BASE HEADER
Myton Garden Suburb (North of Gallows Hill/ West of Europa Way), Warwick
Cefnogi
Preferred Options
ID sylw: 48793
Derbyniwyd: 26/07/2012
Ymatebydd: Barbara and Nigel Hutchinson
Nifer y bobl: 2
Detrimental impact on the charatcer and integrity of the unique northern approaches to Leamington.
Detrimental impact on the recreatiional value of this well used area.
New and improved roads will also change the character of north Leamington as will the additional traffic.
South Leamington could benefit from a sensitive and well considered accommodation of housing - the area needs a serious investment. Infrastructure is already in place
Cefnogi
Preferred Options
ID sylw: 48794
Derbyniwyd: 26/07/2012
Ymatebydd: Barbara and Nigel Hutchinson
Nifer y bobl: 2
Detrimental impact on the charatcer and integrity of the unique northern approaches to Leamington.
Detrimental impact on the recreatiional value of this well used area.
New and improved roads will also change the character of north Leamington as will the additional traffic.
South Leamington could benefit from a sensitive and well considered accommodation of housing - the area needs a serious investment. Infrastructure is already in place
Gwrthwynebu
Preferred Options
ID sylw: 49038
Derbyniwyd: 18/07/2012
Ymatebydd: Mr. Peter Rolfe
Object to expansion plans for 1100 units on this site as it will increase vehicle congestion along Myton Road, Banbury Road and Europa Way as people make their way through Warwick to new employment sites towards Coventry. Warwick has already been subject to a significant growth in population and this proposal will have an impact on the historic built environment of Warwick; increase traffic pollution and put pressure on already stretched infrastructure, such as schools and GP surgeries. The site is also of high environmental value, acts as a green buffer and development will increase flooding in the area.
Gwrthwynebu
Preferred Options
ID sylw: 49075
Derbyniwyd: 27/07/2012
Ymatebydd: Mr C Wood
In relation to the proposed Gallows Hill developments of 2700 homes, while this is an obvious location for new housing (whilst of course, not agreeing that it's needed), the route into Leamington is at a standstill twice a day already, as is the Myton Road. It will be much worse as a result. There are serious flaws in the assumptions made in the Strategic Traffic Assessment - based on a different kind of development. This makes a significant difference to projected trip rates which should be much higher.
There should be a limit to traffic growth -nothing proposed about this.
Gwrthwynebu
Preferred Options
ID sylw: 49196
Derbyniwyd: 27/07/2012
Ymatebydd: Mr Jonathan Parkhouse
There is already extensive congestion in the area.
More employment toward Coventry will result in more cross town journeys.
Given constraints caused by the Avon bridge and town centre traffic calming, the proposed traffic improvements are unlikely to work.
Air quality is likely to reduce due to increase in traffic. This is inconsistent with the AQ Action Plan and other policies in the Preferred Options(PO12 and PO14).
The population has already increased much faster than average meaning infrastructure is at capacity.
The proposals will result in merging between Leamington and Warwick and the loss of valuable wildlife habitat/corridor.
Development will also increase the risk of flooding (already a problem) and there are no proposals to mitigate this.
Gwrthwynebu
Preferred Options
ID sylw: 49291
Derbyniwyd: 05/07/2012
Ymatebydd: Mrs Eileen West
Concern about the amount of traffic this development would generate n Myton Road. This is already busy at certain times o the day and with the proposed supermarket at one end and all the traffic coming into Myton Road from both end roundabouts there will be real problems. Add location 3 [South of Gallows Hill/Asps] to this and the traffic situation will be even worse.
If these developments are mainly family homes I also wonder how many more children are going to be found school places as I gather that many of the schools in this area are already full.
Gwrthwynebu
Preferred Options
ID sylw: 49363
Derbyniwyd: 09/07/2012
Ymatebydd: Mrs Patrica Kirk
Currently, there are high levels of congestion along the Myton Rd, the Banbury Rd and at the bottom of Europa Way going into Leamington Spa especially in rush hours and peak shopping hours at Sainsbury's. This is before Morrison's opens close to the station, which will bring further traffic chaos.
The narrow bridge to Warwick and the railway bridge by the old Ford factory provide a bottleneck for traffic.
If both sites are developed, there is a potential for another 4000+ cars, increasing danger for schoolchildren on Myton Rd.
Gwrthwynebu
Preferred Options
ID sylw: 49503
Derbyniwyd: 19/07/2012
Ymatebydd: Prof & Mrs J.K.A. Bleasdale
There will be a lot of extra traffic generated by locations 2 and 3. The proposed alterations to the Banbury/ Myton Road is unlikely to solve the problem.
