BASE HEADER

Strategic Growth Location SG14 Question

Yn dangos sylwadau a ffurflenni 91 i 120 o 203

Other

Preferred Options 2025

ID sylw: 94729

Derbyniwyd: 03/03/2025

Ymatebydd: David Gosling

Crynodeb o'r Gynrychiolaeth:

We have insufficient knowledge of this location from which to make an informed comment

Yes

Preferred Options 2025

ID sylw: 94752

Derbyniwyd: 03/03/2025

Ymatebydd: Stratford-upon-Avon Town Transport Group

Crynodeb o'r Gynrychiolaeth:

We suggest a new settlement between the M40 and Chiltern Rail Line. This location would include a hotel, major high tech employment within the M40 employment corridor, and provide the most sustainable connectivity. Expansion of Warwick University onto this new settlement would provide a further anchor employment.

Further, a substantial well designed new settlement at this location would accord with the expected recommendations from the Sir Michael Lyons New Settlement Task Force expected in the summer.

Yes

Preferred Options 2025

ID sylw: 95123

Derbyniwyd: 03/03/2025

Ymatebydd: Mr Jonathan Stafford-scott

Crynodeb o'r Gynrychiolaeth:

This site will offer good job opportunities nearby which will support local communities as well as having good existing road connections. The development will improve transport links including potential from new stations and links to key commenting areas.
New settlements can be driven by strategic opportunities not land availability to limit impact on the local ecology.
The site would take the congestion pressure off Stratford and meet all housing needs with least impact on the environment, preserving greenbelt land.

Yes

Preferred Options 2025

ID sylw: 95236

Derbyniwyd: 04/03/2025

Ymatebydd: Mr Lee Tallen

Crynodeb o'r Gynrychiolaeth:

As per previous answer, development of new settlement can be designed around an infrastructure that is fit for the area and ensure due consideration of ecological/open space/recreational needs. It would also foster a new community rather than negatively impacting existing settlements. It could be planned out much more logically and strategically which feels like a better approach than just crow-barring a high volume of houses in wherever you can.

Yes

Preferred Options 2025

ID sylw: 95428

Derbyniwyd: 04/03/2025

Ymatebydd: Mrs Hannah Molloy

Crynodeb o'r Gynrychiolaeth:

Good to expand around JLR on non-Green Belt land

Yes

Preferred Options 2025

ID sylw: 95435

Derbyniwyd: 04/03/2025

Ymatebydd: Mr Barrie Goodman

Crynodeb o'r Gynrychiolaeth:

Good potential for employment. Good existing and potential new road/rail network. Potential to ease congestion in Stratford. using this site would also avoid urban sprawl which strains existing infrastructure.

No

Preferred Options 2025

ID sylw: 95545

Derbyniwyd: 04/03/2025

Ymatebydd: Mr Gordon Ashley

Crynodeb o'r Gynrychiolaeth:

This is over development of Gaydon area. landscape is becoming urbanized & views from Burton Dassett park will be spoilt. No rail links. Road infrastructure is insufficient already. Volumes of traffic using local roads is already too high particularly at peak hours for AM & JLR. These sites should be focused on Warwick & Leamington area which are now one conurdation

Yes

Preferred Options 2025

ID sylw: 95561

Derbyniwyd: 04/03/2025

Ymatebydd: Mr Ian Clarke

Crynodeb o'r Gynrychiolaeth:

Development in this location is adjacent to pre-existing development and does not undermine green belt policy that has served the country well for many years. It is accessible to the M40.

No

Preferred Options 2025

ID sylw: 95586

Derbyniwyd: 04/03/2025

Ymatebydd: Bishops Itchington Parish Council

Crynodeb o'r Gynrychiolaeth:

Development at this site will destroy the landscape character of Burton Dassett Country Park - an AONB.
Traffic safety concerns on B4451
Unnecessary as SG13 has spare capacity.
Further info on attachment - please see section on SG14

No

Preferred Options 2025

ID sylw: 95798

Derbyniwyd: 04/03/2025

Ymatebydd: Stratford upon Avon District Council

Crynodeb o'r Gynrychiolaeth:

I do not agree with this cluster being included in the plan. The sites within the cluster perform very badly on the objective scoring system and should be eliminated. In detail, the reasons are primarily that it is not in conformance with Strategic Objectives of the SWLP, with which I broadly agree.

