BASE HEADER
Mod 20 - DS NEW1
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68391
Derbyniwyd: 22/04/2016
Ymatebydd: Cryfield Land (Kenilworth) Ltd
Asiant : Mr Niall Crabb
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
A further Review of the developable land south of Coventry is being proposed within 5 years in order to meet demand seems to be already accepted so it should not be postponed.
It is believed that the current choice of allocated sites is not based on objective and transparent analysis so the most appropriate course of action would be to have a full analysis of ALL the proposed sites in this area NOW, as part of the New Plan's Examination in Public.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68572
Derbyniwyd: 22/04/2016
Ymatebydd: Mr JOHN BOILEAU
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
The phrase "the Green Belt between Coventry and Kenilworth should be protected; (bullet point 6) implies that WDC attaches no importance to the Green Belt between Leamington and Kenilworth. Nowhere is that Green Belt more at risk than in the Milverton - Blackdown - Chesford area where Kenilworth and Leamington are at their closest distance.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68634
Derbyniwyd: 14/04/2016
Ymatebydd: MR ROBERT DONNELLY
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Objects to allocation: -
- impact on natural environment
- impact on historic environment
- flooding
- additional traffic
- adverse impact on existing facilities and services
- threat to Alvis sports club
- loss of landscape and visual amenity
- should look to other sites and promote regeneration
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68641
Derbyniwyd: 12/03/2016
Ymatebydd: Mr. Ian Scott
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Issues around allocation of additional housing in Westwood Heath due to increased adverse impacts on road network in vicinity.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68682
Derbyniwyd: 14/04/2016
Ymatebydd: Christine Kinsella
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Object to proposals: -
- loss of green belt
- low-lying land susceptible to flooding
- sewage works has adverse impacts on residential amenity
- impact of construction traffic over many years
- lack of research on the part of the council
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68686
Derbyniwyd: 21/04/2016
Ymatebydd: Mr Edward Norris
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
As a resident of Coventry who has lived on the border of Warwick District Council for 40 years I am writing to place on record my objection to the plan to build on the area known as site ref H43 (Kings Hill).
I have listened to all the arguments both "for" and "against" and I can see no justification for building within this area. I request that these plans are reviewed and turned down on the basis that Coventry has more than enough of its own "brown field" sites to accommodate this house building plan.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68844
Derbyniwyd: 21/04/2016
Ymatebydd: Mr. David Michael Broadbent
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Adverse impacts of proposed development on local road infrastructure
Current infrastructure is inadequate to meet current needs, let alone future requirements
Plan and modifications do not provide clarity on precisely how objectives can be met - specifications cannot be realistically delivered without major additional infrastructure changes/improvements outside the limits of Map 35
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68861
Derbyniwyd: 15/04/2016
Ymatebydd: mr Charles McDonald
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Object to proposals: -
- lack of suitable infrastructure will be exacerbated by additional traffic
- Coventry Local Plan proposing additional housing in area
- significant congestion already occurs
- HS2 works will last for a number of years and will generate large numbers of HGV movements
- overall infrastructure provision for both Coventry and Warwick should be planned and co-ordinated
- any housing development should not commence until after HS2 has finished construction in 2026
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68917
Derbyniwyd: 15/04/2016
Ymatebydd: Crest Strategic Projects Limited
Asiant : d2planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Support policy allocation of land at Westwood Heath.
Note cap of 425 dwellings - want to fully understand it and how infrastructure can be provided to allow additional development to take place. Provision of infrastructure should be proportionate.
Welcome partial five-year review of plan but it will not be able to examine green belt boundaries - options for development will not be able to be considered - additional land at Lodge Farm should be released from green belt now.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68951
Derbyniwyd: 20/04/2016
Ymatebydd: Peter Langley
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Policy includes vague criteria for allocating land for housing south of Warwick. Wrong in principle to consult without more clear-cut proposals, leaving local people and interest groups with uncertainty.