Removal of the green belt which acts as a buffer will lead to urban sprawl.
The infrastructure provided is too weak to cope with the demand.
Gwrthwynebu
Preferred Options
ID sylw: 49592
Derbyniwyd: 11/07/2012
Ymatebydd: J & D Nash
Job creation toward Coventry will increase traffic through Warwick locking up congested roads at peak times and historic layout in Warwick town centre.
Improvements suggested will do nothing for Avon bridge bottle neck.
Air qualtity already poor.
Infrastructure will not sustain more.
Warwick already subject of much expansion.
Object specifically to zone 2 west of Europa Way which is supposed to be intouchable green buffer. Loss of habitat and wildlife.
Developing Myton side of site would threaten all houses with flooding.
Object to this being in phase one.
Urban fringe development unsustainable.
Overwhelming number of objections from residents.
Gwrthwynebu
Preferred Options
ID sylw: 49601
Derbyniwyd: 18/07/2012
Ymatebydd: Andrew, Julie, Eleanor, Henry Day
Approaches to historic Warwick would be dramatically and fundamentally altered. Last approach to Warwick that sets of rural and historic character.
Uses grade 2 agricultural land and would damage environment and character of surrounding community.
Congestion. Perhaps housing should be close to Gateway where new employment due.
Gwrthwynebu
Preferred Options
ID sylw: 49648
Derbyniwyd: 20/07/2012
Ymatebydd: Elizabeth Cliffe
Job creation likely near Coventry meaning more people wanting to drive through Warwick's congested roads.
Danger to public health from increased air pollution.
Current infrastructure will not sustain proposed increase in numbers.
Warwick districts population has increased more than the Warwickshire or West Midlands rate adding significantly to urban fringe development, a large proportion of which is in Warwick.
Zone 2 was to be untouchable green buffer to separate Warwick and Leamington.
Land west of Europa Way is rich agricultural land and provides habitats for wildlife.
Development threatens houses with flooding on south of Myton Road.
Area would be in phase one.
Infrastructure unable to cope.
Development should be in areas where air quality not already in breach of regulations and access to road network and rail links are direct.
Overwhelming number of objections to previous consultation.
Gwrthwynebu
Preferred Options
ID sylw: 49661
Derbyniwyd: 17/07/2012
Ymatebydd: Martin & Kim Drew & Barnes
Nifer y bobl: 2
This site forms part of a portfolio of sites for 3800 proposed homes, which extrapolates to 14-15,000 more people living south of Leamington and Warwick. These extra people will put a massive burden on the infrastructure such as roads/bridges to gain access to the Town Centres' and emergency services. The lack of infrastructure was a major objection to the last Preferred Option. If more housing is required there must be adequate infrastructure built in parallel. Historic infrastructure problems of poor water pressure, insufficient sewage, conjested road junctions, rat running and lack of school facilities, must not be repeated.
Cefnogi
Preferred Options
ID sylw: 49697
Derbyniwyd: 27/07/2012
Ymatebydd: Barford, Sherbourne and Wasperton Joint Parish Council
No objection to this proposal.
Gwrthwynebu
Preferred Options
ID sylw: 49847
Derbyniwyd: 02/08/2012
Ymatebydd: Bishops Tachbrook Parish Council
Of all the large development sites in the preferred option, this is the one to which there is the least objection. However, it should not be used as the easy option and certainly not in the first or even second phases. When and if it is brought into the plan, it should be in stages working down from the northern end.
Gwrthwynebu
Preferred Options
ID sylw: 50032
Derbyniwyd: 26/07/2012
Ymatebydd: Mr David Ramsbottom
Gateway job creation will increase traffic on congested Myton Road, Banbury Road and Europa Way at peak times and roads in historic Warwick.
Suggested improvements redundant. Bottle neck of Avon Bridge and constrained road layout and traffic calming in town centre means provision would not ease Myton Road backlog.
Consequence is effect on air quality and consequent danger to public health.
Infrastructure already at capacity.
Population increase twice that of Warwickshire and three times that of West Midlands.
Warwick already been subject to significant urban fringe development and population expansion, a large portion of which is in south.
Land is area of restraint, put forward as untouchable green barrier to separate Warwick from Leamington. It is rich agricultural land. Hedgerows provide habitats for many species.
Threat of flooding increased.
One of first areas to be developed in plan.
Development should be concentrated in areas where road improvements possible, air quality not already in breach of regulations and access to A46, M40 and rail links are direct so commuting traffic not funneled through Warwick.
Consider overwhelming number of objections previously received.
