Less of a negative impact on existing communities.
No
Preferred Options 2025
Representation ID: 92594
Received: 28/02/2025
Respondent: Bex Thomson
Do not agree with any building or business development on green belt
Yes
Preferred Options 2025
Representation ID: 92810
Received: 01/03/2025
Respondent: Mrs Carolyn Stacey
More long term sustainability
Yes
Preferred Options 2025
Representation ID: 92824
Received: 01/03/2025
Respondent: Mr JAMES STEWART
I agree with this policy
Other
Preferred Options 2025
Representation ID: 92899
Received: 01/03/2025
Respondent: Meon Vale Residents Association
The development of major investment sites at Long Marston Airfield (MIS.2) and Long Marston Rail Innovation Centre (MIS.3) should be made dependent on the improvement of highway infrastructure in the local area and to and around Stratford.
Improvements will be needed to Station Road to provide access to the Rail Innovation Centre and new housing development.
We welcome further dedicated employment land and a local centre and town centre uses at the Long Marston Airfield site.
Yes
Preferred Options 2025
Representation ID: 92937
Received: 01/03/2025
Respondent: Ms Alison Blake
I would support Wellesbourne Airfield being developed for research and technology. What it doesn't need is more logistics warehousing, there are vast numbers of lorries arriving and departing already
Yes
Preferred Options 2025
Representation ID: 92978
Received: 01/03/2025
Respondent: Mr Dominic Momcilovic
I agree
Yes
Preferred Options 2025
Representation ID: 93086
Received: 01/03/2025
Respondent: Ms Martina Hunt
I agree with the potential MIS sites laid out for economic development.
Yes
Preferred Options 2025
Representation ID: 93174
Received: 01/03/2025
Respondent: Mr Gordon Sharp
Major investment sites are essential to the financial well being of the area
Yes
Preferred Options 2025
Representation ID: 93217
Received: 01/03/2025
Respondent: Mr Kim Salmon
The release of 100ha from JLR appears plausible for reallocation recognising the development designation in place saving the need to look for other virgin land in the area. However,J12 appears to have attracted greater volumes than expected with traffic from local roads towards the junction. Poor transport integration remains challenging, the strategy should be to align freight over rail and utilisation of the DIRFT Hub and exploit land opportunities closer to the hub and Coventry Airport.
Yes
Preferred Options 2025
Representation ID: 93292
Received: 02/03/2025
Respondent: Mrs MEGHNA BELSHAW
The development of major investment sites at Long Marston Airfield (MIS.2) and Long Marston Rail Innovation Centre (MIS.3) should be made dependent on the improvement of highway infrastructure in the local area and to and around Stratford.
Improvements will be needed to Station Road to provide access to the Rail Innovation Centre and new housing development.
Employment land and a local centre and town centre uses at the Long Marston Airfield site as previously approved is supported.
No
Preferred Options 2025
Representation ID: 93346
Received: 02/03/2025
Respondent: Cllr David Armstrong
MIS.7 - UW main campus. While the site should be understood and in general developed with the SPD, further development in the south of the site erodes the Green Belt between Coventry and Kenilworth and should not be explored. The University of Warwick plans to create an EcoPark in this region, which would provide vital green infrastructure and safeguard part of the Green Belt, and a link road as stated would cut that EcoPark in two.
Other
Preferred Options 2025
Representation ID: 93586
Received: 02/03/2025
Respondent: Mrs Shelagh Marshall
The approach should be highly disciplined to avoid the loss of productive agricultural land. Maximum use should be taken of brown field sites and redevelopment of existing sites.