BASE HEADER

Strategic Growth Location SG09 Question

Yn dangos sylwadau a ffurflenni 1 i 30 o 165

Yes

Preferred Options 2025

ID sylw: 86196

Derbyniwyd: 15/01/2025

Ymatebydd: Professor Paul Bywaters

Crynodeb o'r Gynrychiolaeth:

.

No

Preferred Options 2025

ID sylw: 86229

Derbyniwyd: 16/01/2025

Ymatebydd: Ms Alice Hobson

Crynodeb o'r Gynrychiolaeth:

The Europa Way developments already look so depressing and there's nothing for anyone to do there. Focus on building amenities for these communities before building more houses.

Yes

Preferred Options 2025

ID sylw: 86234

Derbyniwyd: 17/01/2025

Ymatebydd: Mr Mark Brightburn

Crynodeb o'r Gynrychiolaeth:

Subject to careful thought on infrastructure, not just more and more housing, or this becomes a car-based location, highly unsustainable. Need the bus and cycle routes with FULL connectivity to town centres and facilities. Need local centres with local provision in walking distance. Developers should not be allowed to only deliver the housing. The character of these places could also be dramatically improved. Current 'anywhere'. Same standard housebuilder boxes. Needs a lot more effort to make it 'Leamington/Warwick' specific. Add character as a key requirement in place-making.

Yes

Preferred Options 2025

ID sylw: 86265

Derbyniwyd: 18/01/2025

Ymatebydd: Ms Ruth Buckley

Crynodeb o'r Gynrychiolaeth:

Yes, provided that no green belt land is used and that adequate services are provided.

Yes

Preferred Options 2025

ID sylw: 86344

Derbyniwyd: 21/01/2025

Ymatebydd: Mr Noel Davis

Crynodeb o'r Gynrychiolaeth:

na

No

Preferred Options 2025

ID sylw: 86540

Derbyniwyd: 28/01/2025

Ymatebydd: Mr Rory Hawkins

Crynodeb o'r Gynrychiolaeth:

Leamington and the surrounding areas simply don't have the road infrastructure to cope with additional housing so close to the town centre. A significant amount of housing has already been added in the south of Leamington/Warwick which has caused a significant increase in congestion in getting in/out/around the the local area during peak hours/weekends. Given the location of the M40, getting in/out of south Leamington is already quite challenging at those time as well, without adding more traffic. New housing would be better suited in new the new settlement format where it won't add to the already overloaded infrastructure.

Yes

Preferred Options 2025

ID sylw: 86556

Derbyniwyd: 28/01/2025

Ymatebydd: Mr Peter Bridgewater

Crynodeb o'r Gynrychiolaeth:

Reduces travel time and pollution by keeping development to the borders of already developed areas.

Yes

Preferred Options 2025

ID sylw: 86769

Derbyniwyd: 29/01/2025

Ymatebydd: Mr russell gillott

Crynodeb o'r Gynrychiolaeth:

already considerable developments and infrastructure there.

Yes

Preferred Options 2025

ID sylw: 87035

Derbyniwyd: 03/02/2025

Ymatebydd: Mrs Judith Corless

Crynodeb o'r Gynrychiolaeth:

this area has had a large amount of housing built within the last few years. It has excellent links to major roads. It probably needs a consolidation period but new housing could be located here in the future with careful planning.

Yes

Preferred Options 2025

ID sylw: 87342

Derbyniwyd: 08/02/2025

Ymatebydd: Cllr Andrew Day

Crynodeb o'r Gynrychiolaeth:

Provided there is a new M40 junction and the mix of employment use provides for a diverse range of needs, not just distribution sheds.

No

Preferred Options 2025

ID sylw: 87478

Derbyniwyd: 09/02/2025

Ymatebydd: John Murphy

Crynodeb o'r Gynrychiolaeth:

This is too much like uncontrolled urban sprawl - development should be contained N of A41 and M40 - if it carries on like this it will eventually merge with Newbold Pacey and Wellesbourne...

Yes

Preferred Options 2025

ID sylw: 87497

Derbyniwyd: 09/02/2025

Ymatebydd: mrs susan morris

Crynodeb o'r Gynrychiolaeth:

Land here is the correct size of leamington for the supermarkets, train station and motorway links.

No

Preferred Options 2025

ID sylw: 87524

Derbyniwyd: 09/02/2025

Ymatebydd: Michaelina Jakala

Crynodeb o'r Gynrychiolaeth:

I do not support - too much development with too little infrastructure.

No

Preferred Options 2025

ID sylw: 87640

Derbyniwyd: 09/02/2025

Ymatebydd: Mr Richard Grey

Crynodeb o'r Gynrychiolaeth:

This proposal represents urban sprawl at its worse and removes good qualuty agricultural land and open space in an area that has already suffered much loss around a historic county town. There is also poor access ti the motorway travelling from the south putting unnecessay pressure on the Banbury Road

No

Preferred Options 2025

ID sylw: 87805

Derbyniwyd: 11/02/2025

Ymatebydd: Mrs Emily Godson

Crynodeb o'r Gynrychiolaeth:

The existing developments in this area have already caused significant disruption and highlighted the lack of community infrastructure. It has placed an immense strain on routes into both Warwick and Leamington because the 'in town' areas are unable to adapt to the increase in traffic. Traffic flows are awful (and will continue to be even after the 'improvements'), particularly around Princes Drive, Emscote Road and Myton Road, not to mention traffic up Europa Way.