Gwrthwynebu
Preferred Options
ID sylw: 50045
Derbyniwyd: 26/07/2012
Ymatebydd: J A & P L Robinson
Gateway job creation will increase traffic on congested Myton Road at peak times and roads in historic Warwick.
Lack of detail for infrastructure.
No impact studies.
Population growth and demand for homes cannot be verified.
Growth without employment would create commuting.
Schools oversubscribed.
No capacity for more cars at stations. Hospital would require expansion.
Land is area of restraint, put forward as untouchable green barrier to separate Warwick from Leamington. It is rich agricultural land. Hedgerows provide habitats for many species.
Threat of flooding increased.
One of first areas to be developed in plan.
Whole plan should be withdrawn and alternative presented reflecting opinion of Warwick population and preserving historical county town.
Gwrthwynebu
Preferred Options
ID sylw: 50074
Derbyniwyd: 25/06/2012
Ymatebydd: Miss Jennifer Instone
Objects to the following sites the following sites as there are considered to be too many houses already in the vicinity of these proposed allocations.
Myton Gardens
South of Gallows Hill / Europa Way
Blackdown
Woodside Farm
Gwrthwynebu
Preferred Options
ID sylw: 50080
Derbyniwyd: 25/06/2012
Ymatebydd: Mr Andrew Instone
Objects to Myton Gardens Suburb as it is considered that there are too many houses already in the vicinity
Gwrthwynebu
Preferred Options
ID sylw: 50094
Derbyniwyd: 12/07/2012
Ymatebydd: Roger Speck
The site is too extensive and should be reduced in size.
Brownfield sites should be developed instead.
Gwrthwynebu
Preferred Options
ID sylw: 50145
Derbyniwyd: 03/08/2012
Ymatebydd: Mr & Mrs Peter & Linda Bromley
Nifer y bobl: 2
The area to the West of Europa Way was identified as an area of restraint at the time of planning the Warwick Technology Park. The green space threatened in this area is valued rich agricultural land, essential for food self-sufficiency, environmentally precious landscape with many wildlife habitats and biodiversity including badger setts and also prevents coalescence which you declare is one of your aims. Our existing green space provides open space, sports and recreation and such land, including playing fields, should not be built on!
Gwrthwynebu
Preferred Options
ID sylw: 50166
Derbyniwyd: 28/07/2012
Ymatebydd: Ms Alison Cox
Job creation likely to be near Coventry therefore extra traffic through Warwick morning and evening, locking uphighly congested roads at peak times and historic layout of Warwick.
Junction improvement at Myton/Banbury Road redundant. Avon Bridge bottleneck and constrained road layout and traffic calming in town centre means provision would not ease backlog.
Danger to public health due to air pollution which is in breach of regulations.
Lack of infrastructure.
Warwick already subject considerable housing expansion.
Area of restraint; untouchable green buffer separating Warwick and Leamington.
Rich agricultural land.
Hedges provide habitats for many species.
Threat of flooding to local houses.
Area one of first to be developed but should be last to allow viable alternative to be found.
Overwhelming opposition to last consultation.
Gwrthwynebu
Preferred Options
ID sylw: 50240
Derbyniwyd: 26/07/2012
Ymatebydd: Lenco Investments
Asiant : RPS Planning & Development
The site is currently within an Area of Restraint with part of the site being a Minerals Consultation Area.
Gwrthwynebu
Preferred Options
ID sylw: 50339
Derbyniwyd: 27/07/2012
Ymatebydd: Colin Sharp
There would be increased traffic leading to congestion through Warwick as people travel to employment areas and proposed road improvement are unlikely to have an impact .
There is a risk of increased pollution levels and a reduction in air quality including in areas already classed as having poor air quality and which WDC are committed to tackling .
Current infrarstructure (roads, schools, health) could not sustain the growth.
Development at Europa Way will increase the flood risk and there would also be a loss in wildlife and habitat.
Warwick has already bee subject to a lot of urban fringe development and the area at Euroipa Way was supposed to be protected. This is also high quality agricultural land.
The increased volume of traffic would be too much for the infrastructure to cope with in its current state.
These proposasl werre subject to significnat objection 2 years ago. This should be considered.
Gwrthwynebu
Preferred Options
ID sylw: 50369
Derbyniwyd: 20/07/2012
Ymatebydd: Mrs Luisa Hodge
I object to the urban fringe development of Myton Garden Suburb and South of Gallows Hill/West of Europa Way. As no doubt you are, aware Warwick has geographical limitations because of the river and historical centre. Traffic from the Myton Road area is funnelled onto the Banbury Road Bridge and through the constricted town centre. The preferred Options would necessitate that perhaps an extra thousand cars per day would need to cross Warwick in order to reach the A46. I foresee massive irresolvable problems with traffic by increasing the number of cars on roads, which cannot be improved or widened.