Yes

Preferred Options 2025

ID sylw: 95813

Derbyniwyd: 04/03/2025

Ymatebydd: Mrs Jane Dodge

Crynodeb o'r Gynrychiolaeth:

SG14 should be considered a suitable parcel of land amalgamated with G1, F3 and SG13 to create a new settlement.
Gaydon already has high quality employment and transport infrastructure, including the possibility of a railway station on the existing line.

No

Preferred Options 2025

ID sylw: 96065

Derbyniwyd: 04/03/2025

Ymatebydd: Mrs Christine Sheen

Crynodeb o'r Gynrychiolaeth:

The proposed SG14 industrial development in South Warwickshire would significantly harm biodiversity, heritage sites, and the rural landscape. It threatens ancient woodlands, archaeological sites, and the community at Lower and Upper Spring Farms. The development would cause noise, pollution, and flooding and strain local infrastructure, which is insufficient to support such a large-scale project. The area’s environmental and historical value, including rare wildlife, historic routes, and medieval fields, would be lost. The SG14 site lacks integrated public transport, making it highly dependent on private vehicles. The B4451 is currently operating beyond its capacity, already experiencing excessive traffic congestion.

Yes

Preferred Options 2025

ID sylw: 96228

Derbyniwyd: 04/03/2025

Ymatebydd: Mr James Pateman

Crynodeb o'r Gynrychiolaeth:

Build housing on non-greenbelt land.

No

Preferred Options 2025

ID sylw: 96307

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Matthew Burns

Crynodeb o'r Gynrychiolaeth:

This land is green land, please use all brownfield sites in south warwickshire before we build on green land causing environmental harm. Also if this site and all your proposed new settlement sites bishops itchington will be turned into a major thoroughfare running the character of the local community

Yes

Preferred Options 2025

ID sylw: 96560

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Colin Stewart

Crynodeb o'r Gynrychiolaeth:

There is an excellent opportunity to create a 10,000 home New Settlement in approximately this location, spanning between the M40 and Chiltern Rail Line, with excellent existing and future high value employment, which could tick all the new settlement boxes in accordance with expected government task force guidance. It would benefit from some of the best transport links once HS2 opens in 2033, the released capacity allowing for stopping at a new station on the site. It could be an envious place to live - homes, jobs, and a community, with the shortest travel times to London in South Warwickshire.

Other

Preferred Options 2025

ID sylw: 96755

Derbyniwyd: 05/03/2025

Ymatebydd: Alcester Town Council

Crynodeb o'r Gynrychiolaeth:

Alcester Town Council, Arrow with Weethley Parish Council, Kinwarton Parish Council, Wixford Parish Council and Great Alne Parish Council (together referred to as Alcester Parishes Group or ‘APG’) has no comment.

Yes

Preferred Options 2025

ID sylw: 96887

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Margaret Jeffery

Crynodeb o'r Gynrychiolaeth:

Close to M40 so good road links

Yes

Preferred Options 2025

ID sylw: 97011

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Emily Morris

Crynodeb o'r Gynrychiolaeth:

Better location for commuting links, rail expansion.

Yes

Preferred Options 2025

ID sylw: 97311

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Guy Morris

Crynodeb o'r Gynrychiolaeth:

Better road connections and not adding extra strain to the Statford network. Lower environmental impact, not using greenbelt land.

No

Preferred Options 2025

ID sylw: 97532

Derbyniwyd: 05/03/2025

Ymatebydd: Miss Ellie Salmon

Crynodeb o'r Gynrychiolaeth:

This development will have a significant detrimental impact to biodiversity, heritage sites, rural character, the local community and the eight private properties of Lower/Upper Spring Farm. The site lacks all the necessary infrastructure to support such a development and will impact village separation. The Feldon Basin land frequently floods, there is no integrated transport infrastructure, no railway station, dependency upon motor vehicles. J12 has become increasingly busy and is not designed to handle the requirements from this development. Ancient wood Itchington Holt and is inhabitants will be severely impacted. This development is entirely incompatible with the rural area and beauty.