No

Preferred Options 2025

ID sylw: 87869

Derbyniwyd: 11/02/2025

Ymatebydd: Sam Walton

Crynodeb o'r Gynrychiolaeth:

If possible a new junction should be considered in this area to combine J13 and J14, as the distance to/from J15 is too short, and traffic is a serious problem in this area already.

Yes

Preferred Options 2025

ID sylw: 87985

Derbyniwyd: 13/02/2025

Ymatebydd: Mrs Sharon Quantrill

Crynodeb o'r Gynrychiolaeth:

Part of an urban area

Yes

Preferred Options 2025

ID sylw: 87989

Derbyniwyd: 13/02/2025

Ymatebydd: Mrs Sharon Quantrill

Crynodeb o'r Gynrychiolaeth:

Not in greenbelt

Yes

Preferred Options 2025

ID sylw: 87990

Derbyniwyd: 13/02/2025

Ymatebydd: Mr Simon Quantrill

Crynodeb o'r Gynrychiolaeth:

Yes as urban

Yes

Preferred Options 2025

ID sylw: 88071

Derbyniwyd: 13/02/2025

Ymatebydd: Mrs vivien bryer

Crynodeb o'r Gynrychiolaeth:

not in greenbelt

No

Preferred Options 2025

ID sylw: 88135

Derbyniwyd: 13/02/2025

Ymatebydd: Mrs Anne Parry

Crynodeb o'r Gynrychiolaeth:

Significant harm to the character of the landscape and increasing traffic congestion to Warwick and Leamington Spa plus the M40 - further urbanisation of the area.

No

Preferred Options 2025

ID sylw: 88169

Derbyniwyd: 14/02/2025

Ymatebydd: Mrs Rozanne Harris

Crynodeb o'r Gynrychiolaeth:

Although SG09 benefits from being close to the main road network it is already a nightmare to travel into Leamington this way. This has only become more difficult with the ongoing new build locations on the south of Leam. Its a no go driving area at peak times.

Yes

Preferred Options 2025

ID sylw: 88241

Derbyniwyd: 14/02/2025

Ymatebydd: Mrs Ida Marjorie Brown

Crynodeb o'r Gynrychiolaeth:

Positive transport links will require further road improvements but Leamington and Warwick is a sought after location but this should only go to the Europa Way Island meets the A452 - the boundary.

No

Preferred Options 2025

ID sylw: 88270

Derbyniwyd: 10/02/2025

Ymatebydd: Juliet Bates

Crynodeb o'r Gynrychiolaeth:

I am concerned about the proposals for new settlements and industries near the M40 in Waspington and Barford. There has been insufficient consideration for the necessary facilities to support the increased population and traffic. As a nurse at Warwick Hospital, I see how services are already overwhelmed, with a lack of beds and GP appointments leading to more A&E visits. Local emergency services are also underfunded. I believe it is crucial to develop infrastructure for current residents and businesses before expanding further. I cannot support these developments until proper infrastructure is in place.

Yes

Preferred Options 2025

ID sylw: 88624

Derbyniwyd: 17/02/2025

Ymatebydd: Mr Jerry Corless

Crynodeb o'r Gynrychiolaeth:

N/A

Yes

Preferred Options 2025

ID sylw: 88687

Derbyniwyd: 17/02/2025

Ymatebydd: Mrs Gillian Browne

Crynodeb o'r Gynrychiolaeth:

This land is not designated green belt land and links to existing settlements.

Yes

Preferred Options 2025

ID sylw: 89036

Derbyniwyd: 19/02/2025

Ymatebydd: Mrs Sara Bird

Crynodeb o'r Gynrychiolaeth:

Good access to existing infrastructure and transport options

Yes

Preferred Options 2025

ID sylw: 89519

Derbyniwyd: 20/02/2025

Ymatebydd: Miss Emily Carleton

Crynodeb o'r Gynrychiolaeth:

Non green belt land, so go crazy, build as many houses as you'd like.

Yes

Preferred Options 2025

ID sylw: 90104

Derbyniwyd: 22/02/2025

Ymatebydd: Mr Richard Hewitt

Crynodeb o'r Gynrychiolaeth:

Support

Yes

Preferred Options 2025

ID sylw: 90174

Derbyniwyd: 23/02/2025

Ymatebydd: Mr Simon Fox

Crynodeb o'r Gynrychiolaeth:

Potential with other prior development in the area to become a self sustaining community, but also with immediate and easy access to the M40 corridor, which offers potential for both Commerce and commuters.
With improved local bus services could provide easy access to main line Leamington station offering multiple alternate destinations, including fast services to London.