BASE HEADER
H50 - Cubbington - Land east of Cubbington
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68111
Derbyniwyd: 30/03/2016
Ymatebydd: MRS SARAH HEAVEN
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
I OBJECT TO THE HOUSING PROPOSALS DUE TO THE FACT THAT:
- THE LAND IS GREENBELT DESIGNATED
- WITH THE PROPOSAL OF HS2 RUNNING THROUGH THE AREA THE BUILD UP OF TRAFFIC ON THE RUGBY ROAD WILL INCREASE DRAMIATICALLY
- HS2 PLANS TO INTERSECT THE RUGBY ROAD, HOW WILL THE TWO BUILDING PROJECTS WORK TOGETHER
-FLOODING PROVISIONS IN THE AREA ARE ALREADY STRETCHED. ADDING MORE CONCRETE WILL NOT HELP THIS MATTER
- THE LOCAL AMENITIES CANNOT COPE WITH ALL THESE ADDITIONAL HOMES
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68142
Derbyniwyd: 02/04/2016
Ymatebydd: Mr Colin Eccles
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
1. Arable Greenbelt land, used to provide food should not be built on apart from in exceptional circumstances.
2. Insufficient drainage, increasing the risk of a large number of residents having their homes flooding.
3. Failure to consider local infrastructure in Cubbington; Schools and Surgeries. The wider impact on Warwick Hospital with increase in patient numbers. The impact on town centres in terms of congestion and parking.
4. The impact on the landscape and local wildlife.
5. The accountability of the people who prepared the plan for complete failure in not informing or working with the Parish County Council.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68162
Derbyniwyd: 06/04/2016
Ymatebydd: Ms Gabriela Deppe
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
Development allocation of H50 (Land East of Cubbington) is unacceptable due to the environmental impact - building on green belt land should only be done in exceptional circumstances. There are also major issues with flood risk, increased traffic, congestion and lack of parking in Cubbington and lack of provision to improve infrastructure of Cubbington (schooling, medical facilities, drains / sewers).
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68196
Derbyniwyd: 12/04/2016
Ymatebydd: Mrs Samantha Eccles
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
1. Greenbelt land, and not being an exceptional circumstance.
2. Insufficient drainage and increased risk of flooding to the lower village.
3. Loss of arable land and the increased need to import food.
4. Impact on landscape and wildlife.
5. Public rights of way and increased road traffic, increasing risk of road traffic accidents.
6. Failure to assess impact on infrastructure including schools and healthcare.
7. Failure to communicate with local elected representatives in preparation of plan.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68197
Derbyniwyd: 10/04/2016
Ymatebydd: Gavin Ayers
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
There has been no consultation with local residents with regard to the increase in planned housing.
Cubbington historically suffers from flooding due to run off water. There have been two major schemes which have attempted to deal with the problem. Notably, the scheme where work was completed in Cubbington Primary School in 2001, failed to address the flooding in 2007. The latest scheme, completed in 2015 on Mill Lane, has yet to be tested.
It has been suggested that the covering of land that acts as a natural soak away can contribute to further surface water and increase a flooding risk.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68386
Derbyniwyd: 19/04/2016
Ymatebydd: Mrs Jennifer Tandy
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
The idea of putting so many houses into this Old beautiful village will not only be detrimental to the villagers for the reasons mentioned but we are already going to be ripped apart by the HS2, its destruction of the landscape, the construction work, the inconvenience of large lorries thundering along our Lanes and Roads, the pollution. We are being HOUNDED. It also begs the question why put houses SO close to the HS2 when other areas are being vacated.???
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68431
Derbyniwyd: 20/04/2016
Ymatebydd: Mr Jonathan Rawlings
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
This is a joint representation from Jonathan Rawlings and Maureen Rawlings.
The allocated area is green belt land. The National Planning Policy Framework states that green belt boundaries should only be altered in exceptional circumstances. We feel that the Local Plan fails to make the case that the circumstances in Cubbington are exceptional.
---The proposed H50 development will have a detrimental impact upon the landscape to the east of Cubbington; the Local Plan acknowledges that there are landscape issues.
---The Local Plan makes insufficient provision for improving Cubbington's infrastructure to support the increased population, eg: medical facilities; schooling and drains/sewers.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68442
Derbyniwyd: 20/04/2016
Ymatebydd: Mr Jonathan Rawlings
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
This is a joint representation from Jonathan Rawlings and Maureen Rawlings.
Surface water drainage from the H50 fields will require a sustainable urban drainage system to be employed within any development. We consider that even with such a system the risk of flooding of susceptible parts of the village will be unacceptably high.
