Preferred Option: Provision of Transport infrastructure

Yn dangos sylwadau a ffurflenni 31 i 47 o 47

Gwrthwynebu

Preferred Options

ID sylw: 48527

Derbyniwyd: 26/07/2012

Ymatebydd: Kirsti Sispal

Crynodeb o'r Gynrychiolaeth:

A "Northern Relief Road" is not required. The road will serve no purpose other than to take new home owners quickly on to the A46 and to jobs and shopping opportunities away from our Towns. It will need to be built across the flood plain and will violate an important nature corridor along the River Avon. If the proposed development is concentrated in the South of Leamington there is an existing road network that could be upgraded at considerably lower cost.

Gwrthwynebu

Preferred Options

ID sylw: 48690

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Susan Tall

Crynodeb o'r Gynrychiolaeth:

Object to cycle way through the middle of Kenilworth Abbey Fields due to concerns over conflict with children at play and other uses.

Gwrthwynebu

Preferred Options

ID sylw: 48696

Derbyniwyd: 19/07/2012

Ymatebydd: Mr K Shaw

Crynodeb o'r Gynrychiolaeth:

Object to turning the A452 between Leamington and Kenilworth into dual carriage way will not help traffic flows. At peak times the delays on the A452 result from commuters wanting access to the Town centres. Building houses in the area will
increase the congestion and the dual carriage way will have a detrimental effect on the picturesque northern gateway to Leamington and southern gateway to Kenilworth.

Gwrthwynebu

Preferred Options

ID sylw: 48697

Derbyniwyd: 19/07/2012

Ymatebydd: Mr K Shaw

Crynodeb o'r Gynrychiolaeth:

Object to the development of a northern relief road which will take jobs and shopping opportunities away from our towns. The road will also form a natural barrier and encourage inappropriate development activity, including out of town stores.

Gwrthwynebu

Preferred Options

ID sylw: 48713

Derbyniwyd: 15/07/2012

Ymatebydd: Mr. Daniel Martin

Crynodeb o'r Gynrychiolaeth:

Object to the development of a Northern Relief road - public money could be better used on the redevelopment of existing Brownfield Sites and change of use.

Gwrthwynebu

Preferred Options

ID sylw: 48732

Derbyniwyd: 18/07/2012

Ymatebydd: Mr & Mrs Andrew & Susan Strain

Crynodeb o'r Gynrychiolaeth:

Object to the dual carriageway proposal connecting Leamington with Kenilworth and do not consider that the 'northern relief road' is required which will lead to a natural development barrier encouraging further development, as well as a loss of jobs and shopping opportunities from the towns.

Gwrthwynebu

Preferred Options

ID sylw: 48786

Derbyniwyd: 14/07/2012

Ymatebydd: Mr Michael Kelsey

Crynodeb o'r Gynrychiolaeth:

Two road developments are contemplated, both of which are unnecessary and will achieve little. The dual carriageway proposed for the A452, can only transfer congestion from one place to another, slightly more quickly. The proposed new Northern relief road (additional to the A46 ), can only realistically be used preferentially by those living in the houses comprising the proposed new
development in Blackdown and South of Old Milverton Lane.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48789

Derbyniwyd: 18/07/2012

Ymatebydd: Mr Jonathan Lander

Crynodeb o'r Gynrychiolaeth:

Object to the proposals to turn the A452 between Leamington and Kenilworth into a dual carriageway. The Northern Relief Road is also not required.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48843

Derbyniwyd: 26/07/2012

Ymatebydd: John Brightley

Crynodeb o'r Gynrychiolaeth:

Does not support the Northern Relief Road - not be a sustainable policy as it would lead to more use of the private car at the expense of more sustainable forms of transport. It would be contradictory to other policies in the Local Plan.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 48914

Derbyniwyd: 19/07/2012

Ymatebydd: Royal Leamington Spa Town Council

Crynodeb o'r Gynrychiolaeth:

Residents should also be encouraged to travel by bus for work and leisure with the encouragement of more quality bus routes into and across Leamington. Also a need to encourage the co-ordination of different forms of transport to encourage more residents to travel by foot, bus, train and bicycle.