Plan too deferential towards growth aspirations of Warwick University - should not give it carte blanche to do whatever it wishes to do, but that in effect is what is proposed.
Heavy reliance on master planning for comprehensive development of the larger proposed housing sites - will make it less likely that housing proposals will be implemented within timescale envisaged in housing trajectory, particularly where land is in multiple ownership.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68983
Derbyniwyd: 22/04/2016
Ymatebydd: Alvis Sports Club
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
See attached.
The Club do not consider this modification to adequately either protect or consider the potential for development of the Club's infrastructure to sustain its community sporting and social offer to existing and future residents of Warwick DC nor Coventry cc. In not doing this the proposed modification does not meet the NPPF requirements
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69003
Derbyniwyd: 21/04/2016
Ymatebydd: Historic England
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
'Development proposals for the strategic sites will be expected to address the following as a minimum: Proposals for development must respond positively to natural and heritage assets; wherever possible and viable, development should enhance the settings of such assets.'
The emphasis of the caveat "wherever possible and viable" is inconsistent with the NPPF and should either be deleted or replaced with "where appropriate" (NPPF Glossary - definition of Conservation).
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69036
Derbyniwyd: 12/04/2016
Ymatebydd: Baginton Parish Council
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Proposed development unsustainable - inadequate infrastructure and transport networks
Commuting likely to be towards Coventry to north or east to sub-regional site - insufficient account taken of vehicle movements affecting surrounding area
While some mitigation proposed but it would not support commuting north / east
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69100
Derbyniwyd: 21/04/2016
Ymatebydd: Mr. Paul Wood
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
The proposals would mean an equivalent number of houses of twice as many as are already in the Finham area of Coventry. This would need a large increase in the water treatment plant capacity.
Coventry is already densely populated, to propose this many new dwellings concentrated in one area will greatly exacerbate the situation.
There is no allowance for any green belt land between the two housing areas.
It seems a hurriedly prepared plan with no in depth study to its overall effects and with little time for proper public consultation.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69173
Derbyniwyd: 22/04/2016
Ymatebydd: Lioncourt Strategic Land - Andy Faizey
Asiant : Savills
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
OBJECT to the following policy wording:
k) "provision of emergency services infrastructure and other issues that may be identified" - this requirement is too general and needs more clarification in terms of scale and associated costs. We would request that "and other issues that may be identified" is removed from the text.
With respect to item g), we would also note that consideration has been given by Lioncourt to the option of a station within the Kings Hill site. An initial feasibility study has been carried out which identifies a number of issues with this location
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69219
Derbyniwyd: 22/04/2016
Ymatebydd: Barwood Development Securities Ltd
Asiant : HOW Planning LLP
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Council's justification for the release of such a quantum of Green Belt land is not justified and, furthermore, the parcels identified to be removed from the Green Belt are assessed as providing a great contribution to the role and function of the Green Belt.
The inclusion of this policy, and the subsequent updates to those policies which seek to identify development site, materially change the Local Plan's strategic and spatial strategies and therefore cannot be considered to be an update to the Local Plan.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69229
Derbyniwyd: 22/05/2016
Ymatebydd: Severn Trent Water (Supply Team)
Asiant : GL Hearn
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Proposed modification to the local plan in its current form is not the most appropriate strategy and, as such, cannot be considered 'sound' having regard to Sections 20(5) of the Planning and Compulsory Purchase Act 2004 and paragraphs 178 - 182 of the NPPF.
Potential for the strategic allocation at King's Hill (H43) currently proposed as a Modification to the Local Plan to help meet such significant employment land needs has not been maximised.