Gwrthwynebu
Preferred Options
ID sylw: 50649
Derbyniwyd: 01/08/2012
Ymatebydd: graham leeke
The nis a key gap separating the towns as identified in existing local plan. It provides an attractive approach to Leamington. It should therefore be subject to only very limited development
Gwrthwynebu
Preferred Options
ID sylw: 50713
Derbyniwyd: 20/02/2013
Ymatebydd: The Warwick Society
The allocation of land south east of Warwick between the Banbury Road and Europa Way does exactly what the preferred options say that they wish to avoid, merging the built - up areas to their east and west.
The northern part of Gallows Hill, would make Warwick, Leamington and Whitnash into a continuous sprawling urban area.
Gwrthwynebu
Preferred Options
ID sylw: 50778
Derbyniwyd: 27/07/2012
Ymatebydd: Kenneth McEwan
The infrastructure could not cope with the number of houses planned.
There would be an inbalance with some areas provided for but others not having the correct amount of infrastructure.
Social behaviour could suffer with the creation of large estates.
It goes against vision for district.
Utilities would also be stretxhed espeically if an emegency occurred.
There would be increased pollution from increased traffic.
Green space needs preserving.
Gwrthwynebu
Preferred Options
ID sylw: 50847
Derbyniwyd: 18/07/2012
Ymatebydd: Mr & Mrs D Bridge
Objects to the development of land south of Warwick at Gallows Hill and Europa Way. Proposed job creation towards Coventry will increase by several thousand the amount of people travelling through Warwick affecting the highly congested Myton Road, Banbury Road and Europa Way at peak times and also the historic road layout of Warwick. Suggested improvements would not ease the backlog down Myton Road due to the constrained road layout and traffic calming in the Town centre. Nitrogen Dioxide (N02)levels already exceed maximum levels in Warwick Town Centre and development will further affect public health. Existing infrastructure is at capacity with the current population and will not sustain increased numbers.
Land at Myton was designated as an area of restraint to separate Warwick and Leamington and provides habitats for a range of species. Development in this area would threaten local houses with flooding as occured when development at the Trinity School site was developed. THis area should be developed last and protected until alternative sites can be found. Further development should be concentrated in areas where transport infrastructure can be improved and which arent constrained by historic town layout and subject to air quality issues.
Gwrthwynebu
Preferred Options
ID sylw: 50850
Derbyniwyd: 18/07/2012
Ymatebydd: Mr M.I Cooper
Objects to the development of land south of Warwick at Gallows Hill and Europa Way. Proposed job creation towards Coventry will increase by several thousand the amount of people travelling through Warwick affecting the highly congested Myton Road, Banbury Road and Europa Way at peak times and also the historic road layout of Warwick. Suggested improvements would not ease the backlog down Myton Road due to the constrained road layout and traffic calming in the Town centre. Nitrogen Dioxide (N02)levels already exceed maximum levels in Warwick Town Centre and development will further affect public health. Existing infrastructure is at capacity with the current population and will not sustain increased numbers.
Land at Myton was designated as an area of restraint to separate Warwick and Leamington and provides habitats for a range of species. Development in this area would threaten local houses with flooding as occured when development at the Trinity School site was developed. THis area should be developed last and protected until alternative sites can be found. Further development should be concentrated in areas where transport infrastructure can be improved and which arent constrained by historic town layout and subject to air quality issues.
Gwrthwynebu
Preferred Options
ID sylw: 50853
Derbyniwyd: 18/07/2012
Ymatebydd: Mr & Mrs Inns
Objects to the development of land south of Warwick at Gallows Hill and Europa Way. Proposed job creation towards Coventry will increase by several thousand the amount of people travelling through Warwick affecting the highly congested Myton Road, Banbury Road and Europa Way at peak times and also the historic road layout of Warwick. Suggested improvements would not ease the backlog down Myton Road due to the constrained road layout and traffic calming in the Town centre. Nitrogen Dioxide (N02)levels already exceed maximum levels in Warwick Town Centre and development will further affect public health. Existing infrastructure is at capacity with the current population and will not sustain increased numbers.
Land at Myton was designated as an area of restraint to separate Warwick and Leamington and provides habitats for a range of species. Development in this area would threaten local houses with flooding as occured when development at the Trinity School site was developed. THis area should be developed last and protected until alternative sites can be found. Further development should be concentrated in areas where transport infrastructure can be improved and which arent constrained by historic town layout and subject to air quality issues.