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 49433

Derbyniwyd: 19/07/2012

Ymatebydd: Mr Steve Williams

Crynodeb o'r Gynrychiolaeth:

The Preferred Options summary leaflet makes no mention of the
Gateway development, only showing "highway improvements as per abstract from the summary in Appendix 5 of this letter, which are as per Map 5 of the preferred options.... This is misrepresentative of the developer's intentions. The public are not therefore being afforded the opportunity to see the true extent of the proposals in the summary leaflet, so are not being afforded
the opportunity to comment.

Gwrthwynebu

Preferred Options

ID sylw: 49556

Derbyniwyd: 16/07/2012

Ymatebydd: Leek Wootton & Guy's Cliffe Parish Council

Crynodeb o'r Gynrychiolaeth:

The proposed 'Leamington Northern Relief road' will unavoidably cause excessive environmental damage, having to cross a railway line, river and a flood plain.

Atodiadau:

Cefnogi

Preferred Options

ID sylw: 49838

Derbyniwyd: 27/07/2012

Ymatebydd: Clare Spruce

Crynodeb o'r Gynrychiolaeth:

Pleased to see the extension of transport infrastructue in the Plan, in particular the planned extensions to the cycle network across Abbey Fields that will make travel around this locality much safer (particularly for children).
The addition of a new railway station at Kenilworth would be a great improvement to sustainable transport and very welcome for both business and leisure travel.

Gwrthwynebu

Preferred Options

ID sylw: 49907

Derbyniwyd: 02/08/2012

Ymatebydd: Bishops Tachbrook Parish Council

Crynodeb o'r Gynrychiolaeth:

If developers are to pay for additional transport infrastructure it is probable, even on very large schemes that the high costs of providing additional road, rail and park & ride facilities through such CIL payments is likely to make the project unviable.

Gwrthwynebu

Preferred Options

ID sylw: 49922

Derbyniwyd: 27/07/2012

Ymatebydd: Mrs Maggie King

Crynodeb o'r Gynrychiolaeth:

Objector believes that the ambition to provide sustainable forms of transport is at odds with the identification of projects to deal with increased road journeys/ capacity. Questions the ability of the dualling of the A452 and Northern relief road to cope with demand as well as the fact that they will create negative environmental effects on the landscape. The location of the park and ride scheme in North Leamington is considered to be questionable

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50162

Derbyniwyd: 03/08/2012

Ymatebydd: Mr & Mrs Peter & Linda Bromley

Nifer y bobl: 2

Crynodeb o'r Gynrychiolaeth:

We are given no concrete proposals for new roads, only ideas. A North Leamington relief road suggestion could cost £50million+ and the idea that the A452 could be routed to the Fosse - one of the most dangerous roads in the County is preposterous. The proposal to create a dual carriageway along Europa Way to alleviate the traffic queuing off and on to the M40 will have the opposite effect at the eastern end of Myton Road with the addition of Morrisons and the proposed trading estate and Aldi supermarket all exiting out on to the double roundabout system. The present Plan does not address these traffic problems sufficiently and should be "refused on transport grounds where the residual cumulative impacts of development are severe (NPPF 32).

Atodiadau:

Gwrthwynebu

Preferred Options

ID sylw: 50757

Derbyniwyd: 27/07/2012

Ymatebydd: Sue Munday

Crynodeb o'r Gynrychiolaeth:

cannot understand how a dual carriageway between Kenilworth and Leamington will help as all the traffic will have to funnel in at either end and will just result in 4 lanes of slow moving traffic instead of 2. Creation of bus lanes will in any case limit traffic flow to one lane in each direction to speed up a bus every 10 minutes if you're lucky, and nothing will be gained in terms of traffic build up.