Cefnogi
Proposed Modifications January 2016
ID sylw: 69250
Derbyniwyd: 22/04/2016
Ymatebydd: Taylor Wimpey
Asiant : Barton Willmore
HAMPTON MAGNA
We wish to support the Council in their approach to capping delivery of the Westwood Heath and Kings Hill sites due to infrastructure and delivery rates respectively.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69258
Derbyniwyd: 22/04/2016
Ymatebydd: CEG Steel/Pittaway
Asiant : Nexus Planning
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
S1 could come forward as part of a comprehensive development with site H42, delivering up to 1,500 dwellings and at least 425 dwellings within the Plan period. This would not address all development pressures south of Coventry and should be seen an initial phase of wider development growth.
WDC should prepare an Area Action Plan (AAP) for the wider area south of Coventry, rather than dealing with it through a partial review of the Local Plan. The broad area could be referenced in the Local Plan with the exact extent determined through the preparation of the AAP itself
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69598
Derbyniwyd: 21/04/2016
Ymatebydd: Lenco Investments
Asiant : RPS Planning & Development
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Two urban extensions for Coventry not justified or supported by work undertaken
No certainty of delivery within plan period
Strategic sites proposed do not appear to bear any relation to the strategic employment growth proposed as part of the Coventry Gateway site.
Number of constraints for both of the identified sites
Land ownership around Kings Hill not represented by consortium.
Issues around access and highways, including need for new link road
Areas subject to flood risk
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69674
Derbyniwyd: 13/04/2016
Ymatebydd: Mrs Lesley Tacon
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
425 new homes and land safeguarded.
Concern over additional traffic on Westwood Heath Road/Cromwell Lane/Bockendon Road not adequately planned for
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69735
Derbyniwyd: 22/04/2016
Ymatebydd: Sport England
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Clarification should be made in regards to the intended future of the sports club site (Alvis) at Kings Hill.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69801
Derbyniwyd: 22/04/2016
Ymatebydd: Bubbenhall Parish Council
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
The proposed approach is based on Warwick District providing in full unmet needs including those arising from outside the district (Ref Mod 20 and DS16). The Proposed Modifications claim that meeting Coventry's needs "is an important aspect of creating a sustainable and secure base for the growth of the city" (Ref Mod 21). The NPPF explicitly excludes Green Belt from its presumption in favour of sustainable development, stating that unmet needs from neighbouring authorities should be met 'where it is reasonable to do so and consistent with achieving sustainable development'.
The Government has repeatedly confirmed that the single issue of unmet demand is unlikely to outweigh harm to the Green Belt to constitute the very special circumstances needed to justify inappropriate development in the Green Belt.
The cumulative impact of meeting in full sub-regional needs for both housing and employment would be very harmful, excessive and not justified. The policy is unsound because it has not fully considered the Joint Green Belt Study 2015.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69815
Derbyniwyd: 22/04/2016
Ymatebydd: Coventry and Warwickshire Local Enterprise Partnership (CWLEP)
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
DS NEW1 Directions for Growth south of Coventry should be further revised to accommodate provision and more detailed consideration of the areas for employment growth. Specific references should be included in the text to acknowledge the potential of areas to provide new development opportunities for increased employment floorspace.
The list of "key objectives "contained within DS NEW1 should be amended to include a requirement to include additional provision of employment floorspace. This will focus landowners and developers on the need to make provision in appropriate mixed uses schemes.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69855
Derbyniwyd: 22/04/2016
Ymatebydd: Mrs J Mackenzie
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Allocations contrary to NPPF requirement to maintain separation, prevent coalescence
Numbers based on Coventry requirements not approved in local plan, revised before 2017?
No critical examination of claims that land unavailable -areas of Coventry green belt could be developed with less impact
Provision of land to meet Coventry's overspill contrary to NPPF - require sub-regional SA to be valid
How do proposals fit with neighbouring development
No consultation undertaken with parish councils before decisions made
MoU providing additional housing for Combined Authority circumvents democratic process, NPPF
Impact of proposals at Thickthorn and Kings Hill next to over-capacity A46 not considered
Cefnogi
Proposed Modifications January 2016
ID sylw: 69881
Derbyniwyd: 22/04/2016
Ymatebydd: Bishop's Tachbrook Parish Council
Why is HS2 mentioned as contributing to the area of growth. HS2 only passes through the area. Only refer to proposed transport networks to encompass these issues in the local plan policy.