---Building the proposed number of homes will increase traffic on the B4453 Rugby Road, which is already high at peak periods. Road access for H50 may be problematic when the road is embanked in order to bridge the HS2 line.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68483
Derbyniwyd: 21/04/2016
Ymatebydd: Irene Burden
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
This is a joint representation by Irene and Raymond Burden.The allocated area is green belt land. The National Planning Policy Framework states that green belt boundaries should only be altered in exceptional circumstances. We feel that the Local Plan fails to make the case that the circumstances in Cubbington are exceptional.---The proposed H50 development will have a detrimental impact upon the landscape to the east of Cubbington; the Local Plan acknowledges that there are landscape issues.---The Local Plan makes insufficient provision for improving Cubbington's infrastructure to support the increased population, eg: medical facilities; schooling and drains/sewers.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68484
Derbyniwyd: 21/04/2016
Ymatebydd: Irene Burden
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
This is a joint representation from Irene and Raymond Burden.Surface water drainage from the H50 fields will require a sustainable urban drainage system to be employed within any development. We consider that even with such a system the risk of flooding of susceptible parts of the village will be unacceptably high.---Building the proposed number of homes will increase traffic on the B4453 Rugby Road, which isalready high at peak periods. Road access for H50 may be problematic when the road is embanked in order to bridge the HS2 line.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68493
Derbyniwyd: 21/04/2016
Ymatebydd: Mr Roger Lee
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Nac Ydi
The land shown as H50 is not suitable for development :-
1 Too close to HS2 and access could be required during construction
2 Impact on an area of high land scape value and the Local Plan accepts there are landscape issues.
3 Protect Green Belt Status. Boundaries should only be altered in exceptional circumstances. None exist.
4 Flooding of surface water into village will increase due to housing.
5 Increase of traffic on B4453 by additional housing further exasperated by HS2 construction traffic.
6 No provision for increase in Cubbington infrastructure schools etc
7 No requirement identified for additional housing in Cubbington.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68506
Derbyniwyd: 21/04/2016
Ymatebydd: Andrew Rawlings
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
Joint representation for Mr Andrew Rawlings and Mrs Samantha Rawlings.
The proposed H50 development will have a detrimental impact upon the landscape to the east of Cubbington; the Local Plan acknowledges that there are landscape issues.
The Local Plan makes insufficient provision for improving Cubbington's infrastructure to support the increased population, eg: medical facilities; schooling and drains/sewers.
Surface water drainage from the H50 fields will require a sustainable urban drainage system to be employed within any development. We consider that even with such a system the risk of flooding of susceptible parts of the village will be unacceptably high.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68507
Derbyniwyd: 21/04/2016
Ymatebydd: Andrew Rawlings
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
This is a joint representation for Mr Andrew Rawlings and Mrs Samanatha Rawlings. 2nd part of representation.
Building the proposed number of homes will increase traffic on the B4453 Rugby Road, which is already high at peak periods. Road access for H50 may be problematic when the road is embanked in order to bridge the HS2 line.
The allocated area is green belt land. The National Planning Policy Framework states that green belt boundaries should only be altered in exceptional circumstances. We feel that the Local Plan fails to make the case that the circumstances in Cubbington are exceptional.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68571
Derbyniwyd: 22/04/2016
Ymatebydd: Miss Amie Wiberley
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Ydi
Proposal is unsound because;
Proposed use of green belt land in non exceptional circumstances and not justifying going against government policy and the National Planning Policy Framework.
Extensive flood risk from use of proposed fields, leaving areas of the village susceptible to flooding.
Negative impact on landscape and wildlife, already under threat from the development of HS2.
Impact of a large increase in population on local infrastructure.
Increased traffic on roads, specifically B4453 also possible impact of HS2.
Insufficient provision for increased need for local amenities including, schools and medical care.
Negative impact of increase on a small local community.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68677
Derbyniwyd: 15/04/2016
Ymatebydd: Dr Peter Shipton
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Concerns about flooding risk and inadequate drainage infrastructure across site.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68791
Derbyniwyd: 22/04/2016
Ymatebydd: Caroline Marrow
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Objects to allocation: -
- Impact on natural environment and landscape
- insufficient public facilities and services
- inadequate local public transport
- loss of green belt and agricultural land
- impact on areas of nature conservation
- flood risk
- impact on water quality
- excessive number of houses proposed
- Cubbington not suitable to meet Coventry's need
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68817
Derbyniwyd: 18/04/2016
Ymatebydd: Mr. Nicholas Sellwood
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
The modifications do not set out any exceptional circumstances that justify removing this land from green belt.
Flooding risk of surface drainage water from the H50
This situation will be further exacerbated by the loss of woodland with the construction of HS2 which currently aids the absorption of surface water.
Traffic on this road is already busy at peak times. There is no recognition of this within the plan
Insufficient provision for improving Cubbington's infrastructure to support the proposed increase in population
The drains and sewers in the village are inadequate
Loss of agricultural land
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68905
Derbyniwyd: 18/04/2016
Ymatebydd: Mrs Karen Jobson
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Heb nodi
Dyletswydd i gydweithredu? Heb nodi
Only objection to H50 is valid as sites H25 and H26 were consulted upon in the submitted plan
Green Belt is precious and the sites may not be the only Green Belt land taken from the community.
effect on landscape
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68928
Derbyniwyd: 11/04/2016
Ymatebydd: Mr David Cox
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
- Green Belt boundaries should only be altered in exceptional circumstances. The Modified Local Plan fails totally to make the case that circumstances are exceptional
- flooding risk of surface water drainage
- detrimental impact upon landscape
- will increase traffic on the B 4453 Rugby Road which is high at peak periods.