No

Preferred Options 2025

ID sylw: 97555

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Tom Dodd

Crynodeb o'r Gynrychiolaeth:

This development covering 190ha will have a significant detrimental impact to biodiversity, heritage sites, rural character, the local community and the eight private properties of Lower Spring Farm and Upper Spring Farm. All sites under SG14 do not score under 57 in the HEELA assessment, demonstrating that this is not a suitable area. There is no integrated transport infrastructure, no railway station and therefore complete reliance upon motor vehicles which doesn't support sustainable travel.

No

Preferred Options 2025

ID sylw: 97563

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Martin Winter

Crynodeb o'r Gynrychiolaeth:

There is too much focus on J12 of the M40 in the SWLP. The Feldon area is characterised by the Warwickshire Landscapes Project as “an agricultural region largely unaffected by urban and industrial development. This is its special feature.” Development is not in keeping with the size of existing village communities. Development here will not minimise travel as there is no rail service, sparse bus service, no cycle paths, and distances too great to walk. Development will affect access to country lanes for heathy exercise given JLR to the north, MOD Kineton to the south, the M40 to the east.

No

Preferred Options 2025

ID sylw: 97718

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs cynthia bettany

Crynodeb o'r Gynrychiolaeth:

The site is again near to j12,M40, a junction that is currently at over capacity/congested for periods in the morning and afternoon for those that already use it from JLR and AM , Lighthorne development and surrouding villages for access to Birmingham, Coventry,Warwick to the north and Banbury, Oxford and London to the south. The proposed site is next to woodland where light pollution would impact on wildlife, the south border becomes waterlogged/floods and to the east would surround a cluster of residential homes. Again, it would impact and smoother the rural village of Gaydon.

Yes

Preferred Options 2025

ID sylw: 97842

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Gary Jeffery

Crynodeb o'r Gynrychiolaeth:

Suitable as near to M40

Other

Preferred Options 2025

ID sylw: 97846

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Simon West

Crynodeb o'r Gynrychiolaeth:

The current developments in the SG14 area have not had the local infrastructure and healthcare amenities that were promised to be sustainable and that have negatively impacted care provided to existing residents of the Southam area. Any new growth must provide sustainable facilities for the new and existing population. Facilities must be up and running before any new population takes up residence in new areas to prevent over-burdening of already stretched existing healthcare facilities.
Lack of sustainable transport and existing road infrastructure poor, limited to B class roads through villages apart from access to the M40 junction for travel North/South.

Yes

Preferred Options 2025

ID sylw: 97847

Derbyniwyd: 05/03/2025

Ymatebydd: Mr Paul Hibbert

Crynodeb o'r Gynrychiolaeth:

This site has a number of benefits including: lots of job opportunities nearby (JLR etc); allow for a new commuting area (linking with HS2); provides opportunity to reduce traffic and emissions though new public transport links (new train station given proximity to Chiltern line); takes traffic congestion away from Stratford; and less impact on greenbelt land environment.

Yes

Preferred Options 2025

ID sylw: 97930

Derbyniwyd: 05/03/2025

Ymatebydd: Mrs Charlotte Careless

Crynodeb o'r Gynrychiolaeth:

Good transport links nearby. Good job opportunities at JLR.

No

Preferred Options 2025

ID sylw: 98046

Derbyniwyd: 06/03/2025

Ymatebydd: Mr Jake Salmon

Crynodeb o'r Gynrychiolaeth:

This development covering 190ha will have a significant detrimental impact to biodiversity, heritage sites, rural character, the local community and the eight private properties of Lower Spring Farm and Upper Spring Farm. The site lacks necessary infrastructure to support any development. The Feldon Basin land frequently floods, there is no integrated transport infrastructure, no railway station, dependancy upon motor vehicles. J12 has become increasingly busy and is not designed to handle the requirements from this development. Ancient wood Itchington Holt and is inhabitants will be severely impacted. This development is entirely incompatible with the rural area. HELAA = Not Suitable.

Yes

Preferred Options 2025

ID sylw: 98223

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Anne Teed

Crynodeb o'r Gynrychiolaeth:

Does not include green belt land.

Yes

Preferred Options 2025

ID sylw: 98311

Derbyniwyd: 06/03/2025

Ymatebydd: Mrs Daine Davis

Crynodeb o'r Gynrychiolaeth:

Gaydon has major employment opportunites, good road links and is an ideal area to be developed as a "new town".