The inclusion of this policy is welcomed together with the potential for it to expand in the future if necessary. It means that further land take south the towns to accommodate the new requirement from the HMA problem is no longer necessary since further land south of Coventry is.
It is important that the Duty to Cooperate obligations across the HMA are acknowledged.
It would be expected that as these developments are initiated by their projected unmet need that Coventry's planners will take the lead in producing a comprehensive development plan for all the sites being provided by the remainder of the Housing Market Area. The infrastructure works will need to be coordinated with matters within the city boundary as well as the adjacent sites.
The joint authorities should devise plans that when developers are preparing their parts of the plan, they have a clear idea of what they are expected to include within their planning application.
Cefnogi
Proposed Modifications January 2016
ID sylw: 69959
Derbyniwyd: 21/04/2016
Ymatebydd: University of Warwick
Asiant : Turley
Supports the acknowledgement of its future plans in this new policy. The existing masterplan approved in 2009 runs until 2019 and will be reviewed within the next two years to coincide with the removal of the campus from the Green Belt. The University supports the principle of its close co-operation in the development of proposals in the area and will be a willing participant in the comprehensive longer-term planning of the area referenced. The University also strongly supports the potential for a new road although the suggested link at Kirby Corner needs rethinking. Further work is needed to ensure that by the time of the examination, the evidence base to support strategic infrastructure requirements is further advanced. The University strongly supports improvements to rail infrastructure. Any review of the Local Plan should also take into account the revised masterplan for the University
Cefnogi
Proposed Modifications January 2016
ID sylw: 69973
Derbyniwyd: 22/04/2016
Ymatebydd: Sharba Homes
Asiant : Barton Willmore
RADFORD SEMELE - Agree with capping of assumed delivery of Westwood Heath and Kings Hill due to infrastructure and delivery rates as well as lack of demonstrable delivery on highly sensitive and constrained sites that have yet to be properly assessed for suitability and capacity.
It is important in meeting the needs of the HMA that Council are realistic in this regard to ensure that the Plan is effective and deliverable by 2029. Given the timescales for adoption of the Plan and progressing of a site the scale of Kings Hill, 1,800 dwellings by 2029 should be considered highly aspirational.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69989
Derbyniwyd: 22/04/2016
Ymatebydd: Richard & Janel, Vince & Caroline Hill & McCullagh
Asiant : Turley Associates
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
The allocation at Westwood Heath should be extended to include land to the east. The Council has assessed the site as unsuitable and not achievable. However it is contended that access can be achieved via Cromwell Lane. Alternatively access could be achieved through site H42. A landscape and visual impact assessment has been undertaken. This shows the site can accommodate some change, particularly in light of site H42 and the safeguarded land further to the east. The site is within close proximity to employment opportunities (e.g. Charter Avenue Industrial Estate) and community facilities at Tile Hill and Burton Green. The site is within the green belt but does not meet the 5 purposes of the green belt. There are no physical constraints which would prevent the development of the site. It is available now and the landowners are willing to release it.
Cefnogi
Proposed Modifications January 2016
ID sylw: 70015
Derbyniwyd: 22/04/2016
Ymatebydd: Sharba Homes
Asiant : Barton Willmore
BISHOPS TACHBROOK
Agree with capping assumed delivery of Westwood Heath and Kings Hill sites due to infrastructure and delivery rates respectively as well as the lack of demonstrable delivery on highly sensitive and constrained sites that have not been properly assessed for suitability and capacity.
It is important in meeting the needs of HMA that Council are realistic in this regard to ensure that the Plan is effective and deliverable by 2029. Given the timescales for adoption of the Plan and progressing of a site the scale of Kings Hill, 1,800 dwellings by 2029 should be considered aspirational.