- Road access for H50 may be problematic
- insufficient provision for improving Cubbington's infrastructure to support increased population
- not discussed at all with Cubbington Parish Council
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 68946
Derbyniwyd: 20/04/2016
Ymatebydd: Peter Langley
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
A substantial projection of development into pleasant open countryside east of the village.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69042
Derbyniwyd: 22/04/2016
Ymatebydd: Mr. Sam Brown
Cydymffurfio â’r gyfraith? Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
No justification for the allocation
No exceptional circumstances for development in the Green Belt
Site would require extensive landscaping
site suffers from surface water flooding
would also increase traffic problems in Cubbington
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69067
Derbyniwyd: 22/04/2016
Ymatebydd: The Rosconn Group
Asiant : Framptons
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Concern about the selection of reasonable alternatives in the SA process in respect of the Proposed Modifications. The SA may have contributed to the rejection of reasonable alternatives for additional development in the Villages centres as an option (in favour of major green belt/green field release new settlement proposals elsewhere) and therefore the exclusion from the strategy of potential residential development sites on the edge of sustainable settlements. It is also of concern that site H50 at Cubbington has emerged as an allocation.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69135
Derbyniwyd: 14/04/2016
Ymatebydd: Brian D Parkins
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Site H50 will overburden the school places, services available. Car traffic / access arrangements will have a negative impact on the village.
Cubbington , and the Ladycroft area in particular has already endured severe flooding (June 2007). Surface drainage has been improved but it is feared that additional housing (with associated water' run -off') may cause future flooding problems.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69166
Derbyniwyd: 20/04/2016
Ymatebydd: Mr. Simon Fisher
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Allocation of H50 is unsound. The site is Green Belt. Impact on classic English landscape has not been given enough consideration. Exceptional circumstances for green belt release have not been demonstrated. the proposals will be inappropriate development of green space with a public footpath within the green belt. No engagement has taken place prior to announcing the allocations of the site, meaning alternatives have not been properly considered.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69194
Derbyniwyd: 01/04/2016
Ymatebydd: Malcolm Storer
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Object to proposals: -
- poor public transport provision
- flooding a major issue
- storm and foul drainage systems inadequate
- local services and facilities close to capacity at present
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69382
Derbyniwyd: 18/04/2016
Ymatebydd: Mrs Diana Sellwood
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Objects to allocation: -
- flooding in area
- no evidence that risk of flooding has been considered or addressed - increases risk for existing households
- required new access will cause road safety issues
- additional traffic will create more congestion
- adverse impacts on current infrastructure, services and facilities
- loss of agricultural land
- no continuation of phased approach to housing delivery as in previous plan
- lack of proper consultation with local people
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69406
Derbyniwyd: 22/04/2016
Ymatebydd: Mrs. Annemarie Cawsey
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Object to the development for 95 homes
No exceptional circumstances in Cubbington to justify development in the Green Belt
There is a risk of flooding
Detrimental impact on landscape
Increase in traffic and access
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69432
Derbyniwyd: 20/04/2016
Ymatebydd: Mr and Mrs Joanne Corbett
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
Speeding is already a problem on Rugby Rd and Cubbington Rd. This will only get worse.
The centre of Cubbington is already congested and it will be more difficult to enter/leave the village.
The school is at capacity as are facilities for after-school. The extra houses will make this situation worse.
There is no infrastructure to support an increase in population in the village, such as doctors surgeries and shops.
Cubbington already struggles with flooding and the land is question has very poor drainage. Money has already been spent to resolve this, but more houses will compound the issue. It is unlikely that the existing drains and sewers could cope.
The area is green belt and should stay as such. The proposal would be ribbon development in to the green belt without exceptional circumstances to justify this.
This increase in the size of Cubbington will mean it no longer feels like a village and will undermine the enjoyment of the environment for all.
The proposals would extend the boundary of Cubbington in to open Countryside.
The proposal would require at least two additional access points on to the B4453. This would be dangerous, especially during construction for HS2.
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69435
Derbyniwyd: 10/04/2016
Ymatebydd: Dr. Malcolm Wilding
Cydymffurfio â’r gyfraith? Heb nodi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
The proposals will increase traffic on the B4453 which already has poorly designed junctions.
The plan makes insufficient consideration of the central village shopping where parking is inadequate.
#The schools are small.
The proposals will constitute ribbon development in to green belt land
The proposals will increase the risk of flooding
The hydrology of land north of B4453 needs investigating
Gwrthwynebu
Proposed Modifications January 2016
ID sylw: 69436
Derbyniwyd: 05/04/2016
Ymatebydd: Mr. Nick Lambert
Cydymffurfio â’r gyfraith? Nac Ydi
Cadarn? Nac Ydi
Dyletswydd i gydweithredu? Heb nodi
The local plan fails to make the case for exceptional circumstances to release this land from the green belt.
The plan makes insufficient provision for infrastructure in particular schools, and medical facilities.
The proposals will have a detrimental impact on the landscape as acknowledged by the Plan.
The plan also acknowledges flood risk from surface water drainage. Even with SUDs the risk of flooding to parts of the village will remain high.